Rawhide Prairie Solar Hybrid
3100 E County Road 82, Wellington, CO 80549Plant Summary Information
Rawhide Prairie Solar Hybrid is ranked #16 out of 142 solar farms in Colorado in terms of total annual net electricity generation.
Rawhide Prairie Solar Hybrid generated 8.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Rawhide Prairie Solar Hybrid |
---|---|
Utility Name | Greenbacker Renewable Energy Corporation |
Location | Larimer County, CO |
Initial Operation Date | March 2021 |
Last Update | Dec 2023 |
Annual Generation | 47.3 GWh |
Annual Consumption | 170.4 k MMBtu |
Ranked #3,925 out of 11,835 Power Plants Nationwide | |
Ranked #793 out of 5,643 Solar Power Plants Nationwide | |
Ranked #78 out of 267 Colorado Power Plants | |
Ranked #16 out of 142 Colorado Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
CO Buffalo Flats LLC (2019 to 2019) Greenbacker Renewable Energy Corporation (2020 to 2023) |
Map of Rawhide Prairie Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rawhide Prairie Solar Hybrid.
Monthly Net Generation for Rawhide Prairie Solar Hybrid
Rawhide Prairie Solar Hybrid Details
Summary Information | |
---|---|
Plant Name | Rawhide Prairie Solar Hybrid (63722) |
Plant Address | 3100 E County Road 82, Wellington, CO 80549 |
Utility | Greenbacker Renewable Energy Corporation (60025) |
Latitude, Longitude | 40.85798, -105.01556 |
Generation Dates on File | Mar 2021 to Dec 2023 |
Initial Operation Date | March 2021 |
Annual Generation | 47.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of Colorado (PSCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Platte River Power Authority (15143) |
Grid Voltage | 34.50 kV |
Energy Storage | Yes |
Generator BA1 Details Operating March 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 1 MW |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 12H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 2 |
---|---|
Maximum Charge Rate | 1 MW |
Maximum Discharge Rate | 1 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1 |
Storage Enclosure Type | CS |
System Peak Shaving | P |
Load Management | Yes |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 63722 |
Direct Support Gen Id | PV1 |
Support T D Asset | No |
Generator PV1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 22 MW |
Summer Capacity | 22 MW |
Winter Capacity | 22 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 60 |
DC Net Capacity | 29.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 29.1 MW |
Virtual Net Metering Agreement | No |
Rawhide Prairie Solar Hybrid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#783 | Three Corners Solar | Unity, ME | 48.3 GWh |
#784 | Shafter Solar LLC | Bakersfield, CA | 48.2 GWh |
#785 | Gaston Solar Power Plant | Cherryville Township, NC | 48.1 GWh |
#786 | Red Horse III | Wilcox, AZ | 48.1 GWh |
#787 | Rio Bravo Solar II LLC | McKittrick, CA | 48.0 GWh |
#788 | RE Garland A | Rosamond, CA | 47.9 GWh |
#789 | Long Island Solar Farm LLC | Upton, NY | 47.8 GWh |
#790 | Vega Solar | Los Banos, CA | 47.7 GWh |
#791 | CED Ducor 1 | Ducor, CA | 47.7 GWh |
#792 | NextEra Westside PV | Five Points, CA | 47.7 GWh |
#794 | Simcoe Solar | Mountain Home, ID | 47.4 GWh |
#795 | Bayshore Solar A, LLC | Lancaster, CA | 47.4 GWh |
#796 | SR Odom | Moultrie, GA | 47.4 GWh |
#797 | Westmoreland County Solar Project | WARSAW, VA | 47.2 GWh |
#798 | CED Ducor 2 | Ducor, CA | 47.2 GWh |
#799 | Antelope Expansion 1B | Lancaster, CA | 46.9 GWh |
#800 | CED Ducor 4 | Ducor, CA | 46.9 GWh |
#801 | Shoreham Solar Commons | Shoreham, NY | 46.9 GWh |
#802 | Corcoran Solar 2 | Corcoran, CA | 46.8 GWh |
#803 | Pearl River Solar Park LLC | Morton, MS | 46.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rawhide Prairie Solar Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alden Solar CSG LLC | Greeley, CO | 3.3 GWh | 35.9 mi |
Big Thompson | Loveland, CO | 5.3 GWh | 32.1 mi |
Bison Solar LLC | Wellington, CO | 62.1 GWh | 0.5 mi |
Cheyenne Prairie Generating Station | Cheyenne, WY | 431.8 GWh | 24 mi |
Corriedale Wind Energy | Cheyenne, WY | 198.3 GWh | 17.7 mi |
Coyote Ridge Community Solar | Fort Collins, CO | 3.1 GWh | 25.4 mi |
Flatiron | Loveland, CO | 135.9 GWh | 36 mi |
Happy Jack Windpower Project | Cheyenne, WY | 55.3 GWh | 19.5 mi |
Oak Leaf Solar XXVII LLC | Greely, CO | 3.4 GWh | 35 mi |
Rawhide | Wellington, CO | 1.3 TWh | 0.4 mi |
Roundhouse Renewable Energy II | Granite, WY | 260.8 GWh | 13.6 mi |
Roundhouse Wind Energy Project | Cheyenne, WY | 827.6 GWh | 17.1 mi |
RV CSU Power II LLC | Fort Collins, CO | 2.7 GWh | 19.6 mi |
RV CSU Power LLC | Fort Collins, CO | 2.5 GWh | 19.7 mi |
Silver Sage Windpower | Cheyenne, WY | 107.0 GWh | 18.8 mi |
Skylark | Severance, CO | 8.8 GWh | 20.4 mi |
South Cheyenne Solar | South Greeley, WY | 147.7 GWh | 17.1 mi |
SR Skylark B | Severance, CO | 3.9 GWh | 20.2 mi |
SR Skylark C | Windsor, CO | 2.5 GWh | 20.5 mi |
Valley View Solar | Greeley, CO | 9.7 GWh | 31 mi |