Riverside Holyoke
30 Water Street, Holyoke, MA 1040Plant Summary Information
Riverside Holyoke is ranked #33 out of 598 power plants in Massachusetts in terms of total annual net electricity generation.
Riverside Holyoke is comprised of 4 generators and generated 9.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Riverside Holyoke |
---|---|
Utility Name | City of Holyoke Gas and Electric Dept. |
Location | Hampden County, MA |
Initial Operation Date | January 1906 |
Last Update | Dec 2023 |
Annual Generation | 40.4 GWh |
Annual Consumption | 145.5 k MMBtu |
Ranked #4,134 out of 11,835 Power Plants Nationwide | |
Ranked #561 out of 1,371 Water Power Plants Nationwide | |
Ranked #33 out of 598 Massachusetts Power Plants | |
Ranked #6 out of 29 Massachusetts Water Power Plants | |
Fuel Types | Water |
Map of Riverside Holyoke
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverside Holyoke.
Monthly Net Generation for Riverside Holyoke
Riverside Holyoke Details
Summary Information | |
---|---|
Plant Name | Riverside Holyoke (1607) |
Plant Address | 30 Water Street, Holyoke, MA 1040 |
Utility | City of Holyoke Gas and Electric Dept. (8776) |
Latitude, Longitude | 42.20059, -72.59443 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1906 |
Annual Generation | 40.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Connecticut River |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Holyoke - (MA) (8774) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 4 Details Operating January 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1906 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating January 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1906 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 7 Details Operating January 1922
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1922 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 8 Details Operating January 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Riverside Holyoke Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#551 | Shoshone Falls | Twin Falls, ID | 42.3 GWh |
#552 | McClure Dam | Marquette, MI | 42.2 GWh |
#553 | Forks of Butte Hydro Project | Magalia, CA | 41.9 GWh |
#554 | Green Lake | Sitka, AK | 41.8 GWh |
#555 | Bulls Bridge | New Milford, CT | 41.8 GWh |
#556 | Tims Ford | Winchester, TN | 41.7 GWh |
#557 | Dalles Dam North Fishway Project | The Dalles, OR | 41.6 GWh |
#558 | Wisconsin Rapids | Wisconsin Rapids, WI | 41.3 GWh |
#559 | Sly Creek | Forbestown, CA | 41.1 GWh |
#560 | Rush Creek | June lake, CA | 40.4 GWh |
#562 | Eagle Pass | Eagle Pass, TX | 40.3 GWh |
#563 | Bridgewater | Morganton, NC | 40.3 GWh |
#564 | PHP 1 | Sandy, OR | 40.2 GWh |
#565 | Remmel | Malvern, AR | 39.7 GWh |
#566 | Lower No 1 | Idaho Falls, ID | 39.6 GWh |
#567 | Laurel Dam | London, KY | 39.6 GWh |
#568 | Soda Springs | Idleyld Park, OR | 39.5 GWh |
#569 | Broadwater Power Project | Toston, MT | 39.4 GWh |
#570 | Deerfield 2 | Conway, MA | 39.4 GWh |
#571 | City Power Plant | Idaho Falls, ID | 39.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverside Holyoke.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 14.1 GWh | 4 mi |
Boatlock | Holyoke, MA | 21.3 GWh | 0.7 mi |
Cabot Holyoke | Holyoke, MA | 6.1 GWh | 0.8 mi |
CED Chicopee Solar | Chicopee, MA | 4.9 GWh | 2.2 mi |
Chemical | Holyoke, MA | 7.4 GWh | 1 mi |
Chicopee | Chicopee, MA | 2.5 GWh | 4.5 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.4 GWh | 2.9 mi |
Chicopee River Solar | Springfield, MA | 3.0 GWh | 4.1 mi |
Chicopee Solar | Chicopee, MA | 4.5 GWh | 1.2 mi |
Dwight | Chicopee, MA | 9.8 GWh | 3.6 mi |
Front Street | Chicopee, MA | 476.0 MWh | 3.6 mi |
Granby LFG | Granby, MA | 2.9 GWh | 3 mi |
Granby Solar, LLC CSG | Granby, MA | 5.6 GWh | 4.1 mi |
Hadley Falls | Holyoke, MA | 218.2 GWh | 0.9 mi |
Holyoke Solar Cooperative at Mueller | Holyoke, MA | 3.9 GWh | 4.6 mi |
Kearsarge Granby | Granby, MA | 3.8 GWh | 4.7 mi |
Ludlow Landfill | Ludlow, MA | 3.3 GWh | 4.6 mi |
Masspower | Indian Orchard, MA | 609.1 GWh | 4.7 mi |
Mt. Tom Solar Project Hybrid | Holyoke, MA | 5.3 GWh | 4.7 mi |
Stony Brook | Ludlow, MA | 26.3 GWh | 4.3 mi |