RE Garland A
21505 Gaskell Road, Rosamond, CA 93560Plant Summary Information
RE Garland A is ranked #161 out of 747 solar farms in California in terms of total annual net electricity generation.
RE Garland A generated 12.9 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | RE Garland A |
---|---|
Utility Name | Southern Power Co |
Location | Kern County, CA |
Initial Operation Date | September 2016 |
Last Update | Dec 2022 |
Annual Generation | 50.5 GWh |
Annual Consumption | 184.7 k MMBtu |
Ranked #3,798 out of 11,249 Power Plants Nationwide | |
Ranked #681 out of 5,158 Solar Power Plants Nationwide | |
Ranked #470 out of 1,501 California Power Plants | |
Ranked #161 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of RE Garland A
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Garland A.
Monthly Net Generation for RE Garland A
RE Garland A Details
Summary Information | |
---|---|
Plant Name | RE Garland A (60386) |
Plant Address | 21505 Gaskell Road Rosamond, CA 93560 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 34.82145, -118.49741 |
Generation Dates on File | Sep 2016 to Dec 2022 |
Initial Operation Date | September 2016 |
Annual Generation | 50.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG15-113-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator PV1 Details Operating September 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 20.2 MW |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 26.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
RE Garland A Plant Owners
Owner Name | Address | Ownership |
---|---|---|
RE Garland A LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#671 | Western Antelope Blue Sky Ranch A | Lancaster, CA | 51.6 GWh |
#672 | Bayshore Solar C, LLC | Lancaster, CA | 51.6 GWh |
#673 | Pumpjack Solar I | McKittrick, CA | 51.6 GWh |
#674 | NextEra Westside PV | Five Points, CA | 51.6 GWh |
#675 | Shafter Solar LLC | Bakersfield, CA | 51.3 GWh |
#676 | Long Island Solar Farm LLC | Upton, NY | 51.3 GWh |
#677 | RE Kent South, LLC | Lemoore, CA | 51.3 GWh |
#678 | Midway Solar Farm III | Calipatria, CA | 51.1 GWh |
#679 | Westmoreland County Solar Project | WARSAW, VA | 51.0 GWh |
#680 | Redwood 4 Solar Farm | Edison, CA | 50.8 GWh |
#682 | White River Solar | Alpaugh, CA | 50.4 GWh |
#683 | Wonderful Lost Hills | Lost Hills, CA | 50.4 GWh |
#684 | Searchlight Solar | Searchlight, NV | 50.4 GWh |
#685 | Algonquin SKIC20 Solar LLC | Taft, CA | 50.3 GWh |
#686 | Chino Solar Valley | Chino Valley, AZ | 50.2 GWh |
#687 | SR Arlington I | Arlington, GA | 50.0 GWh |
#688 | Simcoe Solar | Mountain Home, ID | 49.5 GWh |
#689 | Coronal Lost Hills | Lost Hills, CA | 49.5 GWh |
#690 | TA-High Desert LLC | Lancaster, CA | 49.4 GWh |
#691 | High Point Solar LLC | Lena, IL | 49.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Garland A.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alpine Solar | Lancaster, CA | 170.7 GWh | 2.3 mi |
AV Solar Ranch One | Lancaster, CA | 618.2 GWh | 5 mi |
Catalina Solar 2, LLC | Rosamond, CA | 48.7 GWh | 8.2 mi |
Gaskell West 1 Solar Facility | Lancaster, CA | 46.5 GWh | 3.8 mi |
Golden Field Solar III, LLC | Rosamond, CA | 556.5 GWh | 6.1 mi |
Golden Fields Solar I, LLC | Rosamond, CA | 153.6 GWh | 6.4 mi |
Kingbird A Solar LLC | Rosamond, CA | 58.8 GWh | 3.7 mi |
Kingbird B Solar, LLC | Rosamond, CA | 62.1 GWh | 3.3 mi |
Manzana Wind LLC | Rosamond, CA | 550.8 GWh | 8.1 mi |
North Rosamond Solar LLC | Rosamond, CA | 378.7 GWh | 7.2 mi |
Pacific Wind LLC | Rosamond, CA | 699.6 GWh | 6.1 mi |
RE Astoria | Rosamond, CA | 285.2 GWh | 2.7 mi |
RE Astoria 2 | Rosamond, CA | 206.9 GWh | 1.4 mi |
RE Garland | Rosamond, CA | 451.8 GWh | 1.6 mi |
RE Gaskell West 2 LLC | Rosamond, CA | 108.2 GWh | 3.2 mi |
Solar Star 1 | Rosamond, CA | 917.4 GWh | 5.3 mi |
Solar Star 2 | Rosamond, CA | 712.5 GWh | 8.4 mi |
Solar Star California, XLI, LLC | Rosamond, CA | 158.7 GWh | 6.4 mi |
Valentine Solar, LLC | Rosamond, CA | 275.3 GWh | 8.6 mi |
Willow Spring Solar, LLC | Rosamond, CA | 263.7 GWh | 9.2 mi |