Regulus Solar Project
Intersection of East Panama La, Bakersfield, CA 93307Plant Summary Information
Regulus Solar Project is ranked #95 out of 799 solar farms in California in terms of total annual net electricity generation.
Regulus Solar Project generated 25.6 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Regulus Solar Project |
---|---|
Utility Name | Regulus Solar, LLC |
Location | Kern County, CA |
Initial Operation Date | November 2014 |
Last Update | Dec 2023 |
Annual Generation | 144.5 GWh |
Annual Consumption | 515.5 k MMBtu |
Ranked #2,711 out of 11,852 Power Plants Nationwide | |
Ranked #407 out of 5,655 Solar Power Plants Nationwide | |
Ranked #311 out of 1,570 California Power Plants | |
Ranked #95 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Regulus Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Regulus Solar Project.
Monthly Net Generation for Regulus Solar Project
Regulus Solar Project Details
Summary Information | |
---|---|
Plant Name | Regulus Solar Project (57650) |
Plant Address | Intersection of East Panama La, Bakersfield, CA 93307 |
Utility | Regulus Solar, LLC (56980) |
Latitude, Longitude | 35.3, -118.85194 |
Generation Dates on File | Nov 2014 to Dec 2023 |
Initial Operation Date | November 2014 |
Annual Generation | 144.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator FRV4 Details Operating November 2014
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 60 MW |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2014 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 81.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Regulus Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#397 | NC 102 Project LLC | Midland, NC | 146.6 GWh |
#398 | Midlands | St. Matthews, SC | 146.5 GWh |
#399 | Hibiscus Solar Energy Center | Westlake, FL | 145.9 GWh |
#400 | Conetoe II Solar, LLC | Conetoe, NC | 145.7 GWh |
#401 | Desert Harvest II LLC | Desert Center, CA | 141.8 GWh |
#402 | Titan Solar 1 (CA) | Borrego Springs, CA | 145.7 GWh |
#403 | Union Springs Solar Center | Lake Butler, FL | 145.7 GWh |
#404 | Bay Tree | Harrells, NC | 145.6 GWh |
#405 | Columbia Solar Power Plant | Fort White, FL | 145.2 GWh |
#406 | Blue Heron Solar | Clewiston, FL | 145.0 GWh |
#408 | Palmer Solar | Fountain, CO | 144.1 GWh |
#409 | Santa Fe Solar Power Plant | Archer, FL | 143.9 GWh |
#410 | Rodeo Solar Center | Arcadia, FL | 143.9 GWh |
#411 | Prairie Creek FL | TBD, FL | 143.8 GWh |
#412 | Indian River Solar Center | Vero Beach, FL | 143.7 GWh |
#413 | Sunflower County | Ruleville, MS | 143.6 GWh |
#414 | Magnolia Springs Solar Center | Green Cove Springs, FL | 143.5 GWh |
#415 | Longbow Solar, LLC | Liverpool, TX | 143.4 GWh |
#416 | High Springs Solar Power Plant | High Springs, FL | 143.3 GWh |
#417 | Centerfield Cooper Solar, LLC | Chesterfield, SC | 142.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Regulus Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bakersfield 111 | Bakersfield, CA | 2.3 GWh | 7.9 mi |
Bakersfield College Solar 01 | Bakersfield, CA | 2.1 GWh | 10.1 mi |
Bakersfield Industrial PV 1 | Bakersfield, CA | 2.0 GWh | 8.2 mi |
Bakersfield PV 1 | Bakersfield, CA | 6.7 GWh | 7.5 mi |
Bear Mountain Limited | Bakersfield, CA | 41.9 GWh | 9.2 mi |
Hayworth Solar | Edison, CA | 58.4 GWh | 2.3 mi |
Improvement Dst No. 4 | Bakersfield, CA | 8.0 MWh | 12.7 mi |
Kern Oil & Refining Co | Bakersfield, CA | 34.5 GWh | 3.8 mi |
Kern River 1 | Bakersfield, CA | 167.0 GWh | 11.8 mi |
Kern River Cogeneration | Bakersfield, CA | 188.9 GWh | 12.9 mi |
Kern River Eastridge Cogen | Bakersfield, CA | 225.3 GWh | 11.5 mi |
Orion Solar I | Arvin, CA | 28.9 GWh | 10.4 mi |
Orion Solar II | Arvin, CA | 18.3 GWh | 10.4 mi |
Redcrest Solar Farm | Edison, CA | 28.0 GWh | 2.7 mi |
Redwood 4 Solar Farm | Edison, CA | 42.0 GWh | 2.5 mi |
Rio Bravo Hydro Project | Bakersfield, CA | 30.7 GWh | 9.1 mi |
Southeast Kern River Cogen | Bakersfield, CA | 86.5 GWh | 10.5 mi |
Sycamore Cogeneration | Bakersfield, CA | 351.7 GWh | 12.9 mi |
Western Power & Steam Inc | Bakersfield, CA | 28.1 GWh | 13.3 mi |
Woodmere Solar Farm | Edison, CA | 31.0 GWh | 2.3 mi |