Red Mesa Solar Project
tbd, Red Mesa, UT 84534Plant Summary Information
Red Mesa Solar Project is ranked #25 out of 121 power plants in Utah in terms of total annual net electricity generation.
Red Mesa Solar Project generated 54.8 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Red Mesa Solar Project |
---|---|
Utility Name | NTUA Generation - Utah, LLC |
Location | San Juan County, UT |
Initial Operation Date | April 2023 |
Last Update | Aug 2024 |
Annual Generation | 193.9 GWh |
Annual Consumption | 730.8 k MMBtu |
Ranked #2,340 out of 11,835 Power Plants Nationwide | |
Ranked #273 out of 5,643 Solar Power Plants Nationwide | |
Ranked #25 out of 121 Utah Power Plants | |
Ranked #12 out of 51 Utah Solar Power Plants | |
Fuel Types | Solar |
Map of Red Mesa Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Red Mesa Solar Project.
Monthly Net Generation for Red Mesa Solar Project
Red Mesa Solar Project Details
Summary Information | |
---|---|
Plant Name | Red Mesa Solar Project (66404) |
Plant Address | tbd, Red Mesa, UT 84534 |
Utility | NTUA Generation - Utah, LLC (65488) |
Latitude, Longitude | 37.12081, -109.41151 |
Generation Dates on File | Apr 2023 to Aug 2024 |
Initial Operation Date | April 2023 |
Annual Generation | 193.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Navajo Tribal Utility Authority (13314) UT |
Grid Voltage | 24.90 kV / 69.00 kV |
Energy Storage | No |
Generator PV Details Operating April 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 72 MW |
Summer Capacity | 72 MW |
Winter Capacity | 72 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2023 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
DC Net Capacity | 93.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Red Mesa Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#263 | Point Beach Solar | Two Creeks, WI | 198.6 GWh |
#264 | Pioneer Solar (CO), LLC | Bennett, CO | 198.0 GWh |
#265 | SR Arlington II | Blakely, GA | 197.2 GWh |
#266 | OCI Alamo 5 LLC | Uvalde, TX | 197.1 GWh |
#267 | Techren Solar I LLC | Boulder, NV | 196.8 GWh |
#268 | Coniglio Solar | Wolfe City, TX | 196.7 GWh |
#269 | OETN1 | Obion, TN | 194.4 GWh |
#270 | Badger Hollow I | Montfort, WI | 194.0 GWh |
#271 | Aulander Holloman Solar, LLC | Aulander, NC | 194.0 GWh |
#272 | Robins Air Force Base Solar | Macon, GA | 193.9 GWh |
#274 | Solverde 1 | Lancaster, CA | 192.8 GWh |
#275 | Lamesa Solar | Lamesa, TX | 192.0 GWh |
#276 | Hardy Hills Solar Energy LLC | Frankfort, IN | 191.6 GWh |
#277 | Two Creeks Solar | Two Rivers, WI | 191.2 GWh |
#278 | Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh |
#279 | Sun Streams 3 | Arlington, AZ | 251.1 GWh |
#280 | Graphite Solar I | Wellington, UT | 189.3 GWh |
#281 | Bell Ridge Solar | Trenton, FL | 189.3 GWh |
#282 | White Pine Solar, LLC | Butler, GA | 188.2 GWh |
#283 | Playa Solar 1, LLC | North Las Vegas, NV | 187.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Red Mesa Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ames Hydro | Ophir, CO | 7.1 GWh | 98.3 mi |
Bluffview | Farmington, NM | 276.8 GWh | 71.7 mi |
City of Gallup Solar | Gallup, NM | 13.7 GWh | 115.9 mi |
Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 51.5 mi |
Cortez Solar 2, LLC | Cortez, CO | 5.3 GWh | 47.3 mi |
Cortez Solar 3, LLC | Cortez, CO | 3.9 GWh | 47.5 mi |
Drop 5 | Montrose, CO | 8.9 GWh | 124.6 mi |
Four Corners | Fruitland, NM | 8.0 TWh | 59.4 mi |
Kayenta Solar Project | Kayenta, AZ | 87.6 GWh | 52.9 mi |
Latigo Wind Park | Monticello, UT | 147.6 GWh | 53 mi |
McPhee | Cortez, CO | 5.4 GWh | 55.7 mi |
Navajo Dam | Farmington, NM | 91.4 GWh | 101.6 mi |
Shavano Falls Hydro | Montrose, CO | 10.8 GWh | 122 mi |
Shavano Falls Hydro Drop 4 | Montrose, CO | 20.4 GWh | 128.1 mi |
SMPA Solar 1 Community Solar | Bedrock, CO | 1.8 GWh | 86.6 mi |
Tacoma | Durango, CO | 957.0 MWh | 93.7 mi |
Towaoc | Cortez, CO | 16.8 GWh | 50.7 mi |
Tri-County Water Hydropower Project | Ridgway, CO | 15.8 GWh | 118.9 mi |
Vallecito Hydroelectric | Bayfield, CO | 25.7 GWh | 102.4 mi |
Williams Ignacio Natural Gas Plant | Durango, CO | 47.9 GWh | 89.6 mi |