Resurgence Solar II
41100 US Hwy 395, Boron, CA 93516Plant Summary Information
Resurgence Solar II is ranked #98 out of 799 solar farms in California in terms of total annual net electricity generation.
Resurgence Solar II generated 43.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Resurgence Solar II |
---|---|
Utility Name | Resurgence Solar II |
Location | San Bernardino County, CA |
Initial Operation Date | August 2023 |
Last Update | Aug 2024 |
Annual Generation | 124.9 GWh |
Annual Consumption | 506.1 k MMBtu |
Ranked #2,895 out of 11,835 Power Plants Nationwide | |
Ranked #454 out of 5,643 Solar Power Plants Nationwide | |
Ranked #329 out of 1,569 California Power Plants | |
Ranked #98 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Resurgence Solar II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Resurgence Solar II.
Monthly Net Generation for Resurgence Solar II
Resurgence Solar II Details
Summary Information | |
---|---|
Plant Name | Resurgence Solar II (66620) |
Plant Address | 41100 US Hwy 395, Boron, CA 93516 |
Utility | Resurgence Solar II (65647) |
Latitude, Longitude | 35.00656, -117.54484 |
Generation Dates on File | Jul 2023 to Aug 2024 |
Initial Operation Date | August 2023 |
Annual Generation | 124.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 115.00 kV |
Energy Storage | Yes |
Generator GEN2 Details Operating August 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 40 MW |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 300 |
---|---|
Maximum Charge Rate | 75 MW |
Maximum Discharge Rate | 75 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 24 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Ramping Spinning Reserve | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65647 |
Direct Support Gen Id | GEN1 |
Support T D Asset | No |
Generator GEN1 Details Operating September 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 48 MW |
Summer Capacity | 48 MW |
Winter Capacity | 48 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 67.9 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Resurgence Solar II Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#444 | Ghost Orchid Solar Energy Center | Clewiston, FL | 137.1 GWh |
#445 | NMRD Data Center III, LLC | Rio Ranchero, NM | 137.0 GWh |
#446 | Dileo Solar | Clifton, TX | 136.8 GWh |
#447 | Magnolia Solar | Mulberry, FL | 136.5 GWh |
#448 | Trailside Solar Center | Elkton, FL | 136.3 GWh |
#449 | Red Horse 2 | Willcox, AZ | 198.7 GWh |
#450 | North Star Solar | Mendota, CA | 135.9 GWh |
#451 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 135.8 GWh |
#452 | Wimauma Solar | Wimauma, FL | 135.6 GWh |
#453 | Beulah Solar | Batesburg, SC | 135.5 GWh |
#455 | Sage Solar I-III | Randolph, UT | 135.3 GWh |
#456 | TS Power Plant | Battle Mountain, NV | 1.3 TWh |
#457 | Nassau Solar Center | Callahan, FL | 135.1 GWh |
#458 | BPL Crown Solar LLC | Chilton, TX | 134.9 GWh |
#459 | Little Manatee River Solar | Ruskin, FL | 134.8 GWh |
#460 | CPV Maple Hill Solar | Portage, PA | 134.8 GWh |
#461 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 134.8 GWh |
#462 | Blue Springs | Marianna, FL | 134.6 GWh |
#463 | Greensville County Solar Project, LLC | Skippers, VA | 134.5 GWh |
#464 | Wautoma Solar | Wautoma, WI | 133.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Resurgence Solar II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo Solar | Oro Grande, CA | 43.7 GWh | 25 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 25.6 mi |
California City | California City, CA | 5.3 GWh | 26.8 mi |
EAFB - North Base | Edwards Air Force Bas, CA | 2.6 GWh | 21.1 mi |
EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh | 21.1 mi |
Edwards Air Force Base | Edwards, CA | 866.0 MWh | 22.3 mi |
Hudson - High Desert Hybrid | Victorville, CA | 288.5 GWh | 27.4 mi |
Lockhart Solar PV II | Hinkley, CA | 185.1 GWh | 11.4 mi |
Lockhart Solar PV, LLC | Hinkley, CA | 219.8 GWh | 10.8 mi |
Madelyn Solar, LLC | Silver Lake, CA | 2.5 GWh | 20.7 mi |
Mitchell Solar, LLC | Silver Lake, CA | 2.6 GWh | 20.9 mi |
Mojave Solar Project | Hinkley, CA | 624.3 GWh | 11.7 mi |
Resurgence Solar | Boron, CA | 234.5 GWh | 0 mi |
Rudy Solar, LLC | Silver Lake, CA | 2.6 GWh | 20.8 mi |
SEGS IX | Hinkley, CA | 114.2 GWh | 11.8 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 242.6 GWh | 28.2 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 28.6 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 29.6 mi |
US Borax | Boron, CA | 280.0 GWh | 9 mi |
Watts 3115 | Adelanto, CA | 3.3 GWh | 28.6 mi |