Rhinelander Mill

515 W Davenport Street, Rhinelander, WI 54501

Plant Summary Information

Rhinelander Mill is ranked #55 out of 66 hydroelectric power plants in Wisconsin in terms of total annual net electricity generation.

Rhinelander Mill is comprised of 5 generators and generated 1.7 GWh during the 3-month period between October 2024 to January 2025.

Plant NameRhinelander Mill
Utility NameAhlstrom-Munksjo
LocationOneida County, WI
Initial Operation DateDecember 1917
Last Update Jan 2025
Annual Generation 5.0 GWh
Annual Consumption 2.4 M MMBtu
Ranked #7,798 out of 11,979 Power Plants Nationwide
Ranked #1,161 out of 1,369 Water Power Plants Nationwide
Ranked #149 out of 217 Wisconsin Power Plants
Ranked #55 out of 66 Wisconsin Water Power Plants
Fuel Types Water
Previous Operator Expera Specialty Solutions (2013 to 2017)
Ahlstrom-Munksjo (2018 to 2023)

Map of Rhinelander Mill

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rhinelander Mill.

Create Your Account Today

Monthly Net Generation for Rhinelander Mill

10k10k8k8k6k6k4k4k2k2k00200120012002200220032003200420042005200520062006200720072008200820092009201020102011201120122012201320132014201420152015201620162017201720182018201920192020202020212021202220222023202320242024
Download SVG
Download PNG
Download CSV

Rhinelander Mill Details

Summary Information
Plant NameRhinelander Mill (50933)
Plant Address515 W Davenport Street, Rhinelander, WI 54501
UtilityAhlstrom-Munksjo (61707)
Latitude, Longitude45.6394, -89.4205
Generation Dates on FileJan 2001 to Jan 2025
Initial Operation DateDecember 1917
Annual Generation 5.0 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS Code (322122)
Sector Industrial CHP (7)
Water SourceWisconsin River
Ash Impoundment No
Transmission / Distribution OwnerWisconsin Public Service Corp (20860) WI
Grid Voltage 115.00 kV
Energy StorageNo
 
Natural Gas Information
Local Distribution Company (LDC)WISCONSIN PUB SVC CORP
Pipeline Name ANR PIPELINE COMPANY
ANR PIPELINE COMPANY
Natural Gas StorageNo

Generator HYD1 Details Operating December 1917

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor0.8
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 1917
Combined Heat & Power No
Sector NameIndustrial CHP (7)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator HYD2 Details Operating December 1917

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Nameplate Power Factor0.8
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Minimum Load0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 1917
Combined Heat & Power No
Sector NameIndustrial CHP (7)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator HYD3 Details Operating December 1926

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity1 MW
Nameplate Power Factor0.8
Summer Capacity1 MW
Winter Capacity1 MW
Minimum Load0.6 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 1926
Combined Heat & Power No
Sector NameIndustrial CHP (7)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M

Generator GEN5 Details Standby February 1951

TechnologyNatural Gas Steam Turbine
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity10 MW
Nameplate Power Factor0.85
Summer Capacity4 MW
Winter Capacity7 MW
Minimum Load3 MW
Uprate/Derate Completed No
StatusStandby
Synchronized To Transmission GridNo
First Operation DateFebruary 1951
Combined Heat & Power Yes
Sector NameIndustrial CHP (7)
Topping Or BottomingB
Energy SourceNatural Gas / Distillate Fuel Oil
Startup SourceNatural Gas / Distillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsYes
Cofire FuelsNo
Switch Between Oil And Natural GasYes
Multifuel Details
Switch When OperatingYes
Net Summer Capacity With Natural Gas4 MW
Net Winter Capacity With Natural Gas7 MW
Net Summer Capacity With Oil4 MW
Net Winter Capacity With Oil7 MW
Time To Switch From Gas To Oil6H
Time To Switch From Oil To Gas6H
Factors That Limit SwitchingYes
Storage LimitsYes
Air Permit LimitsYes

Generator GEN6 Details Operating July 1958

TechnologyConventional Steam Coal
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity9.3 MW
Nameplate Power Factor0.8
Summer Capacity6.3 MW
Winter Capacity8.5 MW
Minimum Load3.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 1958
Combined Heat & Power Yes
Sector NameIndustrial CHP (7)
Topping Or BottomingB
Energy SourceBituminous Coal
Startup SourceDistillate Fuel Oil
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Other Combustion TechnologyYes
Subcritical TechnologyYes
Multiple FuelsNo
Cofire FuelsNo
Switch Between Oil And Natural GasNo

Rhinelander Mill Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#1151Messalonskee 5Waterville, ME5.1 GWh
#1152Thundermist HydroProvidence, RI5.1 GWh
#1153Pepperell Hydro Power PlantPepperell, MA5.1 GWh
#1154Lake MathewsRiverside, CA5.1 GWh
#1155Tallassee Hydro ProjectClarke, GA5.1 GWh
#1156Foothills Hydro PlantLittleton, CO5.1 GWh
#1157Alice Falls Hydro ProjectKeeseville, NY5.0 GWh
#1158Yorba LindaYorba Linda, CA5.0 GWh
#1159White River (WI)Ashland, WI5.0 GWh
#1160Somersworth Lower Great DamSomersworth, NH5.0 GWh
#1162Granby HydroGranby, CO4.9 GWh
#1163Head of U Canal Hydro ProjectJerome, ID4.9 GWh
#1164HeuveltonVillage of Heuvelton, NY4.9 GWh
#1165EmporiaEmporia, VA4.9 GWh
#1166Salmon FallsSouth Berwick, ME4.9 GWh
#1167Beaver Valley Patterson DamBeaver Falls, PA4.8 GWh
#1168KleberOnaway, MI4.8 GWh
#1169Mora Drop Hydroelectric ProjectKuna, ID4.8 GWh
#1170Blind Canyon HydroWendell, ID4.8 GWh
#1171TuckasegeeTuckasegee, NC4.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Rhinelander Mill.

Plant NamePlant LocationAnnual GenerationDistance
AlexanderMerrill, WI19.0 GWh35.2 mi
Caldron FallsTown of Stephenson, WI12.5 GWh60.8 mi
Crystal FallsCrystal Falls, MI5.4 GWh61.4 mi
Domtar Paper Company RothschildRothschild, WI3.1 GWh53 mi
Flambeau Crowley Rapids ProjectPark Falls, WI3.5 GWh58.3 mi
Flambeau Lower ProjectPark Falls, WI2.8 GWh53 mi
Flambeau Solar PartnersPhillips, WI4.5 GWh51.1 mi
Grandfather FallsIrma, WI76.4 GWh29.4 mi
Hat RapidsRhinelander, WI5.9 GWh5.5 mi
Hodag SolarRhinelander, WI13.2 GWh2.2 mi
Medford DPC SolarMedford, WI2.9 GWh56.7 mi
MerrillMerrill, WI8.2 GWh34.3 mi
Mosinee MillMosinee, WI122.9 GWh60.3 mi
Packaging of America Tomahawk MillTomahawk, WI112.9 GWh20.4 mi
PineFlorence, WI12.1 GWh58 mi
Rothschild Biomass Cogen FacilityRothschild, WI143.2 GWh52.9 mi
TomahawkTomahawk, WI6.5 GWh20.3 mi
WausauWausau, WI22.8 GWh48.3 mi
WestonRothschild, WI4.0 TWh55 mi
Weston RICEKronenwetter, WI48.9 GWh55.3 mi