River Mountains Solar
1299 Burkholder, Henderson, NV 89015Plant Summary Information
River Mountains Solar is ranked #43 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
River Mountains Solar generated 5.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | River Mountains Solar |
---|---|
Utility Name | River Mountains Solar, LLC |
Location | Clark County, NV |
Initial Operation Date | January 2016 |
Last Update | Dec 2023 |
Annual Generation | 28.9 GWh |
Annual Consumption | 102.0 k MMBtu |
Ranked #4,592 out of 11,835 Power Plants Nationwide | |
Ranked #1,012 out of 5,643 Solar Power Plants Nationwide | |
Ranked #87 out of 109 Nevada Power Plants | |
Ranked #43 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of River Mountains Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for River Mountains Solar.
Monthly Net Generation for River Mountains Solar
River Mountains Solar Details
Summary Information | |
---|---|
Plant Name | River Mountains Solar (59747) |
Plant Address | 1299 Burkholder, Henderson, NV 89015 |
Utility | River Mountains Solar, LLC (59514) |
Latitude, Longitude | 36.03162, -114.9294 |
Generation Dates on File | Jan 2016 to Dec 2023 |
Initial Operation Date | January 2016 |
Annual Generation | 28.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Colorado River Comm of Nevada (4356) NV |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 1 Details Operating January 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 14.4 MW |
Summer Capacity | 14.4 MW |
Winter Capacity | 14.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 18 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
River Mountains Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1002 | Baker City Solar | Baker City, OR | 29.5 GWh |
#1003 | Blackville Solar II | Blackville, SC | 29.4 GWh |
#1004 | Elizabeth Solar Plant | Pitkin, LA | 29.4 GWh |
#1005 | Rincon Solar I | Rincon, GA | 29.2 GWh |
#1006 | Wildflower Solar 1 | Elverta, CA | 29.1 GWh |
#1007 | SR Jenkins Ft Lupton | Ft. Lupton, CO | 29.0 GWh |
#1008 | Depot Solar Center, LLC | Rustburg, VA | 29.0 GWh |
#1009 | Oceana Solar | Virginia Beach, VA | 29.0 GWh |
#1010 | Crane Solar Facility | Crane, IN | 29.0 GWh |
#1011 | Orion Solar I | Arvin, CA | 28.9 GWh |
#1013 | North Lancaster Ranch | Lancaster, CA | 28.9 GWh |
#1014 | Central Antelope Dry Ranch C | Lancaster, CA | 28.8 GWh |
#1015 | NY8 - Janis Solar | Willet, NY | 28.6 GWh |
#1016 | Java Solar, LLC | Lemoore, CA | 28.6 GWh |
#1017 | Cumblerland Land Holdings, LLC | Elkmont, AL | 28.6 GWh |
#1018 | Boykin PV1 | Wade, NC | 28.6 GWh |
#1019 | Coronal Lost Hills | Lost Hills, CA | 28.6 GWh |
#1020 | Dogwood Solar, LLC | Scotland Neck, NC | 28.5 GWh |
#1021 | Two Mile Desert Project | Hertford, NC | 28.3 GWh |
#1022 | Morgan's Corner | Elizabeth City, NC | 28.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding River Mountains Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 124.4 GWh | 12.6 mi |
Clark (NVE) | Las Vegas, NV | 693.0 GWh | 7.8 mi |
Copper Mountain Solar 3 | Boulder City, NV | 610.5 GWh | 10 mi |
Dignity - Siena Campus | Henderson, NV | 2.9 GWh | 10.6 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.5 TWh | 10.8 mi |
Hoover Dam (NV) | Boulder City, NV | 1.4 TWh | 10.8 mi |
IGS LAS1 | Henderson, NV | 1.0 GWh | 12.9 mi |
Las Vegas WPCF Solar Plant | Las Vegas, NV | 5.8 GWh | 9.2 mi |
Nellis Solar PV II | North Las Vegas, NV | 38.0 GWh | 13.8 mi |
Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 454.0 GWh | 13.7 mi |
Saguaro Power | Henderson, NV | 210.4 GWh | 4.7 mi |
Solar Las Vegas MB 2, LLC | Las Vegas, NV | 3.7 GWh | 14.3 mi |
Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh | 14.1 mi |
Sun Peak Generating Station | Las Vegas, NV | 31.6 GWh | 9.4 mi |
Techren Solar I LLC | Boulder, NV | 196.8 GWh | 12.7 mi |
Techren Solar II LLC | Boulder, NV | 515.8 GWh | 11.5 mi |
Techren Solar III LLC | Boulder, NV | 59.4 GWh | 13.2 mi |
Techren Solar IV LLC | Boulder, NV | 58.5 GWh | 9.6 mi |
Techren Solar V | Boulder, NV | 118.5 GWh | 9.1 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 444.2 GWh | 7 mi |