RCWD PV Project is ranked #300 out of 747 solar farms in California in terms of total annual net electricity generation.
RCWD PV Project generated 2.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | RCWD PV Project |
---|---|
Utility Name | MN8 Energy LLC |
Location | Riverside County, CA |
Initial Operation Date | June 2016 |
Last Update | Dec 2022 |
Annual Generation | 9.9 GWh |
Annual Consumption | 35.7 k MMBtu |
Ranked #5,901 out of 11,249 Power Plants Nationwide | |
Ranked #1,516 out of 5,158 Solar Power Plants Nationwide | |
Ranked #834 out of 1,501 California Power Plants | |
Ranked #300 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Solar Star California XL, LLC (2015 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2022) |
Map of RCWD PV Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RCWD PV Project.
Monthly Net Generation for RCWD PV Project
RCWD PV Project Details
Summary Information | |
---|---|
Plant Name | RCWD PV Project (60426) |
Plant Address | 2679 Washington Ave Murrieta, CA 92562 |
Utility | MN8 Energy LLC (61944) |
Latitude, Longitude | 33.5226, -117.1815 |
Generation Dates on File | Jun 2016 to Dec 2022 |
Initial Operation Date | June 2016 |
Annual Generation | 9.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | QF16-1010 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator RCWD Details Operating June 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 4.1 MW |
Summer Capacity | 3.9 MW |
Winter Capacity | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 5 MW |
Virtual Net Metering Agreement | No |
RCWD PV Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Wells Fargo Equipment Finance Inc | 733 Marquette Ave, Minneapolis, MN 55402 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1506 | Trinity Solar | Trinity, NC | 10.0 GWh |
#1507 | ABD Farms | Asheboro, NC | 9.9 GWh |
#1508 | Spring Hope Solar 2, LLC | Spring Hope, NC | 9.9 GWh |
#1509 | RE Rio Grande Solar LLC | Mojave, CA | 9.9 GWh |
#1510 | G&S Wantage Solar LLC | Wantage, NJ | 9.9 GWh |
#1511 | Arborgate Solar | Pittsboro, NC | 9.9 GWh |
#1512 | Red Oak Solar Farm, LLC | Nashville, NC | 9.9 GWh |
#1513 | 1025 Traveller Solar, LLC | Sanford, NC | 9.9 GWh |
#1514 | Branch Solar Farm | Branch, AR | 9.9 GWh |
#1515 | Sonne Two | Newton, NC | 9.9 GWh |
#1517 | Wadesboro Farm 2 | Wadesboro, NC | 9.9 GWh |
#1518 | Biscoe Solar LLC | Biscoe, NC | 9.9 GWh |
#1519 | Lanier Solar | Beulaville, NC | 9.9 GWh |
#1520 | Fisher Solar Farm - NC | Oakboro, NC | 9.9 GWh |
#1521 | ZV Solar 2, LLC | Red Springs, NC | 9.9 GWh |
#1522 | Stainback Solar Farm | Middleburg, NC | 9.9 GWh |
#1523 | North Nash Farm, LLC | Castalia, NC | 9.9 GWh |
#1524 | Millikan Farm | Randleman, NC | 9.9 GWh |
#1525 | SoINCPower5, LLC | Battleboro, NC | 9.9 GWh |
#1526 | Aulander Hwy 42 Solar, LLC | Aulander, NC | 9.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RCWD PV Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AP North Lake I, LP | Hemet, CA | 32.4 GWh | 18 mi |
Diamond Valley Lake | Winchester, CA | 3.2 GWh | 12.7 mi |
Diamond Valley Solar Project | Winchester, CA | 2.6 GWh | 14.6 mi |
EMWD - Perris Valley RWRF | Perris, CA | 8.9 GWh | 16.4 mi |
EMWD - San Jacinto RES BCT | San Jacinto, CA | 6.7 GWh | 21.4 mi |
EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 3.2 GWh | 21.3 mi |
EMWD - Sun City RWRF | Menifee, CA | 4.0 GWh | 12.2 mi |
Genentech-Oceanside Hybrid | Oceanside, CA | 7.4 GWh | 22.6 mi |
Gilead Oceanside Solar Project | Oceanside, CA | 2.0 GWh | 22.5 mi |
Lake Elsinore Canopies - Lakeside HS | Lake Elsinore, CA | 1.9 GWh | 15.3 mi |
NLP Granger | Valley Center, CA | 7.9 GWh | 18.8 mi |
Orange Grove Peaking Facility | Pala, CA | 21.3 GWh | 12 mi |
Red Mountain | Fallbrook, CA | 19.2 GWh | 8.9 mi |
SDCWA - Twin Oaks | San Marcos, CA | 1.8 GWh | 21.6 mi |
Tahquitz High School | Hemet, CA | 1.7 GWh | 19.4 mi |
Vallecitos Water District | San Marcos, CA | 4.0 GWh | 21.4 mi |
Valley Center | Valley Center, CA | 6.2 GWh | 20.9 mi |
Valley Center 1 | Valley Center, CA | 5.9 GWh | 22.5 mi |
Valley Center 2 | Valley Center, CA | 13.1 GWh | 22.5 mi |
West Valley High School Solar | Hemet, CA | 1.5 GWh | 16.8 mi |