Richland County Landfill
1703 Screaming Eagle Road, Lugoff, SC 29078Plant Summary Information
Richland County Landfill is ranked #4 out of 8 landfill gas power plants in South Carolina in terms of total annual net electricity generation.
Richland County Landfill is comprised of 3 generators and generated 3.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Richland County Landfill |
---|---|
Utility Name | South Carolina Public Service Authority |
Location | Richland County, SC |
Initial Operation Date | January 2006 |
Last Update | Dec 2023 |
Annual Generation | 12.1 GWh |
Annual Consumption | 232.6 k MMBtu |
Ranked #5,629 out of 11,835 Power Plants Nationwide | |
Ranked #208 out of 299 Landfill Gas Power Plants Nationwide | |
Ranked #93 out of 190 South Carolina Power Plants | |
Ranked #4 out of 8 South Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Richland County Landfill
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Richland County Landfill.
Monthly Net Generation for Richland County Landfill
Richland County Landfill Details
Summary Information | |
---|---|
Plant Name | Richland County Landfill (56122) |
Plant Address | 1703 Screaming Eagle Road, Lugoff, SC 29078 |
Utility | South Carolina Public Service Authority (17543) |
Latitude, Longitude | 34.103, -80.79049 |
Generation Dates on File | Jan 2006 to Dec 2023 |
Initial Operation Date | January 2006 |
Annual Generation | 12.1 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | South Carolina Public Service Authority (SC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Tri-County Electric Coop, Inc (14175) SC |
Grid Voltage | 25.00 kV |
Energy Storage | No |
Generator R1 Details Operating January 2006
Technology | Landfill Gas |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 5.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5.2 MW |
Winter Capacity | 5.2 MW |
Minimum Load | 3.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2006 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator R2 Details Operating December 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator R3 Details Operating December 2010
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Richland County Landfill Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#198 | MMSD Jones Island Wastewater | Milwaukee, WI | 61.7 GWh |
#199 | Nashua Plant | Nashua, NH | 13.8 GWh |
#200 | Dry Creek LFG to Energy Project | Eagle Point, OR | 13.5 GWh |
#201 | CG PS Portfolio 1, LLC | Kathleen, GA | 13.3 GWh |
#202 | Croda Atlas Point CHP | New Castle, DE | 13.2 GWh |
#203 | Tullytown | Morrisville, PA | 13.2 GWh |
#204 | New River | Dublin, VA | 13.7 GWh |
#205 | Bannock County LFG to Energy | Pocatello, ID | 12.7 GWh |
#206 | Davidson Gas Producers LLC | Lexington, NC | 12.3 GWh |
#207 | Columbia (MO) | Columbia, MO | 16.6 GWh |
#209 | Autumn Hills Generating Facility | Zeeland, MI | 11.8 GWh |
#210 | Lake Gas Recovery | Northbrook, IL | 11.8 GWh |
#211 | Southbridge Landfill Gas-to-Energy | Southbridge, MA | 11.7 GWh |
#212 | Winnebago County Landfill Gas | Oshkosh, WI | 11.4 GWh |
#213 | Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh |
#214 | Bi-County Gas Producers | Woodlawn, TN | 11.2 GWh |
#215 | Renewable Energy Services of Ohio | Milan, OH | 11.1 GWh |
#216 | Berlin Landfill Gas | Berlin, WI | 11.1 GWh |
#217 | Glades Pike Generation Plant | Somerset, PA | 11.1 GWh |
#218 | Onslow Power Producers | Jacksonville, NC | 10.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Richland County Landfill.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cedar Creek | Great Falls, SC | 138.7 GWh | 30.7 mi |
Coit GT | Columbia, SC | 400.0 MWh | 16.6 mi |
Columbia Energy Center (SC) | Gaston, SC | 2.8 TWh | 20.7 mi |
Dearborn | Great Falls, SC | 86.9 GWh | 32 mi |
Eastover Solar | Eastover, SC | 138.1 GWh | 15.2 mi |
Gaston II | Swansea, SC | 9.8 GWh | 29 mi |
Gaston Solar I - SC | Gaston, SC | 20.1 GWh | 29.2 mi |
Gunsight Solar, LLC | Swansea, SC | 173.6 GWh | 28.4 mi |
Lee County Landfill | Bishopville, SC | 22.6 GWh | 30.4 mi |
McMeekin | Columbia, SC | 882.6 GWh | 24.6 mi |
Midlands | St. Matthews, SC | 147.8 GWh | 32.6 mi |
Otarre Solar Park | Cayce, SC | 2.8 GWh | 19 mi |
Parr GT | Jenkinsville, SC | 3.1 GWh | 32.8 mi |
Parr Hydro | Jenkinsville, SC | 46.9 GWh | 32.8 mi |
Saluda Lexington | Columbia, SC | 109.5 GWh | 24.7 mi |
St. Matthews Solar | Matthews, SC | 19.3 GWh | 28.8 mi |
Sylvamo Corporation Eastover Facility | Eastover, SC | 558.8 GWh | 17.2 mi |
V C Summer | Jenkinsville, SC | 8.7 TWh | 32.9 mi |
Wateree | Eastover, SC | 2.1 TWh | 21.4 mi |
Wateree Hydro | Ridgeway, SC | 201.3 GWh | 16.8 mi |