2459 Road V, Reading, KS 66868Plant Summary Information
Reading Wind Project is ranked #30 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Reading Wind Project generated 122.2 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Reading Wind Project |
---|---|
Utility Name | Southern Power Co |
Location | Lyon County, KS |
Initial Operation Date | May 2020 |
Last Update | Sep 2024 |
Annual Generation | 680.1 GWh |
Annual Consumption | 2.5 M MMBtu |
Ranked #999 out of 11,852 Power Plants Nationwide | |
Ranked #208 out of 1,345 Wind Power Plants Nationwide | |
Ranked #30 out of 152 Kansas Power Plants | |
Ranked #23 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Reading Wind Energy, LLC (2016 to 2017) Southern Power Co (2018 to 2023) |
Map of Reading Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Reading Wind Project.
Monthly Net Generation for Reading Wind Project
Reading Wind Project Details
Summary Information | |
---|---|
Plant Name | Reading Wind Project (60999) |
Plant Address | 2459 Road V, Reading, KS 66868 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 38.475, -95.9655 |
Generation Dates on File | May 2020 to Sep 2024 |
Initial Operation Date | May 2020 |
Annual Generation | 680.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Westar Energy Inc (22500) |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator READW Details Operating May 2020
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 200.1 MW |
Summer Capacity | 200.1 MW |
Winter Capacity | 200.1 MW |
Minimum Load | 3.4 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2020 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 64 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 64 |
---|---|
Predominant Turbine Manufacturer | Siemens Gamesa |
Predominant Turbine Model Number | G132-3.465 |
Design Wind Speed | 17.9 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 333 |
Reading Wind Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Reading Wind Energy, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#198 | Caney River Wind Project | Howard, KS | 696.1 GWh |
#199 | Pattern Gulf Wind | Armstrong, TX | 694.1 GWh |
#200 | Broadview Energy JN, LLC | Texico, NM | 693.6 GWh |
#201 | Klondike Windpower III | Wasco, OR | 692.4 GWh |
#202 | Salt Fork Wind Project, LLC | Clarendon, TX | 688.3 GWh |
#203 | Hidalgo Wind Farm LLC | McCook, TX | 687.8 GWh |
#204 | Jayhawk Wind Energy Center | Hepler, KS | 685.5 GWh |
#205 | Bright Stalk Wind Farm I | Chenoa, IL | 684.5 GWh |
#206 | Rattlesnake Den | Garden City, TX | 681.4 GWh |
#207 | Cedar Creek Wind | Grover, CO | 681.0 GWh |
#209 | Tucannon River Wind Farm | Dayton, WA | 678.5 GWh |
#210 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 674.5 GWh |
#211 | Big Sky Wind LLC | Ohio, IL | 674.7 GWh |
#212 | Cross Winds Energy Park | Unionville, MI | 669.5 GWh |
#213 | Wildcat Ranch Wind Project | Morton, TX | 669.1 GWh |
#214 | Osborn Wind Energy | Stewartsville, MO | 666.4 GWh |
#215 | Bloom Wind | Minneola, KS | 664.7 GWh |
#216 | Cedar Point Wind | Limon, CO | 663.8 GWh |
#217 | Peetz Table Wind Energy | Peetz, CO | 653.2 GWh |
#218 | Meadow Lake Wind Farm VI LLC | Remington, IN | 652.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Reading Wind Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Americus | Emporia, KS | 2.4 GWh | 11.3 mi |
Baldwin City Plant No 1 | Baldwin City, KS | 19.0 MWh | 46.9 mi |
Baldwin City Plant No 2 | Baldwin City, KS | 145.0 MWh | 46.3 mi |
Burlingame | Burlingame, KS | 46.1 MWh | 20.6 mi |
Burlington (KS) | Burlington, KS | 117.0 MWh | 22.7 mi |
East Kansas Agri-Energy, LLC | Garnett, KS | 5.0 GWh | 41.7 mi |
Emporia Energy Center | Emporia, KS | 1.5 TWh | 5.8 mi |
FreeState Crooked Post Solar I | Topeka, KS | 3.4 GWh | 36.7 mi |
FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh | 44.8 mi |
FreeState Stull Solar I | LeCompton, KS | 215.0 MWh | 45.9 mi |
Garnett Municipal | Garnett, KS | 9.0 MWh | 41.5 mi |
Iola | Iola, KS | 909.0 MWh | 48.1 mi |
Kansas River Project | Lawrence, KS | 19.2 GWh | 52.3 mi |
Ottawa | Ottawa, KS | 377.0 MWh | 38.3 mi |
Sharpe | Waverly, KS | 1.1 GWh | 20.6 mi |
Thunderbird Generator (Tbird) | Emporia, KS | 106.0 MWh | 15.6 mi |
Waste Management Rolling Meadows LFGTE | Topeka, KS | 45.4 GWh | 50 mi |
Waverly Wind Farm LLC | Waverly, KS | 712.0 GWh | 17.2 mi |
Wolf Creek Generating Station | Burlington, KS | 9.1 TWh | 22.1 mi |
Wolf Creek Generator | Burlington, KS | 106.0 MWh | 20.6 mi |