Rio Bravo Solar II LLC
2.5 Mile NE of Intersection Hw, McKittrick, CA 93251Plant Summary Information
Rio Bravo Solar II LLC is ranked #153 out of 799 solar farms in California in terms of total annual net electricity generation.
Rio Bravo Solar II LLC generated 8.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Rio Bravo Solar II LLC |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Kern County, CA |
Initial Operation Date | December 2016 |
Last Update | Dec 2023 |
Annual Generation | 48.0 GWh |
Annual Consumption | 170.6 k MMBtu |
Ranked #3,901 out of 11,835 Power Plants Nationwide | |
Ranked #787 out of 5,643 Solar Power Plants Nationwide | |
Ranked #471 out of 1,569 California Power Plants | |
Ranked #153 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Infigen Asset Management LLC (2013 to 2013) Infigen Energy US Development LLC (2014 to 2014) SunPower Corporation, Systems (2015 to 2015) Rio Bravo Solar II, LLC (2016 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of Rio Bravo Solar II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rio Bravo Solar II LLC.
Monthly Net Generation for Rio Bravo Solar II LLC
Rio Bravo Solar II LLC Details
Summary Information | |
---|---|
Plant Name | Rio Bravo Solar II LLC (59250) |
Plant Address | 2.5 Mile NE of Intersection Hw, McKittrick, CA 93251 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 35.4225, -119.62917 |
Generation Dates on File | Dec 2016 to Dec 2023 |
Initial Operation Date | December 2016 |
Annual Generation | 48.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20 MW |
Summer Capacity | 19.5 MW |
Winter Capacity | 14.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 26 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Rio Bravo Solar II LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Leeward Asset Management, LLC | 6688 N. Central Expressway, Suite 500, Dallas, TX 75206 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#777 | Picture Rocks Solar, LLC | Marana, AZ | 49.0 GWh |
#778 | Dry Bridge Solar (Brown University) | North Kingstown, RI | 49.0 GWh |
#779 | Midway Solar Farm III | Calipatria, CA | 48.9 GWh |
#780 | Simon Solar Farm LLC | Social Circle, GA | 48.6 GWh |
#781 | Robin Hollow Solar | West Greenwich, RI | 48.5 GWh |
#782 | Wonderful Lost Hills | Lost Hills, CA | 48.3 GWh |
#783 | Three Corners Solar | Unity, ME | 48.3 GWh |
#784 | Shafter Solar LLC | Bakersfield, CA | 48.2 GWh |
#785 | Gaston Solar Power Plant | Cherryville Township, NC | 48.1 GWh |
#786 | Red Horse III | Wilcox, AZ | 48.1 GWh |
#788 | RE Garland A | Rosamond, CA | 47.9 GWh |
#789 | Long Island Solar Farm LLC | Upton, NY | 47.8 GWh |
#790 | Vega Solar | Los Banos, CA | 47.7 GWh |
#791 | CED Ducor 1 | Ducor, CA | 47.7 GWh |
#792 | NextEra Westside PV | Five Points, CA | 47.7 GWh |
#793 | Rawhide Prairie Solar Hybrid | Wellington, CO | 47.3 GWh |
#794 | Simcoe Solar | Mountain Home, ID | 47.4 GWh |
#795 | Bayshore Solar A, LLC | Lancaster, CA | 47.4 GWh |
#796 | SR Odom | Moultrie, GA | 47.4 GWh |
#797 | Westmoreland County Solar Project | WARSAW, VA | 47.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rio Bravo Solar II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ABEC #2 dba West-Star Dairy | Buttonwillow, CA | 8.5 GWh | 11.6 mi |
Berry NMW Cogens | Bakersfield, CA | 71.7 GWh | 8 mi |
Chevron - Lost Hills Hybrid | Lost Hills, CA | 65.3 GWh | 14.1 mi |
Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 25.3 GWh | 12.1 mi |
Cymric 31X Cogen | McKittrick, CA | 37.2 GWh | 4.4 mi |
Cymric 36W Cogen | McKittrick, CA | 54.4 GWh | 4.9 mi |
Cymric 6Z Cogen | McKittrick, CA | 37.1 GWh | 5.3 mi |
Elk Hills Cogen | Tupman, CA | 80.7 GWh | 7.2 mi |
Elk Hills Power LLC | Tupman, CA | 2.3 TWh | 13.3 mi |
La Paloma Generating Plant | McKittrick, CA | 2.3 TWh | 9 mi |
McKittrick Cogen | McKittrick, CA | 58.5 GWh | 7.6 mi |
McKittrick Limited | Bakersfield, CA | 14.4 GWh | 7.4 mi |
Midway Sunset Cogen | Fellows, CA | 244.2 GWh | 13.5 mi |
Pumpjack Solar I | McKittrick, CA | 43.8 GWh | 8.1 mi |
Rio Bravo Solar 1 LLC | McKittrick, CA | 46.5 GWh | 3 mi |
South Belridge Cogeneration Facility | McKittrick, CA | 487.7 GWh | 4.5 mi |
Welport Lease Project | McKittrick, CA | 20.7 GWh | 5 mi |
Wildwood Solar I, LLC | Wasco, CA | 44.7 GWh | 13.7 mi |
Wonderful Huller & Shellling | Lost Hills, CA | 3.8 GWh | 13.9 mi |
Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh | 8.6 mi |