Red Wing
801 5th st. East, Red Wing, MN 55901Plant Summary Information
Red Wing is ranked #36 out of 59 non-biogenic municipal solid waste power plants nationwide in terms of total annual net electricity generation.
Red Wing is comprised of 2 generators and generated 35.7 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Red Wing |
---|---|
Utility Name | Northern States Power Co - Minnesota |
Location | Goodhue County, MN |
Initial Operation Date | October 1949 |
Last Update | Sep 2024 |
Annual Generation | 122.0 GWh |
Annual Consumption | 2.8 M MMBtu |
Ranked #2,941 out of 11,852 Power Plants Nationwide | |
Ranked #36 out of 59 NON-Biogenic Municipal Solid Waste Power Plants Nationwide | |
Ranked #52 out of 736 Minnesota Power Plants | |
Ranked #2 out of 4 Minnesota NON-Biogenic Municipal Solid Waste Power Plants | |
Fuel Types | Non-biogenic Municipal Solid Waste : 53.8% Biogenic Municipal Solid Waste : 44.0% Wood/Wood Waste Solids : 1.6% Natural Gas : 0.7% |
Map of Red Wing
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Wing.
Monthly Net Generation for Red Wing
Red Wing Details
Summary Information | |
---|---|
Plant Name | Red Wing (1926) |
Plant Address | 801 5th st. East, Red Wing, MN 55901 |
Utility | Northern States Power Co - Minnesota (13781) |
Latitude, Longitude | 44.5692, -92.51691 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | October 1949 |
Annual Generation | 122.0 GWh |
Fuel Types | Non-biogenic Municipal Solid Waste : 53.8% Biogenic Municipal Solid Waste : 44.0% Wood/Wood Waste Solids : 1.6% Natural Gas : 0.7% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Mississippi |
Ash Impoundment | No |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | NORTHERN STATES PWR CO |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 1 Details Operating October 1949
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP REDWING REDWIN_1_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP REDWING REDWIN_1_UNIT |
Nameplate Capacity | 11.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9 MW |
Winter Capacity | 9 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 1949 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Municipal Solid Waste / Wood/Wood Waste Solids / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | No |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | MSW / NG / WDS |
---|
Generator 2 Details Operating November 1949
Technology | Municipal Solid Waste |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSP REDWING REDWIN_2_UNIT |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSP REDWING REDWIN_2_UNIT |
Nameplate Capacity | 11.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 9 MW |
Winter Capacity | 9 MW |
Minimum Load | 6 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 1949 |
Planned Retirement | December 2027 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Municipal Solid Waste / Wood/Wood Waste Solids / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Stoker Technology | No |
Subcritical Technology | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | No |
Multifuel Details | |
Cofire Energy Source | MSW / NG / WDS |
---|
Red Wing Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Non-biogenic Municipal Solid Waste.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#26 | Covanta Hennepin Energy | Minneapolis, MN | 207.2 GWh |
#27 | Huntington Resource Recovery Facility | East Northport, NY | 195.7 GWh |
#28 | Lancaster County Resource Recovery | Brainbridge, PA | 183.0 GWh |
#29 | Pasco Cnty Solid Waste Resource Recovery | Spring Hill, FL | 182.5 GWh |
#30 | Hillsborough County Resource Recovery | Tampa, FL | 178.0 GWh |
#31 | Camden Resource Recovery Facility | Camden, NJ | 173.0 GWh |
#32 | Covanta Niagara I, LLC | Niagara Falls, NY | 183.6 GWh |
#33 | Covanta Alexandria/Arlington Energy | Alexandria, VA | 141.2 GWh |
#34 | Spokane Waste to Energy | Spokane, WA | 131.5 GWh |
#35 | Covanta Babylon Inc | West Babylon, NY | 122.0 GWh |
#37 | Covanta Southeastern Connecticut Company | Preston, CT | 116.0 GWh |
#38 | Covanta Bristol Energy | Bristol, CT | 109.6 GWh |
#39 | Wilmarth | Mankato, MN | 105.6 GWh |
#40 | Wheelabrator Lisbon | Lisbon, CT | 99.7 GWh |
#41 | Kent County Waste to Energy Facility | Grand Rapids, MI | 96.0 GWh |
#42 | Wheelabrator Concord Facility | Concord, NH | 91.9 GWh |
#43 | Harrisburg Facility | Harrisburg, PA | 92.6 GWh |
#44 | Southeast Resource Recovery | Long Beach, CA | 89.9 GWh |
#45 | Covanta Lake County Energy | Okahumpka, FL | 82.7 GWh |
#46 | Wheelabrator Gloucester LP | Westville, NJ | 81.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Wing.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Betcher Community Solar Garden | Goodhue, MN | 1.9 GWh | 12.8 mi |
Betcher CSG 1, LLC | Goodhue, MN | 1.8 GWh | 12.8 mi |
Cannon Falls Energy Center | Cannon Falls, MN | 741.7 GWh | 19.8 mi |
FastSun 11 CSG | Zumbrota, MN | 1.4 GWh | 21.5 mi |
FastSun 9 CSG | Zumbrota, MN | 1.6 GWh | 20.9 mi |
Foreman's Hill Community Solar | Red Wing, MN | 8.3 GWh | 6 mi |
Frontenac Holdco LLC, CSG | Frontenac, MN | 8.8 GWh | 9.1 mi |
Goodhue Community Solar One LLC CSG | Zumbrota, MN | 1.8 GWh | 19.7 mi |
Goodhue Community Solar Two LLC | Zumbrota, MN | 1.8 GWh | 21.6 mi |
GRE Marshan Solar | Hastings, MN | 1.5 GWh | 17 mi |
Hastings Solar | Hastings, MN | 8.5 GWh | 20 mi |
Huneke I CSG | Zumbrota, MN | 1.8 GWh | 13.2 mi |
Lady Slipper Solar Array CSG | Red Wing, MN | 7.5 GWh | 7.2 mi |
Prairie Island | Welch, MN | 5.6 TWh | 6.8 mi |
Red Wing Community Solar | Red Wing, MN | 7.3 GWh | 2.4 mi |
Siems Solar Project CSG | Mazeppa, MN | 2.1 GWh | 20.6 mi |
Sturgeon Garden | Goodhue, MN | 175.0 MWh | 13 mi |
T Luhman CSG | Zumbrota, MN | 2.1 GWh | 21.5 mi |
USS Wildcat Solar LLC | Goodhue, MN | 2.3 GWh | 12.9 mi |
Zumbro Community Solar Garden | Zumbrota, MN | 1.7 GWh | 18.8 mi |