RE Astoria
18936 Gaskell Road, Rosamond, CA 93560Plant Summary Information
RE Astoria is ranked #82 out of 806 solar farms in California in terms of total annual net electricity generation.
RE Astoria generated 34.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | RE Astoria |
---|---|
Utility Name | RE Astoria LLC |
Location | Kern County, CA |
Initial Operation Date | December 2016 |
Last Update | Dec 2024 |
Annual Generation | 223.1 GWh |
Annual Consumption | 800.3 k MMBtu |
Ranked #2,212 out of 11,949 Power Plants Nationwide | |
Ranked #258 out of 5,739 Solar Power Plants Nationwide | |
Ranked #246 out of 1,577 California Power Plants | |
Ranked #82 out of 806 California Solar Power Plants | |
Fuel Types | Solar |
Map of RE Astoria
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RE Astoria.
Monthly Net Generation for RE Astoria
RE Astoria Details
Summary Information | |
---|---|
Plant Name | RE Astoria (59976) |
Plant Address | 18936 Gaskell Road, Rosamond, CA 93560 |
Utility | RE Astoria LLC (59727) |
Latitude, Longitude | 34.84423, -118.45847 |
Generation Dates on File | Jun 2016 to Dec 2024 |
Initial Operation Date | December 2016 |
Annual Generation | 223.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 220.00 kV |
Energy Storage | No |
Generator ASTR1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 100 MW |
Summer Capacity | 100 MW |
Winter Capacity | 100 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 130.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
RE Astoria Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#248 | Prairie State Solar Project | Swanwick Township, IL | 234.1 GWh |
#249 | Briar Creek Solar 1 | Corsicana, TX | 233.6 GWh |
#250 | Galloway 2 Solar Farm | Paint Rock, TX | 230.4 GWh |
#251 | Enterprise Solar, LLC | Newcastle, UT | 230.1 GWh |
#252 | CA Flats Solar 130, LLC | Shandon, CA | 228.5 GWh |
#253 | Dressor Plains Solar, LLC | Herrick, IL | 226.7 GWh |
#254 | SR Lumpkin | Lumpkin, GA | 225.9 GWh |
#255 | Lockhart Solar PV, LLC | Hinkley, CA | 224.5 GWh |
#256 | Assembly Solar II LLC | Lennon, MI | 224.2 GWh |
#257 | Wapello Solar LLC | Wapello, IA | 223.2 GWh |
#259 | Chesapeake Solar Project | Chesapeake, VA | 222.0 GWh |
#260 | Red Tailed Hawk Solar LLC | Pierce, TX | 221.5 GWh |
#261 | Black Bear Solar 1 | Montgomery, AL | 216.0 GWh |
#262 | Albemarle Beach Solar | Roper, NC | 215.8 GWh |
#263 | North Fork Solar Project | Snyder, OK | 215.2 GWh |
#264 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#265 | Butler Solar Project 103 | Butler, GA | 213.9 GWh |
#266 | Cutlass Solar 1 LLC | Richmond, TX | 213.8 GWh |
#267 | Chicot Solar | Lake Village, AR | 213.6 GWh |
#268 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RE Astoria.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alpine Solar | Lancaster, CA | 161.0 GWh | 4.6 mi |
AV Solar Ranch One | Lancaster, CA | 565.9 GWh | 4.8 mi |
Gaskell West 1 Solar Facility | Lancaster, CA | 26.2 GWh | 6 mi |
Golden Field Solar III, LLC | Rosamond, CA | 538.5 GWh | 3.6 mi |
Golden Fields Solar I, LLC | Rosamond, CA | 140.4 GWh | 4.1 mi |
Kingbird A Solar LLC | Rosamond, CA | 56.2 GWh | 2.3 mi |
Kingbird B Solar, LLC | Rosamond, CA | 55.6 GWh | 1.8 mi |
Manzana Wind LLC | Rosamond, CA | 468.5 GWh | 6.3 mi |
North Rosamond Solar LLC | Rosamond, CA | 392.7 GWh | 4.6 mi |
Pacific Wind LLC | Rosamond, CA | 264.0 GWh | 3.6 mi |
RE Astoria 2 | Rosamond, CA | 156.0 GWh | 1.3 mi |
RE Garland | Rosamond, CA | 383.7 GWh | 4 mi |
RE Garland A | Rosamond, CA | 47.9 GWh | 2.7 mi |
RE Gaskell West 2 LLC | Rosamond, CA | 95.3 GWh | 5.3 mi |
RE Gaskell West 3 LLC | Rosamond, CA | 46.3 GWh | 5.3 mi |
RE Gaskell West 5 LLC | Rosamond, CA | 44.2 GWh | 5.3 mi |
Solar Star 1 | Rosamond, CA | 874.7 GWh | 3.6 mi |
Solar Star 2 | Rosamond, CA | 715.3 GWh | 6 mi |
Solar Star California, XLI, LLC | Rosamond, CA | 148.3 GWh | 4.1 mi |
Valentine Solar, LLC | Rosamond, CA | 289.1 GWh | 5.9 mi |