RC Thomas Hydroelectric Project
5170 South FM1988, Livingston, TX 77351Plant Summary Information
RC Thomas Hydroelectric Project is ranked #2 out of 20 hydroelectric power plants in Texas in terms of total annual net electricity generation.
RC Thomas Hydroelectric Project is comprised of 3 generators and generated 32.1 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | RC Thomas Hydroelectric Project |
---|---|
Utility Name | East Texas Electric Coop, Inc |
Location | Polk County, TX |
Initial Operation Date | July 2020 |
Last Update | Sep 2024 |
Annual Generation | 114.9 GWh |
Annual Consumption | 408.5 k MMBtu |
Ranked #3,026 out of 11,852 Power Plants Nationwide | |
Ranked #327 out of 1,371 Water Power Plants Nationwide | |
Ranked #442 out of 754 Texas Power Plants | |
Ranked #2 out of 20 Texas Water Power Plants | |
Fuel Types | Water |
Map of RC Thomas Hydroelectric Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for RC Thomas Hydroelectric Project.
Monthly Net Generation for RC Thomas Hydroelectric Project
RC Thomas Hydroelectric Project Details
Summary Information | |
---|---|
Plant Name | RC Thomas Hydroelectric Project (58645) |
Plant Address | 5170 South FM1988, Livingston, TX 77351 |
Utility | East Texas Electric Coop, Inc (39347) |
Latitude, Longitude | 30.63222, -95.01 |
Generation Dates on File | Jul 2020 to Sep 2024 |
Initial Operation Date | July 2020 |
Annual Generation | 114.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Livingston |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Texas Inc. (55937) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator RCT1 Details Operating July 2020
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EES.RCTHOMAS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EES.RCTHOMAS |
Nameplate Capacity | 8.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 8.7 MW |
Winter Capacity | 8.7 MW |
Minimum Load | 3.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator RCT2 Details Operating July 2020
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EES.RCTHOMAS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EES.RCTHOMAS |
Nameplate Capacity | 8.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 8.7 MW |
Winter Capacity | 8.7 MW |
Minimum Load | 3.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator RCT3 Details Operating July 2020
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | EES.RCTHOMAS |
RTO ISO Location Designation For Reporting Wholesale Sales Data | EES.RCTHOMAS |
Nameplate Capacity | 8.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 8.7 MW |
Winter Capacity | 8.7 MW |
Minimum Load | 3.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
RC Thomas Hydroelectric Project Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#317 | Tyee Lake Hydroelectric Facility | Wrangell, AK | 119.1 GWh |
#318 | Yates Dam | Tallassee, AL | 118.8 GWh |
#319 | Main Canal Headworks | Coulee City, WA | 118.7 GWh |
#320 | Rainbow Falls Hydro | Parishville, NY | 118.6 GWh |
#321 | Lemolo 2 | Toketee Falls, OR | 118.5 GWh |
#322 | Nine Mile | Nine Mile, WA | 118.3 GWh |
#323 | Beaver Dam | Eureka Springs, AR | 117.7 GWh |
#324 | Lookout Point | Lowell, OR | 116.8 GWh |
#325 | Blewett | Lilesville, NC | 116.1 GWh |
#326 | Cushman 1 | Shelton, WA | 115.5 GWh |
#328 | Five Falls | Colton, NY | 114.6 GWh |
#329 | High Rock Hydro | Denton, NC | 114.3 GWh |
#330 | Amoskeag | Manchester, NH | 113.9 GWh |
#331 | Watauga | Elizabethton, TN | 113.0 GWh |
#332 | Swan Falls | Kuna, ID | 113.0 GWh |
#333 | Denison | Denison, TX | 112.9 GWh |
#334 | Upper Gorge | Bishop, CA | 112.2 GWh |
#335 | Dutch Flat | Alta, CA | 112.1 GWh |
#336 | Allatoona | Cartersville, GA | 111.5 GWh |
#337 | Stevenson | Monroe, CT | 111.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding RC Thomas Hydroelectric Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Chamon Power LLC | Houston, TX | 116.3 GWh | 52.1 mi |
Hardin County Peaking Facility | Kountze, TX | 128.1 GWh | 50.5 mi |
HEB00594 | The Woodlands, TX | 290.0 MWh | 44.4 mi |
HEB00767 | Magnolia, TX | 178.0 MWh | 49.1 mi |
Lewis Creek | Willis, TX | 2.2 TWh | 33.3 mi |
Liberty County Solar Project | Dayton, TX | 563.3 MWh | 47.5 mi |
Montgomery County | Willis, TX | 6.1 TWh | 33.5 mi |
Robert D Willis | Jasper, TX | 4.4 GWh | 50.9 mi |
San Jacinto County Peaking Facility | Shepherd, TX | 115.1 GWh | 14.7 mi |
Security | Cleveland, TX | 15.2 GWh | 26.3 mi |
SJRR Power LLC | Houston, TX | 152.2 GWh | 52.2 mi |
Umbriel Solar | Livington, TX | 320.8 GWh | 13.7 mi |
WAL1103 | Houston, TX | 338.0 MWh | 52.2 mi |
WAL3390 | The Woodlands, TX | 361.0 MWh | 46.1 mi |
WAL4298 | Humble, TX | 177.0 MWh | 50.2 mi |
WAL522 | Crosby, TX | 316.0 MWh | 51.1 mi |
WAL5287 | Spring, TX | 322.0 MWh | 48.7 mi |
WAL602 | Spring, TX | 265.0 MWh | 44.1 mi |
WAL744 | Humble, TX | 404.0 MWh | 45.1 mi |
WAL849 | Spring, TX | 293.0 MWh | 46.5 mi |