Rapide Croche

W214 Cty ZZ, Kaukana, WI 54130

Plant Summary Information

Rapide Croche is ranked #35 out of 66 hydroelectric power plants in Wisconsin in terms of total annual net electricity generation.

Rapide Croche is comprised of 4 generators and generated 4.1 GWh during the 3-month period between September 2023 to December 2023.

Plant NameRapide Croche
Utility NameCity of Kaukauna
LocationOutagamie County, WI
Initial Operation DateJanuary 1926
Last Update Dec 2023
Annual Generation 15.0 GWh
Annual Consumption 56.5 k MMBtu
Ranked #5,403 out of 11,852 Power Plants Nationwide
Ranked #849 out of 1,371 Water Power Plants Nationwide
Ranked #108 out of 216 Wisconsin Power Plants
Ranked #35 out of 66 Wisconsin Water Power Plants
Fuel Types Water

Map of Rapide Croche

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rapide Croche.

Create Your Account Today

Monthly Net Generation for Rapide Croche

Rapide Croche Details

Summary Information
Plant NameRapide Croche (4122)
Plant AddressW214 Cty ZZ, Kaukana, WI 54130
UtilityCity of Kaukauna (10056)
Latitude, Longitude44.3164, -88.3147
Generation Dates on FileJan 2001 to Dec 2023
Initial Operation DateJanuary 1926
Annual Generation 15.0 GWh
Fuel Types Water
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water SourceFox River
Ash Impoundment No
Transmission / Distribution OwnerCity of Kaukauna (10056) WI
Grid Voltage 12.40 kV
Energy StorageNo

Generator 1 Details Operating January 1926

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Nameplate Power Factor0.9
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1926
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 2 Details Operating January 1926

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Nameplate Power Factor0.9
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1926
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 3 Details Operating January 1926

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Nameplate Power Factor0.9
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1926
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Generator 4 Details Operating January 1926

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.6 MW
Nameplate Power Factor0.9
Summer Capacity0.6 MW
Winter Capacity0.6 MW
Minimum Load0.2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1926
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load1H
Multiple FuelsNo

Rapide Croche Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Water.

RankPlant NamePlant LocationAnnual Generation
#839Copper Dam PlantHood River, OR15.6 GWh
#840Siphon Power ProjectBend, OR15.6 GWh
#841WaterportWaterport, NY15.6 GWh
#842Tri-County Water Hydropower ProjectRidgway, CO15.5 GWh
#843Pembroke HydroSuncook, NH15.4 GWh
#844Buchanan (MI)Buchanan, MI15.3 GWh
#845BowmanNevada City, CA15.3 GWh
#846Owyhee Dam Power ProjectNyssa, OR15.2 GWh
#847White River Lock and Dam 2Locust Grove, AR15.2 GWh
#848White River Lock and Dam 1Batesville, AR15.2 GWh
#850Nooksack HydroGlacier, WA15.0 GWh
#851Unionville Hydro Project 2499 NYNorwood, NY14.9 GWh
#852Youngs Creek Hydroelectric ProjectMonroe, WA14.9 GWh
#853Eagle PointEagle Point, OR14.7 GWh
#854Manitou SpringsManitou Spring, CO14.6 GWh
#855SewallsWatertown, NY14.6 GWh
#856Hampshire PaperGouverneur, NY14.6 GWh
#857Cove HydroelectricBurney, CA14.4 GWh
#858RaymondvilleNorfolk, NY14.3 GWh
#859PiercefieldPiercefield, NY14.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Rapide Croche.

Plant NamePlant LocationAnnual GenerationDistance
Alliant Energy NeenahNeenah, WI610.1 GWh12.7 mi
AppletonAppleton, WI5.5 GWh6.4 mi
Blue Sky Green Field Wind ProjectFond du Lac, WI315.9 GWh30.3 mi
Combined LocksCombined Locks, WI39.0 GWh3 mi
Combined Locks Energy CenterCombined Locks, WI376.3 GWh3.2 mi
Consumer Operations LLCGreen Bay, WI261.6 GWh18.6 mi
Custer Energy CenterManitowoc, WI2.4 GWh33.2 mi
De Pere Energy CenterDe Pere, WI144.4 GWh15.1 mi
Fox Energy CenterWrightstown, WI4.5 TWh5.2 mi
Island Street Peaking PlantKaukauna, WI8.0 GWh3.7 mi
Kaukauna City HydroKaukauna, WI28.3 GWh2.9 mi
Kaukauna Gas TurbineKaukauna, WI741.0 MWh3.7 mi
Kaukauna Paper MillKaukauna, WI120.2 GWh3.8 mi
Kimberly MillAppleton, WI12.3 GWh2.9 mi
Little ChuteCombined Locks, WI20.4 GWh3.9 mi
New BadgerKaukauna, WI47.2 GWh3.6 mi
PulliamGreen Bay, WI62.1 GWh21.6 mi
RidgeviewWhitelaw, WI37.1 GWh26 mi
Shirley WindDenmark, WI53.5 GWh19.2 mi
Winnebago County Landfill GasOshkosh, WI11.4 GWh19.6 mi