Resurgence Solar
41100 US Highway 395, Boron, CA 93516Plant Summary Information
Resurgence Solar is ranked #76 out of 806 solar farms in California in terms of total annual net electricity generation.
Resurgence Solar generated 44.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Resurgence Solar |
---|---|
Utility Name | Resurgence Solar |
Location | San Bernardino County, CA |
Initial Operation Date | August 2023 |
Last Update | Dec 2024 |
Annual Generation | 233.0 GWh |
Annual Consumption | 873.0 k MMBtu |
Ranked #2,163 out of 11,949 Power Plants Nationwide | |
Ranked #232 out of 5,739 Solar Power Plants Nationwide | |
Ranked #240 out of 1,577 California Power Plants | |
Ranked #76 out of 806 California Solar Power Plants | |
Fuel Types | Solar |
Map of Resurgence Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Resurgence Solar.
Monthly Net Generation for Resurgence Solar
Resurgence Solar Details
Summary Information | |
---|---|
Plant Name | Resurgence Solar (64489) |
Plant Address | 41100 US Highway 395, Boron, CA 93516 |
Utility | Resurgence Solar (64135) |
Latitude, Longitude | 35.00656, -117.54484 |
Generation Dates on File | Aug 2023 to Dec 2024 |
Initial Operation Date | August 2023 |
Annual Generation | 233.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 115.00 kV |
Energy Storage | Yes |
Generator GEN1 Details Operating August 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 90 MW |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 108.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator GEN2 Details Operating August 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 75 MW |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 300 |
---|---|
Maximum Charge Rate | 75 MW |
Maximum Discharge Rate | 75 MW |
Storage Technology | OTH |
Nameplate Reactive Power Rating | 29.6 |
Storage Enclosure Type | CS |
Arbitrage | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 64489 |
Direct Support Gen Id | GEN1 |
Support T D Asset | No |
Resurgence Solar Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#222 | Ivanpah 2 | Nipton, CA | 268.7 GWh |
#223 | Fish Springs | Reno, NV | 251.4 GWh |
#224 | Nebula Solar | La Feria, TX | 254.4 GWh |
#225 | Milford Solar 1 | Milford, UT | 253.5 GWh |
#226 | OCI Alamo 7 LLC | Haskell, TX | 250.2 GWh |
#227 | East Pecos Solar | McCamey, TX | 247.4 GWh |
#228 | Playa Solar 2 | North Las Vegas, NV | 246.9 GWh |
#229 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 246.7 GWh |
#230 | Antelope Expansion 2 | Lancaster, CA | 246.1 GWh |
#231 | Wilmot Energy Center LLC | Tucson, AZ | 243.1 GWh |
#233 | Elara Solar | Pearsall, TX | 244.0 GWh |
#234 | Comanche Solar | Pueblo, CO | 242.5 GWh |
#235 | South Cheyenne Solar | South Greeley, WY | 242.3 GWh |
#236 | Yellow Pine II | Enterprise, NV | 233.6 GWh |
#237 | SR Snipesville II | Denton, GA | 239.7 GWh |
#238 | East Line Solar | Coolidge, AZ | 239.1 GWh |
#239 | SR Snipesville III | Denton, GA | 238.0 GWh |
#240 | Alamo 6 | Fort Stockton, TX | 237.9 GWh |
#241 | Maverick Solar 4, LLC | Desert Center, CA | 237.5 GWh |
#242 | Oak Trail Solar, LLC | Moyock, NC | 237.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Resurgence Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo Solar | Oro Grande, CA | 43.7 GWh | 25 mi |
Baldy Mesa Solar & Storage | Adelanto, CA | 31.3 GWh | 27.9 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 25.6 mi |
California City | California City, CA | 5.3 GWh | 26.8 mi |
EAFB - North Base | Edwards Air Force Bas, CA | 2.6 GWh | 21.1 mi |
EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh | 21.1 mi |
Edwards Air Force Base | Edwards, CA | 866.0 MWh | 22.3 mi |
Hudson - High Desert Hybrid | Victorville, CA | 283.7 GWh | 27.4 mi |
Lockhart ESS, LLC | Hinkley, CA | 19.1 GWh | 10.8 mi |
Lockhart Solar PV II | Hinkley, CA | 185.6 GWh | 11.4 mi |
Lockhart Solar PV, LLC | Hinkley, CA | 224.5 GWh | 10.8 mi |
Madelyn Solar, LLC | Silver Lake, CA | 2.5 GWh | 20.7 mi |
Mitchell Solar, LLC | Silver Lake, CA | 2.6 GWh | 20.9 mi |
Mojave Solar Project | Hinkley, CA | 629.1 GWh | 11.7 mi |
Resurgence Solar II | Boron, CA | 128.2 GWh | 0 mi |
Rudy Solar, LLC | Silver Lake, CA | 2.6 GWh | 20.8 mi |
SEGS IX | Hinkley, CA | 112.0 GWh | 11.8 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 246.7 GWh | 28.2 mi |
US Borax | Boron, CA | 270.9 GWh | 9 mi |
Watts 3115 | Adelanto, CA | 3.3 GWh | 28.6 mi |