Rio Nogales Power Project

711 Rio Nogales Drive, Seguin, TX 78155

Plant Summary Information

Rio Nogales Power Project is ranked #26 out of 758 power plants in Texas in terms of total annual net electricity generation.

Rio Nogales Power Project is comprised of 4 generators and generated 1.6 TWh during the 3-month period between July 2024 to October 2024.

Plant NameRio Nogales Power Project
Utility NameCity of San Antonio - (TX)
LocationGuadalupe County, TX
Initial Operation DateMay 2002
Last Update Oct 2024
Annual Generation 5.1 TWh
Annual Consumption 39.9 M MMBtu
Ranked #211 out of 11,866 Power Plants Nationwide
Ranked #103 out of 2,254 Natural Gas Power Plants Nationwide
Ranked #26 out of 758 Texas Power Plants
Ranked #18 out of 304 Texas Natural Gas Power Plants
Fuel Types Natural Gas

Map of Rio Nogales Power Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rio Nogales Power Project.

Create Your Account Today

Monthly Net Generation for Rio Nogales Power Project

Rio Nogales Power Project Details

Summary Information
Plant NameRio Nogales Power Project (55137)
Plant Address711 Rio Nogales Drive, Seguin, TX 78155
UtilityCity of San Antonio - (TX) (16604)
Latitude, Longitude29.59306, -97.97322
Generation Dates on FileFeb 2002 to Oct 2024
Initial Operation DateMay 2002
Annual Generation 5.1 TWh
Fuel Types Natural Gas
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceMunicipality
Ash Impoundment No
Transmission / Distribution OwnerLower Colorado River Authority (11269)
Grid Voltage 345.00 kV
Energy StorageNo
 
Natural Gas Information
Pipeline Name ENTERPRISE TEXAS PIPELINE
Natural Gas StorageNo

Generator CTG1 Details Operating May 2002

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationRIONOG_CT1
RTO ISO Location Designation For Reporting Wholesale Sales DataRIONOG_CT1
Nameplate Capacity189 MW
Nameplate Power Factor0.85
Summer Capacity165.5 MW
Winter Capacity203 MW
Minimum Load100 MW
Uprate/Derate Completed Yes
Uprate Or Derate CompletedJuly 2023
StatusOperating
First Operation DateMay 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator CTG2 Details Operating May 2002

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationRIONOG_CT2
RTO ISO Location Designation For Reporting Wholesale Sales DataRIONOG _CT2
Nameplate Capacity189 MW
Nameplate Power Factor0.85
Summer Capacity158 MW
Winter Capacity193 MW
Minimum Load100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Planned Net Summer Capacity Uprate3 MW
Planned Net Winter Capacity Uprate3 MW
Planned UprateApril 2025
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator CTG3 Details Operating May 2002

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Combustion Turbine Part
Unit CodeCC1
OwnershipSingle Owner
Can Bypass Heat Recovery Steam GeneratorNo
RTO ISO LMP Node DesignationRIONOG_CT3
RTO ISO Location Designation For Reporting Wholesale Sales DataRIONOG_CT3
Nameplate Capacity189 MW
Nameplate Power Factor0.85
Summer Capacity158 MW
Winter Capacity193 MW
Minimum Load100 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Planned Net Summer Capacity Uprate3 MW
Planned Net Winter Capacity Uprate3 MW
Planned UprateApril 2024
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Generator STG1 Details Operating May 2002

TechnologyNatural Gas Fired Combined Cycle
Prime MoverCombined Cycle Steam Part
Unit CodeCC1
OwnershipSingle Owner
Duct BurnersYes
RTO ISO LMP Node DesignationRIONOG_ST1
RTO ISO Location Designation For Reporting Wholesale Sales DataRIONOG_ST1
Nameplate Capacity373.2 MW
Nameplate Power Factor0.85
Summer Capacity303 MW
Winter Capacity319 MW
Minimum Load50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2002
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceNatural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Rio Nogales Power Project Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Natural Gas.

RankPlant NamePlant LocationAnnual Generation
#93Hickory Run Energy StationNew Castle, PA5.3 TWh
#94Baytown Energy CenterBaytown, TX5.3 TWh
#95Choctaw CountyFrench Camp, MS5.3 TWh
#96CPV Valley Energy CenterWawayanda, NY5.2 TWh
#97E B Harris Electric Generating PlantAutaugaville, AL5.2 TWh
#98Zeeland Generating StationZeeland, MI5.2 TWh
#99Pasadena CogenerationPasadena, TX5.2 TWh
#100St. Charles Power Station (LA)La Place, LA5.2 TWh
#101Washington Energy FacilityBeverly, OH5.1 TWh
#102Port EvergladesFt. Lauderdale, FL5.1 TWh
#104Brandy BranchBaldwin, FL5.1 TWh
#105TVA Southaven Combined CycleSouthaven, MS5.0 TWh
#106Redbud Power PlantLuther, OK5.0 TWh
#107Keys Energy CenterBrandywine, MD5.0 TWh
#108H L Culbreath Bayside Power StationTampa, FL5.0 TWh
#109PSEG Linden Generating StationLinden, NJ5.0 TWh
#110OuachitaSterlington, LA5.0 TWh
#111JasperHardeeville, SC5.0 TWh
#112Plaquemine Cogeneration PlantPlaquemine, LA4.9 TWh
#113West Riverside Energy CenterBeloit, WI4.9 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Rio Nogales Power Project.

Plant NamePlant LocationAnnual GenerationDistance
Abbott TP 3McQueeney, TX5.5 GWh4.1 mi
Blue Wing Solar Energy GenerationSan Antonio, TX17.8 GWh32.5 mi
CanyonCanyon Lake, TX1.0 MWh23.3 mi
CPS 1 Community SolarAdkins, TX1.8 GWh23.2 mi
Dunlap TP 1New Brannfels, TX698.0 MWh5.4 mi
FELPS 1 - CalaverasFloresville, TX2.1 GWh30.7 mi
FELPS 2 - CalaverasFloresville, TX2.1 GWh30.7 mi
FELPS 3 - Floresville SouthFloresville, TX2.2 GWh33 mi
Guadalupe Generating StationMarion, TX6.9 TWh10.4 mi
Hays Energy ProjectSan Marcos, TX5.4 TWh13 mi
HEB_CPSSADCSan Antonio, TX1.2 GWh26.3 mi
IKEA Live Oak Rooftop PV SystemLive Oak, TX2.1 GWh18.4 mi
J K SpruceSan Antonio, TX5.8 TWh28.6 mi
Mesquite Creek LFGTE ProjectNew Braunfels, TX21.4 GWh10.4 mi
Niagara Bottling - SeguinSeguin, TX8.1 GWh0.4 mi
NolteSeguin, TX2.4 GWh4.6 mi
O W SommersSan Antonio, TX1.9 TWh28.9 mi
OCI Alamo 2, LLCConverse, TX9.5 GWh23.2 mi
OCI Alamo 3 LLCSan Antonio, TX10.3 GWh21 mi
OCI Alamo 4, LLCBrackettville, TX78.9 GWh21.1 mi