Riverside Solar
3040 Universal Drive, Ruskin, FL 33570Plant Summary Information
Riverside Solar is ranked #109 out of 171 solar farms in Florida in terms of total annual net electricity generation.
Riverside Solar generated 26.4 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Riverside Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Hillsborough County, FL |
Initial Operation Date | December 2022 |
Last Update | Sep 2024 |
Annual Generation | 105.8 GWh |
Annual Consumption | 390.5 k MMBtu |
Ranked #3,120 out of 11,852 Power Plants Nationwide | |
Ranked #581 out of 5,655 Solar Power Plants Nationwide | |
Ranked #183 out of 279 Florida Power Plants | |
Ranked #109 out of 171 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Riverside Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverside Solar.
Monthly Net Generation for Riverside Solar
Riverside Solar Details
Summary Information | |
---|---|
Plant Name | Riverside Solar (65687) |
Plant Address | 3040 Universal Drive, Ruskin, FL 33570 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.68368, -82.47243 |
Generation Dates on File | Dec 2022 to Sep 2024 |
Initial Operation Date | December 2022 |
Annual Generation | 105.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 55.2 MW |
Summer Capacity | 55.2 MW |
Winter Capacity | 55.2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2022 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 66.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Riverside Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#571 | Kellam Solar | Ben Wheeler, TX | 108.6 GWh |
#572 | Lick Creek Solar, LLC | Walnut Cove, NC | 108.6 GWh |
#573 | Durrance | Mulberry, FL | 108.3 GWh |
#574 | Franklin Solar Hybrid | Twin Falls, ID | 108.2 GWh |
#575 | Misenheimer Solar LLC | Gold Hill, NC | 107.9 GWh |
#576 | SR DeSoto III | DeSoto, GA | 107.7 GWh |
#577 | SR Turkey Creek, LLC | Lancaster, KY | 106.7 GWh |
#578 | Turquoise Nevada, LLC | Sparks, NV | 106.4 GWh |
#579 | Luning Energy | Luning, NV | 106.1 GWh |
#580 | Hawtree Solar | Warrenton, NC | 106.1 GWh |
#582 | Alafia Solar | Mulberry, FL | 105.4 GWh |
#583 | Blue Harvest Solar Park | Continental, OH | 105.0 GWh |
#584 | Sugar Solar, LLC | Yadkinville, NC | 105.0 GWh |
#585 | Nature Trail | TBD, FL | 104.2 GWh |
#586 | Timber Road Solar Park | Payne, OH | 104.1 GWh |
#587 | Horseshoe Solar, LLC | Tooele, UT | 103.9 GWh |
#588 | Crystal Hill Solar | Crystal Hill, VA | 103.9 GWh |
#589 | Sparkleberry | Molino, FL | 103.9 GWh |
#590 | Grange Hall Solar | Wimauma, FL | 103.3 GWh |
#591 | Bladen Solar | Fayetteville, NC | 103.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverside Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Balm Solar | Wimauma, FL | 130.3 GWh | 15.5 mi |
Bayboro | St. Petersburg, FL | 4.5 GWh | 11.2 mi |
Big Bend | Apollo Beach, FL | 7.7 TWh | 8.7 mi |
Big Bend Agrivoltaics | Apollo Beach, FL | 1.5 GWh | 8.1 mi |
Big Bend Floating Solar I | Gibsonton, FL | 1.7 GWh | 8.6 mi |
Big Bend II Solar | Apollo Beach, FL | 82.7 GWh | 8.4 mi |
Elder Branch | Parrish, FL | 172.3 GWh | 14.7 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 4.9 TWh | 15.7 mi |
John Hopkins Middle School Microgrid | St Petersburg, FL | 39.0 MWh | 12.6 mi |
Little Manatee River Solar | Ruskin, FL | 135.8 GWh | 3.8 mi |
Manatee | Parrish, FL | 7.1 TWh | 9.4 mi |
Manatee Solar Energy Center | Parrish, FL | 4.5 GWh | 8.9 mi |
McKay Bay Facility | Tampa, FL | 68.8 GWh | 18.6 mi |
Mosaic Co Tampa Facility | Riverview, FL | 129.5 GWh | 13.2 mi |
P L Bartow | St. Petersburg, FL | 6.2 TWh | 14.5 mi |
Pinellas County Resource Recovery | St. Petersburg, FL | 412.0 GWh | 18 mi |
Southfork Solar | Parrish, FL | 172.5 GWh | 18.8 mi |
Three Creeks | Parrish, FL | 118.2 GWh | 14.8 mi |
Tropicana Products Bradent | Bradenton, FL | 188.1 GWh | 14.6 mi |
Wimauma Solar | Wimauma, FL | 132.3 GWh | 13.2 mi |