Redbridge

5 Red Bridge Rd, Wilbraham, MA 1095

Plant Summary Information

Redbridge is ranked #15 out of 29 hydroelectric power plants in Massachusetts in terms of total annual net electricity generation.

Redbridge is comprised of 2 generators and generated 2.7 GWh during the 3-month period between May 2023 to August 2023.

Plant NameRedbridge
Utility NameCentral Rivers Power MA, LLC
LocationHampden County, MA
Initial Operation DateJanuary 1926
Last Update Aug 2023
Annual Generation 17.7 GWh
Annual Consumption 61.7 k MMBtu
Ranked #5,204 out of 11,835 Power Plants Nationwide
Ranked #798 out of 1,371 Water Power Plants Nationwide
Ranked #54 out of 598 Massachusetts Power Plants
Ranked #15 out of 29 Massachusetts Water Power Plants
Fuel Types Water
Previous Operators NAEA Energy Massachusetts LLC (2013 to 2015)
NAEA Energy Massachusetts LLC (2016 to 2016)
Nautilus Hydro, LLC (2017 to 2017)
Central Rivers Power MA, LLC (2018 to 2023)

Map of Redbridge

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Redbridge.

Create Your Account Today

Monthly Net Generation for Redbridge

Redbridge Details

Summary Information
Plant NameRedbridge (1638)
Plant Address5 Red Bridge Rd, Wilbraham, MA 1095
UtilityCentral Rivers Power MA, LLC (61350)
Latitude, Longitude42.17605, -72.40952
Generation Dates on FileJan 2001 to Aug 2023
Initial Operation DateJanuary 1926
Annual Generation 17.7 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number16-1155
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceChicopee River
Ash Impoundment No
Transmission / Distribution OwnerWestern Massachusetts Electric Company (20455) MA
Grid Voltage 13.80 kV
Energy StorageNo

Generator RB4 Details Out of Service January 1926

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
RTO ISO LMP Node Designation874
Nameplate Capacity1.8 MW
Nameplate Power Factor0.8
Summer Capacity1.8 MW
Winter Capacity1.8 MW
Minimum Load0.5 MW
Uprate/Derate Completed No
StatusOut of Service
First Operation DateJanuary 1926
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H

Generator RB3 Details Out of Service January 1934

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
RTO ISO LMP Node Designation874
Nameplate Capacity1.8 MW
Nameplate Power Factor0.8
Summer Capacity1.8 MW
Winter Capacity1.8 MW
Minimum Load0.5 MW
Uprate/Derate Completed No
StatusOut of Service
First Operation DateJanuary 1934
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H

Redbridge Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#788Spaulding 3Emigrant Gap, CA18.3 GWh
#789Fish CreekIdleyld Park, OR18.3 GWh
#790Mosinee MillMosinee, WI118.3 GWh
#791Twin BranchMishawaka, IN18.2 GWh
#792Swinging Bridge 2Forestburgh, NY18.2 GWh
#793Hydro IILogan, UT17.9 GWh
#794SouthManton, CA17.9 GWh
#795San FernandoSylmar, CA17.8 GWh
#796MurphysMurphys, CA17.8 GWh
#797Gardners FallsBuckland, MA17.7 GWh
#799Townsend HydroNew Brighton, PA17.6 GWh
#800Box Canyon DamMount Shasta, CA17.3 GWh
#801Benton Falls AssociatesBenton, ME17.3 GWh
#802NewcastleAuburn, CA17.3 GWh
#803New LahontanFallon, NV17.2 GWh
#804Penacook Upper Falls HydroPenacook, NH17.1 GWh
#805Burton DamClayton, GA17.0 GWh
#806Russell D SmithOthello, WA17.0 GWh
#807Black River Hydro AssociatesPort Layden, NY16.9 GWh
#808TuxedoFlat Rock, NC16.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Redbridge.

Plant NamePlant LocationAnnual GenerationDistance
Breckenridge SolarPalmer, MA6.9 GWh4.8 mi
Browne Solar LLCPalmer, MA1.3 GWh4.8 mi
ChicopeeChicopee, MA2.5 GWh5.2 mi
Collins FacilityWilbraham, MA6.8 GWh1.5 mi
Huxley SolarLudlow, MA4.2 GWh3.9 mi
Indian Hill Solar LLCPalmer, MA1.3 GWh4.8 mi
Indian OrchardIndian Orchard, MA10.6 GWh5.1 mi
Indian Orchard PV FacilitySpringfield, MA3.4 GWh4.9 mi
Kearsarge Ludlow LLCLudlow, MA5.8 GWh4.7 mi
Ludlow LandfillLudlow, MA3.3 GWh5 mi
Ludlow Site 72 - ContiLudlow, MA2.3 GWh2 mi
Monson SolarMonson, MA4.1 GWh5.3 mi
Oak Street SolarSpringfield, MA5.4 GWh4.9 mi
PalmerPalmer, MA5.9 GWh4.7 mi
Palmer LandfillPalmer, MA4.3 GWh5.6 mi
Palmer Solar LLCPalmer, MA3.2 GWh2.4 mi
Putts BridgeLudlow, MA22.2 GWh4.1 mi
State Street Solar LLCPalmer, MA1.2 GWh4.8 mi
Stony BrookLudlow, MA26.3 GWh5.4 mi
WilbrahamWilbraham, MA5.7 GWh5.2 mi