Rio Nogales Power Project
711 Rio Nogales Drive, Seguin, TX 78155Plant Summary Information
Rio Nogales Power Project is ranked #26 out of 758 power plants in Texas in terms of total annual net electricity generation.
Rio Nogales Power Project is comprised of 4 generators and generated 1.6 TWh during the 3-month period between July 2024 to October 2024.
Plant Name | Rio Nogales Power Project |
---|---|
Utility Name | City of San Antonio - (TX) |
Location | Guadalupe County, TX |
Initial Operation Date | May 2002 |
Last Update | Oct 2024 |
Annual Generation | 5.1 TWh |
Annual Consumption | 39.9 M MMBtu |
Ranked #211 out of 11,866 Power Plants Nationwide | |
Ranked #103 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #26 out of 758 Texas Power Plants | |
Ranked #18 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Rio Nogales Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rio Nogales Power Project.
Monthly Net Generation for Rio Nogales Power Project
Rio Nogales Power Project Details
Summary Information | |
---|---|
Plant Name | Rio Nogales Power Project (55137) |
Plant Address | 711 Rio Nogales Drive, Seguin, TX 78155 |
Utility | City of San Antonio - (TX) (16604) |
Latitude, Longitude | 29.59306, -97.97322 |
Generation Dates on File | Feb 2002 to Oct 2024 |
Initial Operation Date | May 2002 |
Annual Generation | 5.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ENTERPRISE TEXAS PIPELINE |
Natural Gas Storage | No |
Generator CTG1 Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | RIONOG_CT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | RIONOG_CT1 |
Nameplate Capacity | 189 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 165.5 MW |
Winter Capacity | 203 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | Yes |
Uprate Or Derate Completed | July 2023 |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG2 Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | RIONOG_CT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | RIONOG _CT2 |
Nameplate Capacity | 189 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 158 MW |
Winter Capacity | 193 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Planned Net Summer Capacity Uprate | 3 MW |
Planned Net Winter Capacity Uprate | 3 MW |
Planned Uprate | April 2025 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CTG3 Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | RIONOG_CT3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | RIONOG_CT3 |
Nameplate Capacity | 189 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 158 MW |
Winter Capacity | 193 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2002 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Planned Net Summer Capacity Uprate | 3 MW |
Planned Net Winter Capacity Uprate | 3 MW |
Planned Uprate | April 2024 |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator STG1 Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | RIONOG_ST1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | RIONOG_ST1 |
Nameplate Capacity | 373.2 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 303 MW |
Winter Capacity | 319 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Rio Nogales Power Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#93 | Hickory Run Energy Station | New Castle, PA | 5.3 TWh |
#94 | Baytown Energy Center | Baytown, TX | 5.3 TWh |
#95 | Choctaw County | French Camp, MS | 5.3 TWh |
#96 | CPV Valley Energy Center | Wawayanda, NY | 5.2 TWh |
#97 | E B Harris Electric Generating Plant | Autaugaville, AL | 5.2 TWh |
#98 | Zeeland Generating Station | Zeeland, MI | 5.2 TWh |
#99 | Pasadena Cogeneration | Pasadena, TX | 5.2 TWh |
#100 | St. Charles Power Station (LA) | La Place, LA | 5.2 TWh |
#101 | Washington Energy Facility | Beverly, OH | 5.1 TWh |
#102 | Port Everglades | Ft. Lauderdale, FL | 5.1 TWh |
#104 | Brandy Branch | Baldwin, FL | 5.1 TWh |
#105 | TVA Southaven Combined Cycle | Southaven, MS | 5.0 TWh |
#106 | Redbud Power Plant | Luther, OK | 5.0 TWh |
#107 | Keys Energy Center | Brandywine, MD | 5.0 TWh |
#108 | H L Culbreath Bayside Power Station | Tampa, FL | 5.0 TWh |
#109 | PSEG Linden Generating Station | Linden, NJ | 5.0 TWh |
#110 | Ouachita | Sterlington, LA | 5.0 TWh |
#111 | Jasper | Hardeeville, SC | 5.0 TWh |
#112 | Plaquemine Cogeneration Plant | Plaquemine, LA | 4.9 TWh |
#113 | West Riverside Energy Center | Beloit, WI | 4.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rio Nogales Power Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Abbott TP 3 | McQueeney, TX | 5.5 GWh | 4.1 mi |
Blue Wing Solar Energy Generation | San Antonio, TX | 17.8 GWh | 32.5 mi |
Canyon | Canyon Lake, TX | 1.0 MWh | 23.3 mi |
CPS 1 Community Solar | Adkins, TX | 1.8 GWh | 23.2 mi |
Dunlap TP 1 | New Brannfels, TX | 698.0 MWh | 5.4 mi |
FELPS 1 - Calaveras | Floresville, TX | 2.1 GWh | 30.7 mi |
FELPS 2 - Calaveras | Floresville, TX | 2.1 GWh | 30.7 mi |
FELPS 3 - Floresville South | Floresville, TX | 2.2 GWh | 33 mi |
Guadalupe Generating Station | Marion, TX | 6.9 TWh | 10.4 mi |
Hays Energy Project | San Marcos, TX | 5.4 TWh | 13 mi |
HEB_CPSSADC | San Antonio, TX | 1.2 GWh | 26.3 mi |
IKEA Live Oak Rooftop PV System | Live Oak, TX | 2.1 GWh | 18.4 mi |
J K Spruce | San Antonio, TX | 5.8 TWh | 28.6 mi |
Mesquite Creek LFGTE Project | New Braunfels, TX | 21.4 GWh | 10.4 mi |
Niagara Bottling - Seguin | Seguin, TX | 8.1 GWh | 0.4 mi |
Nolte | Seguin, TX | 2.4 GWh | 4.6 mi |
O W Sommers | San Antonio, TX | 1.9 TWh | 28.9 mi |
OCI Alamo 2, LLC | Converse, TX | 9.5 GWh | 23.2 mi |
OCI Alamo 3 LLC | San Antonio, TX | 10.3 GWh | 21 mi |
OCI Alamo 4, LLC | Brackettville, TX | 78.9 GWh | 21.1 mi |