Reloj del Sol Wind Farm
4390 US HWY 83, San Ygnacio, TX 78067Plant Summary Information
Reloj del Sol Wind Farm is ranked #177 out of 218 wind farms in Texas in terms of total annual net electricity generation.
Reloj del Sol Wind Farm generated 79.9 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Reloj del Sol Wind Farm |
---|---|
Utility Name | Reloj del Sol Wind Farm LLC |
Location | Zapata County, TX |
Initial Operation Date | May 2021 |
Last Update | Sep 2024 |
Annual Generation | 222.5 GWh |
Annual Consumption | 791.3 k MMBtu |
Ranked #2,189 out of 11,852 Power Plants Nationwide | |
Ranked #668 out of 1,345 Wind Power Plants Nationwide | |
Ranked #387 out of 754 Texas Power Plants | |
Ranked #177 out of 218 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Reloj del Sol Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Reloj del Sol Wind Farm.
Monthly Net Generation for Reloj del Sol Wind Farm
Reloj del Sol Wind Farm Details
Summary Information | |
---|---|
Plant Name | Reloj del Sol Wind Farm (62207) |
Plant Address | 4390 US HWY 83, San Ygnacio, TX 78067 |
Utility | Reloj del Sol Wind Farm LLC (61727) |
Latitude, Longitude | 27.03028, -99.38839 |
Generation Dates on File | Jan 2021 to Sep 2024 |
Initial Operation Date | May 2021 |
Annual Generation | 222.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator RELOJ Details Operating May 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 209.4 MW |
Summer Capacity | 209.4 MW |
Winter Capacity | 209.4 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 51 |
Turbine Details | |
Number Of Turbines | 51 |
---|---|
Predominant Turbine Manufacturer | Acciona |
Predominant Turbine Model Number | AW132/3000 |
Design Wind Speed | 16.3 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 393.7 |
Reloj del Sol Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#658 | Gratiot County Wind LLC | Breckenridge, MI | 228.1 GWh |
#659 | Pioneer Wind Park, LLC | Glenrock, WY | 226.3 GWh |
#660 | Cedar Creek Wind, LLC | Shelley, ID | 226.0 GWh |
#661 | Blackstone Wind Farm LLC | Ransom, IL | 225.9 GWh |
#662 | Forest Creek Wind Farm LLC | Big Springs, TX | 225.4 GWh |
#663 | San Roman Wind I, LLC | Los Fresnos, TX | 224.1 GWh |
#664 | Armenia Mountain Wind Farm | Mainesburg, PA | 224.0 GWh |
#665 | Broken Bow Wind LLC | Broken Bow, NE | 224.0 GWh |
#666 | Goodnoe Hills | Goldendale, WA | 223.9 GWh |
#667 | Lake Benton I | Lake Benton, MN | 223.1 GWh |
#669 | Stony Creek Wind Farm NY | Strykersville, NY | 221.7 GWh |
#670 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 221.4 GWh |
#671 | Brookfield Tehachapi 1 | Mojave, CA | 220.4 GWh |
#672 | Prairie Hill Wind Project | Mart, TX | 219.9 GWh |
#673 | Rockland Wind Farm | American Falls, ID | 219.4 GWh |
#674 | Twin Buttes Wind Project | Lamar, CO | 219.0 GWh |
#675 | Independence Wind Farm | Manchester, IA | 218.4 GWh |
#676 | Cassadaga Wind Farm | Cherry Creek, NY | 218.2 GWh |
#677 | Wapsipinicon Wind Project | Dexter, MN | 217.0 GWh |
#678 | Harvest Wind Project | Roosevelt, WA | 216.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Reloj del Sol Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Cedro Hill Wind LLC | Bruni, TX | 451.1 GWh | 48 mi |
Corazon Energy LLC | Rachito Las Lomas, TX | 252.8 GWh | 42.5 mi |
Falcon Dam & Power | Falcon Heights, TX | 30.6 GWh | 35.5 mi |
HEB00095 | Laredo, TX | 432.0 MWh | 40.2 mi |
Hidalgo Wind Farm II | Edinburg, TX | 132.9 GWh | 68.9 mi |
Javelina Wind Energy II, LLC | MIRANDO, TX | 727.9 GWh | 40.8 mi |
Javelina Wind Energy, LLC | Mirando City, TX | 795.5 GWh | 31.2 mi |
Laredo | Laredo, TX | 42.1 GWh | 37.8 mi |
Las Lomas Wind Project | Falcon, TX | 516.0 GWh | 30.7 mi |
Los Vientos V Wind Power | Rio Grande City, TX | 334.6 GWh | 66.1 mi |
Los Vientos Windpower III | Rio Grande City, TX | 451.3 GWh | 57.1 mi |
Los Vientos Windpower IV | Rio Grande City, TX | 475.5 GWh | 57 mi |
Mars Solar | Bruni, TX | 23.0 GWh | 43.4 mi |
Mesteno | Rio Grande City, TX | 411.4 GWh | 52.9 mi |
Rio Bravo Windpower, LLC | Roma, TX | 305.4 GWh | 34 mi |
Sendero | Hebbronville, TX | 272.5 GWh | 30.8 mi |
Torrecillas Wind Energy, LLC | Bruni, TX | 877.9 GWh | 54.4 mi |
WAL3518 | Laredo, TX | 393.0 MWh | 40.6 mi |
WAL5713 | Laredo, TX | 409.0 MWh | 40.4 mi |
Whitetail | Oilton, TX | 166.7 GWh | 39.4 mi |