Regional Wastewater Control Facility
2500 Navy Dr, Stockton, CA 95206Plant Summary Information
Regional Wastewater Control Facility is ranked #28 out of 37 other biomass gas power plants in California in terms of total annual net electricity generation.
Regional Wastewater Control Facility is comprised of 4 generators and generated 1.1 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Regional Wastewater Control Facility |
---|---|
Utility Name | City of Stockton MUD |
Location | San Joaquin County, CA |
Initial Operation Date | November 2000 |
Last Update | Dec 2023 |
Annual Generation | 4.1 GWh |
Annual Consumption | 150.1 k MMBtu |
Ranked #8,075 out of 11,835 Power Plants Nationwide | |
Ranked #55 out of 74 Other Biomass Gas Power Plants Nationwide | |
Ranked #1,131 out of 1,569 California Power Plants | |
Ranked #28 out of 37 California Other Biomass Gas Power Plants | |
Fuel Types | Other Biomass Gas : 97.7% Natural Gas : 2.2% |
Map of Regional Wastewater Control Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Regional Wastewater Control Facility.
Monthly Net Generation for Regional Wastewater Control Facility
Regional Wastewater Control Facility Details
Summary Information | |
---|---|
Plant Name | Regional Wastewater Control Facility (56134) |
Plant Address | 2500 Navy Dr, Stockton, CA 95206 |
Utility | City of Stockton MUD (55934) |
Latitude, Longitude | 37.9369, -121.3294 |
Generation Dates on File | Jan 2003 to Dec 2023 |
Initial Operation Date | November 2000 |
Annual Generation | 4.1 GWh |
Fuel Types | Other Biomass Gas : 97.7% Natural Gas : 2.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Sewage Treatment Facilities (22132) |
Sector | Commercial CHP (5) |
Water Source | Municipality (Well and Surface |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 60.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | PACIFIC GAS |
Pipeline Name | Other - Please explain in pipeline notes below. |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 0101 Details Operating November 2000
Technology | Other Waste Biomass |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2000 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Other Biomass Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Multifuel Details | |
Cofire Energy Source | OBS / NG |
---|
Generator 0301 Details OA November 2000
Technology | Other Waste Biomass |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | OA |
First Operation Date | November 2000 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Other Biomass Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Generator 0401 Details Operating November 2000
Technology | Other Waste Biomass |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2000 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Other Biomass Gas / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Multifuel Details | |
Cofire Energy Source | OBS / NG |
---|
Generator 0501 Details Standby November 2000
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | November 2000 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Commercial CHP (5) |
Topping Or Bottoming | T |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Regional Wastewater Control Facility Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Other Biomass Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#45 | Richland Center Renewable Energy LLC | Richland Center, WI | 5.8 GWh |
#46 | Molson Coors Shenandoah Brewery | Elkton, VA | 5.6 GWh |
#47 | Verwey-Hanford Dairy Digester #2 | Hanford, CA | 5.3 GWh |
#48 | Verwey-Hanford Dairy Digester #3 | Hanford, CA | 5.3 GWh |
#49 | Viresco Turtle Lake | Turtle Lake, WI | 5.3 GWh |
#50 | Toyota Long Beach Trigen | Long Beach, CA | 5.1 GWh |
#51 | Oxnard Wastewater Treatment Plant | Oxnard, CA | 5.7 GWh |
#52 | Davenport Water Pollution Control Plant | Davenport, IA | 6.3 GWh |
#53 | Silicon Valley Clean Water | Redwood City, CA | 4.7 GWh |
#54 | Synergy Biogas | Wyoming, NY | 4.1 GWh |
#56 | Orbit Energy RI | Johnston, RI | 3.7 GWh |
#57 | MM San Diego-Miramar | San Diego, CA | 35.9 GWh |
#58 | Anheuser-Busch St Louis | St. Louis, MO | 40.4 GWh |
#59 | Papillion Creek Wastewater | Bellevue, NE | 6.6 GWh |
#60 | Sunnyvale City of WPCP | Sunnyvale, CA | 9.7 GWh |
#61 | Water Reclamation Plant | Rochester, MN | 2.6 GWh |
#62 | Bayville Central Facility | Bayville, NJ | 2.9 GWh |
#63 | Zero Waste Energy Development Co LLC | San Jose, CA | 2.3 GWh |
#64 | Collinwood BioEnergy Facility | Cleveland, OH | 2.1 GWh |
#65 | Still Water Power | Hanford, CA | 634.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Regional Wastewater Control Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AltaGas Ripon Energy Inc. | Ripon, CA | 1.7 GWh | 18.3 mi |
Amazon - Stockton - Roof (SCK1) - (CA) | Stockton, CA | 3.6 GWh | 7.3 mi |
Ameresco Forward | Manteca, CA | 32.1 GWh | 8.7 mi |
Bear Creek Solar | Lodi, CA | 3.9 GWh | 16.9 mi |
Byron Highway Solar | Byron, CA | 12.8 GWh | 16.9 mi |
Combustion Turbine Project No 2 | Lodi, CA | 6.6 GWh | 10.9 mi |
Donaghy-Stockton | Stockton, CA | 2.3 GWh | 7.6 mi |
J.R. Simplot Company | Lathrop, CA | 8.9 GWh | 9.4 mi |
Kettleman Solar Project | Lodi, CA | 2.7 GWh | 16.4 mi |
Lodi | Lodi, CA | 546.0 MWh | 14.6 mi |
Lodi Energy Center | Lodi, CA | 827.1 GWh | 10.9 mi |
Manteca Land PV | Manteca, CA | 444.0 MWh | 9.1 mi |
Mariposa Energy Project | Byron, CA | 92.8 GWh | 18 mi |
Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh | 17.1 mi |
Niagara Bottling Stockton | Stockton, CA | 1.7 GWh | 5.3 mi |
Prologis L.P | Tracy, CA | 2.7 GWh | 18.3 mi |
Ripon Generation Station | Ripon, CA | 9.7 GWh | 18.4 mi |
Stockton Biomass | Stockton, CA | 326.3 GWh | 0.5 mi |
Tracy Combined Cycle Power Plant | Tracy, CA | 929.6 GWh | 17.9 mi |
University of the Pacific | Stockton, CA | 6.2 GWh | 3.1 mi |