Riverstart Solar Park LLC
3999 W 700 S, Modoc, IN 47358Plant Summary Information
Riverstart Solar Park LLC is ranked #38 out of 203 power plants in Indiana in terms of total annual net electricity generation.
Riverstart Solar Park LLC generated 51.7 GWh during the 3-month period between November 2024 to February 2025.
Plant Name | Riverstart Solar Park LLC |
---|---|
Utility Name | Riverstart Solar Park LLC |
Location | Randolph County, IN |
Initial Operation Date | December 2021 |
Last Update | Feb 2025 |
Annual Generation | 394.5 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,554 out of 11,993 Power Plants Nationwide | |
Ranked #115 out of 5,778 Solar Power Plants Nationwide | |
Ranked #38 out of 203 Indiana Power Plants | |
Ranked #2 out of 108 Indiana Solar Power Plants | |
Fuel Types | Solar |
Map of Riverstart Solar Park LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverstart Solar Park LLC.
Monthly Net Generation for Riverstart Solar Park LLC
Riverstart Solar Park LLC Details
Summary Information | |
---|---|
Plant Name | Riverstart Solar Park LLC (64553) |
Plant Address | 3999 W 700 S, Modoc, IN 47358 |
Utility | Riverstart Solar Park LLC (64181) |
Latitude, Longitude | 40.04624, -85.04509 |
Generation Dates on File | Dec 2021 to Feb 2025 |
Initial Operation Date | December 2021 |
Annual Generation | 394.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Indiana Michigan Power Co (9324) IN |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN01 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 220 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Riverstart Solar Park LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#105 | Mount Signal Solar Farm II | Calexico, CA | 409.8 GWh |
#106 | Big Plain Solar, LLC | London, OH | 408.4 GWh |
#107 | Yellow Pine Solar | Enterprise, NV | 392.9 GWh |
#108 | Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh |
#109 | Mesquite Solar 1 | Tonopah, AZ | 403.9 GWh |
#110 | Castle Gap Solar Hybrid | McCarney, TX | 400.9 GWh |
#111 | Brazoria West | Damon, TX | 401.6 GWh |
#112 | Tres Bahias | Port Lavaca, TX | 401.2 GWh |
#113 | North Rosamond Solar LLC | Rosamond, CA | 397.7 GWh |
#114 | Mustang Two | Lemoore, CA | 397.0 GWh |
#116 | RE Garland | Rosamond, CA | 383.7 GWh |
#117 | Shakes Solar | Carrizo Springs, TX | 391.9 GWh |
#118 | Buena Vista Energy Center | Chaparral, NM | 386.3 GWh |
#119 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#120 | Brazoria County Solar Project (Danciger) | Damon, TX | 387.3 GWh |
#121 | Mockingbird Solar Center | Brookston, TX | 387.0 GWh |
#122 | Hillcrest Solar | Mt. Orab, OH | 386.2 GWh |
#123 | Holstein 1 Solar Farm | Wingate, TX | 384.9 GWh |
#124 | Buckthorn Westex | Ft. Stockton, TX | 383.3 GWh |
#125 | Chestnut | Lemoore, CA | 377.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverstart Solar Park LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bitter Ridge Wind Farm, LLC | Redkey, IN | 374.9 GWh | 22 mi |
Bluff Point Wind Facility | Portland, IN | 381.5 GWh | 19.2 mi |
Centerville Solar Park | Centerville, IN | 2.0 GWh | 15.2 mi |
Greenville Electric Generating Station | Greenville, OH | 68.5 GWh | 22.8 mi |
Headwaters Wind Farm II LLC | Losanville, IN | 553.1 GWh | 8.6 mi |
Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh | 2.2 mi |
Henry County | New Castle, IN | 243.9 GWh | 25.1 mi |
IMPA Richmond Solar Park | Richmond, IN | 770.0 MWh | 18.7 mi |
IMPA Richmond Solar Park 7 | Richmond, IN | 986.0 MWh | 16.7 mi |
Jay County LFGTE | Portland, IN | 17.0 GWh | 23.2 mi |
New Castle Solar RES | New Castle, IN | 1.3 GWh | 23.2 mi |
Richmond | Centerville, IN | 13.6 GWh | 14.9 mi |
Richmond 5 | Peru, IN | 17.5 GWh | 18.9 mi |
Richmond 6 | Richmond, IN | 3.3 GWh | 18.8 mi |
Richmond Solar Park 3 | Richmond, IN | 10.6 GWh | 18.4 mi |
Richmond Solar Park 4 | Richmond, IN | 12.9 GWh | 14.1 mi |
Richmond Solar Site 2 | Richmond, IN | 13.3 GWh | 19.1 mi |
Riverstart Solar Park III | Modoc, IN | 35.8 GWh | 4.4 mi |
Whirlpool Corp-Greenville Wind Farm | Greenville, OH | 10.3 GWh | 23.7 mi |
Whitewater Valley | RICHMOND, IN | 16.3 GWh | 18.6 mi |