Richard B Russell is ranked #35 out of 239 power plants in Georgia in terms of total annual net electricity generation.
Richard B Russell is comprised of 8 generators and generated 40.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Richard B Russell |
---|---|
Utility Name | USCE-Savannah District |
Location | Elbert County, GA |
Initial Operation Date | January 1985 |
Last Update | Sep 2024 |
Annual Generation | 318.4 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,781 out of 11,852 Power Plants Nationwide | |
Ranked #148 out of 1,371 Water Power Plants Nationwide | |
Ranked #35 out of 239 Georgia Power Plants | |
Ranked #3 out of 27 Georgia Water Power Plants | |
Fuel Types | Water |
Map of Richard B Russell
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Richard B Russell.
Monthly Net Generation for Richard B Russell
Richard B Russell Details
Summary Information | |
---|---|
Plant Name | Richard B Russell (6132) |
Plant Address | 4144 Russell Dam Drive, Elberton, GA 30635 |
Utility | USCE-Savannah District (19375) |
Latitude, Longitude | 34.0256, -82.5953 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | January 1985 |
Annual Generation | 318.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southeastern Power Administration (SEPA) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Savannah River |
Ash Impoundment | No |
Transmission / Distribution Owner | Georgia Transmission Corp (7197) |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator 1 Details Operating January 1985
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1985 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating February 1985
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | February 1985 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 3 Details Operating July 1985
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 1985 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 4 Details Operating January 1986
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 84 MW |
Winter Capacity | 84 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1986 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 5 Details Out of Service September 2002
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | September 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 6 Details Operating September 2002
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 7 Details Operating September 2002
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 8 Details OA September 2002
Technology | Hydroelectric Pumped Storage |
---|---|
Prime Mover | Pumped Storage |
Ownership | Single Owner |
Nameplate Capacity | 82 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 82 MW |
Winter Capacity | 82 MW |
Minimum Load | 70 MW |
Uprate/Derate Completed | No |
Status | OA |
---|---|
First Operation Date | September 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Richard B Russell Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#138 | John H Kerr | Boydton, VA | 340.0 GWh |
#139 | Electra | Jackson, CA | 337.8 GWh |
#140 | Caribou 2 | Belden, CA | 337.6 GWh |
#141 | Stanislaus | Vallecito, CA | 334.5 GWh |
#142 | Belden | Belden, CA | 332.6 GWh |
#143 | Lucky Peak Power Plant Project | Boise, ID | 331.8 GWh |
#144 | S C Moore | Littleton, NH | 327.6 GWh |
#145 | Martin Dam | Dadeville, AL | 326.6 GWh |
#146 | Spring Creek | Redding, CA | 321.7 GWh |
#147 | Walters | Waterville, NC | 321.0 GWh |
#149 | Gaston | Roanoke Rapids, NC | 318.0 GWh |
#150 | Millers Ferry | Camden, AL | 315.3 GWh |
#151 | Pit 4 | Big Bend, CA | 311.4 GWh |
#152 | Robert S Kerr | Keota, OK | 309.2 GWh |
#153 | Center Hill | Lancaster, TN | 308.1 GWh |
#154 | Chelan | Wenatchee, WA | 305.8 GWh |
#155 | Bellows Falls | Bellow Falls, VT | 304.5 GWh |
#156 | Snettisham | Juneau, AK | 302.1 GWh |
#157 | Cherokee Dam | Rudledge, TN | 301.3 GWh |
#158 | H M Jackson | Sultan, WA | 298.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Richard B Russell.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anderson (SC) | Anderson, SC | 4.0 GWh | 32.7 mi |
Augusta Solar | Greenwood, SC | 4.1 GWh | 27.5 mi |
Bluebird Solar SC LLC | Pendleton, SC | 6.6 GWh | 40.5 mi |
Boyds Mill Hydro | Ware Shoals, SC | 3.8 GWh | 37.3 mi |
Briarwood | Greenwood, SC | 3.9 GWh | 28.6 mi |
CII Methane Management III LFG Plant | Winterville, GA | 5.4 GWh | 38.9 mi |
Columbia Substation | Appling, GA | 3.9 GWh | 35.9 mi |
Comer Solar | Comer, GA | 3.8 GWh | 31.8 mi |
Gold Mine | Bradley, SC | 3.1 GWh | 21.4 mi |
Greene Durham | Union Point, GA | 5.1 GWh | 39.5 mi |
GRP Madison Renewable Energy Facility | Colbert, GA | 377.1 GWh | 34.2 mi |
Hartwell Energy Facility | Hartwell, GA | 207.1 GWh | 25.2 mi |
Hartwell Lake | Hartwell, GA | 378.9 GWh | 26.3 mi |
Hollidays Bridge Hydro | Honea Path, SC | 9.3 GWh | 36.9 mi |
Honea Path | Honea Path, SC | 66.0 MWh | 31.6 mi |
J Strom Thurmond | Clarks Hill, SC | 632.4 GWh | 34.1 mi |
John S Rainey | Starr, SC | 4.1 TWh | 24.5 mi |
Rocky River (SC) | Iva, SC | 5.6 GWh | 16 mi |
Sonny Solar LLC | Elberton, GA | 78.9 GWh | 7.5 mi |
Woodfields Solar | Greenwood, SC | 4.3 GWh | 28.7 mi |