RE Roserock
293 Mendal Road, Fort Stockton, TX 79735Plant Summary Information
RE Roserock is ranked #43 out of 170 solar farms in Texas in terms of total annual net electricity generation.
RE Roserock generated 99.5 GWh during the 3-month period between July 2024 to October 2024.
Plant Name | RE Roserock |
---|---|
Utility Name | Southern Power Co |
Location | Pecos County, TX |
Initial Operation Date | November 2016 |
Last Update | Oct 2024 |
Annual Generation | 365.4 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,620 out of 11,866 Power Plants Nationwide | |
Ranked #122 out of 5,672 Solar Power Plants Nationwide | |
Ranked #309 out of 758 Texas Power Plants | |
Ranked #43 out of 170 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
RE Roserock (2014 to 2014) Southern Power Co (2015 to 2023) |
Map of RE Roserock
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Roserock.
Monthly Net Generation for RE Roserock
RE Roserock Details
Summary Information | |
---|---|
Plant Name | RE Roserock (59994) |
Plant Address | 293 Mendal Road, Fort Stockton, TX 79735 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 30.96021, -103.30666 |
Generation Dates on File | Nov 2016 to Oct 2024 |
Initial Operation Date | November 2016 |
Annual Generation | 365.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG15-43-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator ROSEK Details Operating November 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 160 MW |
Summer Capacity | 157.5 MW |
Winter Capacity | 157.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 212.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
RE Roserock Plant Owners
Owner Name | Address | Ownership |
---|---|---|
RE Roserock | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#112 | Imperial Solar Energy Center West | Seeley, CA | 388.3 GWh |
#113 | Pike Solar Hybrid | Fountain, CO | 386.1 GWh |
#114 | Big Cypress Solar, LLC | Crawfordsville, AR | 382.9 GWh |
#115 | Brazoria County Solar Project (Danciger) | Damon, TX | 381.0 GWh |
#116 | Sparta Solar | Pawnee, TX | 378.8 GWh |
#117 | Solar Gen 2 Solar Facility | Calipatria, CA | 376.5 GWh |
#118 | Buckthorn Westex | Ft. Stockton, TX | 375.5 GWh |
#119 | Indiana Crossroads Solar Park | Reynolds, IN | 375.4 GWh |
#120 | Prairie Wolf Solar LLC | Ashmore Township, IL | 375.0 GWh |
#121 | Maverick Solar, LLC | Desert Center, CA | 374.1 GWh |
#123 | Calhoun Solar | Battle Creek, MI | 364.3 GWh |
#124 | Tres Bahias | Port Lavaca, TX | 360.6 GWh |
#125 | Blythe Solar III, LLC Hybrid | Blythe, CA | 346.2 GWh |
#126 | Impact Solar 1 | Deport, TX | 354.1 GWh |
#127 | Edwards Sanborn E1B | Mojave, CA | 335.7 GWh |
#128 | Lund Hill Solar | Bickleton, WA | 353.3 GWh |
#129 | Camilla Solar Energy Project | Camilla, GA | 352.7 GWh |
#130 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 326.2 GWh |
#131 | Copper Mountain Solar 2 | Boulder City, NV | 348.7 GWh |
#132 | Arlington Valley Solar Energy II | Arlington, AZ | 348.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Roserock.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 236.3 GWh | 61.4 mi |
Barilla Solar | Fort Stockton, TX | 79.1 GWh | 2.6 mi |
Buckthorn Westex | Ft. Stockton, TX | 375.5 GWh | 52.1 mi |
CED Crane Solar | Crane, TX | 404.1 GWh | 62.3 mi |
East Pecos Solar | McCamey, TX | 253.8 GWh | 60.8 mi |
Emerald Grove | Crane, TX | 280.4 GWh | 56.8 mi |
Greasewood II LLC | Girvin, TX | 73.9 GWh | 42.6 mi |
Greasewood Solar | Fort Stockton, TX | 160.2 GWh | 48.7 mi |
Oberon IB | Odessa, TX | 54.2 GWh | 62.1 mi |
Pearl Solar | Fort Stockton, TX | 99.7 GWh | 61.5 mi |
Permian Basin | Monahans, TX | 344.7 GWh | 47.6 mi |
RE Maplewood | McCamey, TX | 496.1 GWh | 62.2 mi |
Sherbino II | Ft. Stockton, TX | 533.6 GWh | 49.2 mi |
SolaireHolman Solar Project | Alpine, TX | 116.1 GWh | 36.3 mi |
Taygete Energy Project LLC | Coyanosa, TX | 458.7 GWh | 17.8 mi |
Taygete II Energy Project | Coyanosa, TX | 495.7 GWh | 18.8 mi |
WAL897 | Fort Stockton, TX | 174.0 MWh | 24.1 mi |
West of the Pecos Solar | TBD, TX | 233.7 GWh | 41 mi |
Woodward Mountain I | Girvin, TX | 175.7 GWh | 52.9 mi |
Woodward Mountain II | Girvin, TX | 168.8 GWh | 52.9 mi |