Riverside Generating LLC
25038 Hwy 23, Catlettsburg, KY 41129Plant Summary Information
Riverside Generating LLC is ranked #14 out of 54 power plants in Kentucky in terms of total annual net electricity generation.
Riverside Generating LLC is comprised of 5 generators and generated 216.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Riverside Generating LLC |
---|---|
Utility Name | Riverside Generating Co LLC |
Location | Lawrence County, KY |
Initial Operation Date | July 2001 |
Last Update | Sep 2024 |
Annual Generation | 612.1 GWh |
Annual Consumption | 8.7 M MMBtu |
Ranked #1,074 out of 11,852 Power Plants Nationwide | |
Ranked #521 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #14 out of 54 Kentucky Power Plants | |
Ranked #6 out of 16 Kentucky Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Riverside Generating LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverside Generating LLC.
Monthly Net Generation for Riverside Generating LLC
Riverside Generating LLC Details
Summary Information | |
---|---|
Plant Name | Riverside Generating LLC (55198) |
Plant Address | 25038 Hwy 23, Catlettsburg, KY 41129 |
Utility | Riverside Generating Co LLC (16124) |
Latitude, Longitude | 38.19166, -82.60459 |
Generation Dates on File | Jul 2001 to Sep 2024 |
Initial Operation Date | July 2001 |
Annual Generation | 612.1 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 00-99-000; '02-36-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Big Sandy Water District |
Ash Impoundment | No |
Transmission / Distribution Owner | Kentucky Power Co (22053) KY |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | TENNESSEE GAS PIPELINE COMPANY |
Natural Gas Storage | No |
Generator GTG1 Details Operating July 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AEP RIVERSIDE 1CT (DYN) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AEP RIVERSIDE 1CT (DYN) |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 190 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTG2 Details Operating July 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AEP RIVERSIDE 2CT (DYN) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AEP RIVERSIDE 2CT (DYN) |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 190 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTG3 Details Operating July 2001
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AEP RIVERSIDE 3CT (DYN) |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AEP RIVERSIDE 3CT (DYN) |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 190 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTG4 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AEP FOOT HILLS 4 CT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AEP FOOT HILLS 4 CT |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 190 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTG5 Details Operating June 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AEP FOOT HILLS 5 CT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AEP FOOT HILLS 5 CT |
Nameplate Capacity | 230 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165 MW |
Winter Capacity | 190 MW |
Minimum Load | 120 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Riverside Generating LLC Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#511 | T H Wharton | Houston, TX | 648.9 GWh |
#512 | SPA Cogen 3 | Sacramento, CA | 648.6 GWh |
#513 | J K Smith | Winchester, KY | 641.4 GWh |
#514 | Topaz Generating | Texas City, TX | 640.6 GWh |
#515 | Cleveland Cnty Generating Facility | Kings Mountain, NC | 640.9 GWh |
#516 | ExxonMobil Baton Rouge Turbine Generator | Baton Rouge, LA | 639.9 GWh |
#517 | Power Station 4 | Texas City, TX | 629.1 GWh |
#518 | Greenidge Generation LLC | Dresden, NY | 624.1 GWh |
#519 | Belle River | China Twp, MI | 6.1 TWh |
#520 | Vandolah Power Station | Wauchula, FL | 624.7 GWh |
#522 | Morris Cogeneration LLC | Morris, IL | 611.5 GWh |
#523 | Tennessee Eastman Operations | Kingsport, TN | 1.1 TWh |
#524 | Alliant Energy Neenah | Neenah, WI | 610.1 GWh |
#525 | Masspower | Indian Orchard, MA | 609.1 GWh |
#526 | John R Kelly | Gainesville, FL | 603.3 GWh |
#527 | Hunlock Power Station | Hunlok Creek, PA | 603.0 GWh |
#528 | SCA Cogen 2 | Sacramento, CA | 602.6 GWh |
#529 | R D Green | Robards, KY | 601.9 GWh |
#530 | Freeport LP Pretreatment Facility | Freeport, TX | 598.3 GWh |
#531 | Bethpage Power Plant | Hicksville, NY | 594.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverside Generating LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Big Sandy | Louisa, KY | 1.2 TWh | 1.6 mi |
Big Sandy Peaker Plant | Kenona, WV | 325.0 GWh | 10.5 mi |
Ceredo Generating Station | Huntington, WV | 327.3 GWh | 12.8 mi |
Gavin Power, LLC | Cheshire, OH | 12.0 TWh | 57.7 mi |
Glen Ferris Hydro | Gauley Bridge, WV | 11.3 GWh | 75.6 mi |
Green Valley LFGTE | Ashland, KY | 16.9 GWh | 18 mi |
Greenup Hydro | Franklin Furnace, OH | 262.2 GWh | 34.4 mi |
H L Spurlock | Maysville, KY | 7.8 TWh | 74.5 mi |
Hanging Rock Energy Facility | Ironton, OH | 9.6 TWh | 28.1 mi |
Haverhill North Cogeneration Facility | Franklin Furnace, OH | 353.4 GWh | 30.5 mi |
Hawks Nest Hydro | Gauley Bridge, WV | 435.2 GWh | 77.7 mi |
John E Amos | St Albans, WV | 9.1 TWh | 46.6 mi |
Kyger Creek | Cheshire, OH | 4.7 TWh | 56.2 mi |
London | Handley, WV | 65.1 GWh | 67 mi |
Marmet | Marmet, WV | 58.7 GWh | 56.3 mi |
Morehead Generating Facility | Morehead, KY | 3.9 GWh | 51 mi |
Mountaineer | New Haven, WV | 5.6 TWh | 65.4 mi |
Racine | Racine, OH | 215.3 GWh | 62.6 mi |
Rolling Hills Generating | Wilkesville, OH | 2.3 TWh | 63.4 mi |
Winfield | Winfield, WV | 110.5 GWh | 44 mi |