Riverview Energy Systems
20000 Grange Rd, Riverview, MI 48192Plant Summary Information
Riverview Energy Systems is ranked #8 out of 23 landfill gas power plants in Michigan in terms of total annual net electricity generation.
Riverview Energy Systems is comprised of 2 generators and generated 6.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Riverview Energy Systems |
---|---|
Utility Name | Riverview Energy Systems |
Location | Wayne County, MI |
Initial Operation Date | January 1988 |
Last Update | Dec 2023 |
Annual Generation | 28.3 GWh |
Annual Consumption | 656.6 k MMBtu |
Ranked #4,624 out of 11,852 Power Plants Nationwide | |
Ranked #98 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #119 out of 256 Michigan Power Plants | |
Ranked #8 out of 23 Michigan Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Riverview Energy Systems
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverview Energy Systems.
Monthly Net Generation for Riverview Energy Systems
Riverview Energy Systems Details
Summary Information | |
---|---|
Plant Name | Riverview Energy Systems (54057) |
Plant Address | 20000 Grange Rd, Riverview, MI 48192 |
Utility | Riverview Energy Systems (16073) |
Latitude, Longitude | 42.16611, -83.2129 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1988 |
Annual Generation | 28.3 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 87-677-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | DTE Electric Company (5109) MI |
Grid Voltage | 41.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating January 1988
Technology | Landfill Gas |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | n/a |
RTO ISO Location Designation For Reporting Wholesale Sales Data | n/a |
Nameplate Capacity | 3.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3.2 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1988 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GEN2 Details Operating January 1988
Technology | Landfill Gas |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 3.3 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.8 MW |
Winter Capacity | 3.2 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1988 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Riverview Energy Systems Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#88 | Suburban Landfill Gas Recovery | Glenford, OH | 30.5 GWh |
#89 | Brevard | Cocoa, FL | 30.4 GWh |
#90 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.3 GWh |
#91 | Stanton Energy Center | Orlando, FL | 4.0 TWh |
#92 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh |
#93 | Ameresco Delaware South | Georgetown, DE | 29.6 GWh |
#94 | Mahoning | New Springfield, OH | 28.9 GWh |
#95 | Lincoln Landfill | Lincoln, CA | 28.8 GWh |
#96 | Ameresco Keller Canyon | Bay Point, CA | 28.7 GWh |
#97 | Model City Energy Facility | Youngstown, NY | 28.6 GWh |
#99 | Bavarian LFGTE | Walton, KY | 27.9 GWh |
#100 | Sarasota County LFGTE Facility | Nokomis, FL | 27.8 GWh |
#101 | Ameresco Dallas LLC | Dallas, TX | 27.8 GWh |
#102 | Riverbend Landfill | McMinnville, OR | 27.7 GWh |
#103 | Richmond Energy | Henrico, VA | 27.3 GWh |
#104 | Lennon Generating | Lennon, MI | 27.3 GWh |
#105 | Brown County LFGTE Power Station | Georgetown, OH | 27.0 GWh |
#106 | Liberty I & II LFGTE | Monticello, IN | 26.7 GWh |
#107 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 26.5 GWh |
#108 | MM Lopez Energy | Lake View Terrace, CA | 26.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverview Energy Systems.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Corewell Health Dearborn Campus | Dearborn, MI | 30.0 MWh | 8.7 mi |
Dearborn Energy Center | Dearborn, MI | 251.9 GWh | 9.1 mi |
Dearborn Industrial Generation | Dearborn, MI | 5.7 TWh | 9.9 mi |
Delray | Detroit, MI | 21.4 GWh | 10.5 mi |
Domino Farms Solar | Ann Arbor, MI | 1.3 GWh | 26.3 mi |
East. Michigan Univ. Heating Plant | Ypsilanti, MI | 37.0 GWh | 22 mi |
Fermi | Frenchtown Twp, MI | 8.3 TWh | 14.2 mi |
French Landing Dam | Belleville, MI | 3.1 GWh | 12.1 mi |
GRS Arbor Hills | Northville, MI | 1.2 GWh | 23.7 mi |
IKEA Canton Rooftop PV System | Canton, MI | 84.0 MWh | 15.5 mi |
Monroe (MI) | Monroe, MI | 12.9 TWh | 20.2 mi |
Northeast (MI) | Warren, MI | 1.8 GWh | 21.6 mi |
O'Shea Solar Farm | Detroit, MI | 2.9 GWh | 14.7 mi |
Slocum | Trenton, MI | 96.3 MWh | 3.3 mi |
Sumpter | Belleville, MI | 120.0 GWh | 16.3 mi |
Sumpter Energy Associates | Belleville, MI | 58.0 GWh | 15.2 mi |
Trenton Channel | Trenton, MI | 574.8 GWh | 3.5 mi |
University of Michigan | Ann Arbor, MI | 218.3 GWh | 27.9 mi |
Warner Lambert | Ann Arbor, MI | 21.3 GWh | 26.8 mi |
Wyandotte | Wyandotte, MI | 85.0 MWh | 4.5 mi |