Regeneron Pharmaceuticals Inc. is ranked #44 out of 78 distillate fuel oil power plants in New York in terms of total annual net electricity generation.
Regeneron Pharmaceuticals Inc. is comprised of 12 generators and generated 1.6 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Regeneron Pharmaceuticals Inc. |
---|---|
Utility Name | Regeneron Pharmaceuticals Inc. |
Location | Westchester County, NY |
Initial Operation Date | August 2009 |
Last Update | Dec 2023 |
Annual Generation | 45.0 MWh |
Annual Consumption | 1.6 k MMBtu |
Ranked #11,567 out of 11,835 Power Plants Nationwide | |
Ranked #922 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #806 out of 832 New York Power Plants | |
Ranked #44 out of 78 New York Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Regeneron Pharmaceuticals Inc.
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Regeneron Pharmaceuticals Inc..
Monthly Net Generation for Regeneron Pharmaceuticals Inc.
Regeneron Pharmaceuticals Inc. Details
Summary Information | |
---|---|
Plant Name | Regeneron Pharmaceuticals Inc. (62423) |
Plant Address | 777 Old Saw Mill River Rd, Tarrytown, NY 10591 |
Utility | Regeneron Pharmaceuticals Inc. (61948) |
Latitude, Longitude | 41.07875, -73.82227 |
Generation Dates on File | Jan 2018 to Dec 2023 |
Initial Operation Date | August 2009 |
Annual Generation | 45.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Hospitals (622) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consolidated Edison Co-NY Inc (4226) NY |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | CONSOLIDATED EDISON NEW YORK INC |
Natural Gas Storage | No |
Generator 735G1 Details Standby August 2009
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | August 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 735G2 Details Standby August 2009
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | August 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 771NG Details Standby January 2010
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 777G1 Details Standby February 2013
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | February 2013 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 785G1 Details Standby April 2015
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 0.2 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | April 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 795G1 Details Standby April 2015
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | April 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 795G2 Details Standby April 2015
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | April 2015 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 745G1 Details Standby April 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | April 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 745G2 Details Standby April 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | April 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 765G1 Details Standby April 2016
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | April 2016 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 765G2 Details Standby January 2020
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | January 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 777G2 Details Standby March 2020
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.5 MW |
Winter Capacity | 2.5 MW |
Minimum Load | 0.3 MW |
Uprate/Derate Completed | No |
Status | Standby |
Synchronized To Transmission Grid | No |
First Operation Date | March 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Switch Between Oil And Natural Gas | No |
Regeneron Pharmaceuticals Inc. Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#912 | Southwestern Bell Telephone | St. Louis, MO | 47.0 MWh |
#913 | Carmi | Carmi, IL | 47.0 MWh |
#914 | Oberlin (OH) | Oberlin, OH | 292.0 MWh |
#915 | Lake Park | Lake Park, IA | 46.0 MWh |
#916 | Worthington | Worthington, MN | 9.8 GWh |
#917 | Pender | Pender, NE | 46.0 MWh |
#918 | Kindred School | Kindred, ND | 46.0 MWh |
#919 | St. Olaf StandBy Generators | Northfield, MN | 46.0 MWh |
#920 | Wayne IC | Wayne, NE | 45.0 MWh |
#921 | North Generation Plant | Greenfield, IA | 45.0 MWh |
#923 | East Campus Steam Plant | University Park, PA | 46.3 GWh |
#924 | J Street | Lincoln, NE | 4.5 GWh |
#925 | Emory Decatur Hospital | Decatur, GA | 44.1 MWh |
#926 | Tulsa | Tulsa, OK | 214.3 GWh |
#927 | Schuylkill Generating Station | Phila., PA | 44.0 MWh |
#928 | Good Samaritan Hospital | Suffern, NY | 46.0 MWh |
#929 | Auburn | Auburn, NE | 155.0 MWh |
#930 | Conemaugh | New Florence, PA | 2.9 TWh |
#931 | Tipton | Tipton, IA | 42.0 MWh |
#932 | Valdosta Water Treatment Plant | Valdosta, GA | 42.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Regeneron Pharmaceuticals Inc..
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
100 Brook Hill Drive Solar | West Nyack, NY | 2.1 GWh | 8.4 mi |
Bowline Point | West Haverstraw, NY | 1.1 TWh | 11.6 mi |
Clarkstown Landfill Solar Facility | West Nyack, NY | 2.7 GWh | 6.9 mi |
Cos Cob | Greenwich, CT | 1.3 GWh | 12.1 mi |
EDF - Liberty NY - Real Term CSG | Elmsford, NY | 526.0 MWh | 0.8 mi |
Equinix - Elmsford | Elmsford, NY | 11.7 GWh | 0.5 mi |
Grand Prix Solar | Mt. Kisco, NY | 608.0 MWh | 10.5 mi |
Haworth Water Treatment Plant | Haworth, NJ | 17.4 GWh | 13 mi |
JLL-One Rockwood Road | Sleppy Hollow, NY | 8.0 MWh | 3 mi |
Lederle Laboratories | Pearl River, NY | 148.3 GWh | 10.2 mi |
Montefiore Mount Vernon Hospital | Mount Vernon, NY | 55.0 MWh | 12.4 mi |
Mount Kisco Landfill Solar & Storage CSG | Mount Kisco, NY | 768.0 MWh | 9.2 mi |
Mt Pleasant Community Center | Valhalla, NY | 710.0 MWh | 3 mi |
Mt.Sinai-St.Lukes Roosevelt Hosp. Center | New York, NY | 61.0 MWh | 11.1 mi |
Regeneron Tarrytown | Tarrytown, NY | 11.0 GWh | 0.1 mi |
St Johns Riverside Hospital | Yonkers, NY | 6.0 MWh | 8.3 mi |
St. Joseph Hospital | Yonkers, NY | 14.0 MWh | 11.1 mi |
The Source at White Plains (UBS) | White Plains, NY | 1.6 GWh | 4.8 mi |
Westchester County Medical Center | Valhalla, NY | 102.0 MWh | 1.2 mi |
White Plains_RFP-Gedney Way Landfill | White Plains, NY | 2.8 GWh | 5.9 mi |