Rancho Seco Solar II, LLC
1444 Twin Cities Road, Twin Cities, CA 95638Plant Summary Information
Rancho Seco Solar II, LLC is ranked #66 out of 799 solar farms in California in terms of total annual net electricity generation.
Rancho Seco Solar II, LLC generated 100.8 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Rancho Seco Solar II, LLC |
---|---|
Utility Name | Rancho Seco Solar II, LLC |
Location | Sacramento County, CA |
Initial Operation Date | February 2021 |
Last Update | Sep 2024 |
Annual Generation | 266.9 GWh |
Annual Consumption | 959.1 k MMBtu |
Ranked #1,972 out of 11,852 Power Plants Nationwide | |
Ranked #195 out of 5,655 Solar Power Plants Nationwide | |
Ranked #200 out of 1,570 California Power Plants | |
Ranked #66 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of Rancho Seco Solar II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rancho Seco Solar II, LLC.
Monthly Net Generation for Rancho Seco Solar II, LLC
Rancho Seco Solar II, LLC Details
Summary Information | |
---|---|
Plant Name | Rancho Seco Solar II, LLC (63387) |
Plant Address | 1444 Twin Cities Road, Twin Cities, CA 95638 |
Utility | Rancho Seco Solar II, LLC (63141) |
Latitude, Longitude | 38.34681, -121.11984 |
Generation Dates on File | Jan 2021 to Sep 2024 |
Initial Operation Date | February 2021 |
Annual Generation | 266.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator RSS2 Details Operating February 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 160 MW |
Summer Capacity | 160 MW |
Winter Capacity | 160 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 210 |
Tilt Angle | 20 |
DC Net Capacity | 212.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Rancho Seco Solar II, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#185 | Emerald Grove | Crane, TX | 278.1 GWh |
#186 | East Blackland Solar Project 1 | Manor, TX | 277.6 GWh |
#187 | Imperial Solar Energy Center South | Calexico, CA | 277.2 GWh |
#188 | Wood County | Nekoosa, WI | 271.6 GWh |
#189 | Boulder Solar Power, LLC | Boulder City, NV | 271.6 GWh |
#190 | Oberon IA | Odessa, TX | 271.4 GWh |
#191 | Hunter Solar LLC (UT) | Clawson, UT | 270.1 GWh |
#192 | Maverick Solar 6, LLC | Desert Center, CA | 265.8 GWh |
#193 | Ivanpah 3 | Nipton, CA | 278.0 GWh |
#194 | West Line Solar, LLC | City of Eloy, AZ | 268.1 GWh |
#196 | San Pablo Raceway | Lancaster, CA | 264.8 GWh |
#197 | Bluebell Solar II | Sterling, TX | 264.1 GWh |
#198 | Dougherty County Solar, LLC | Albany, GA | 263.8 GWh |
#199 | Catalina Solar LLC | Rosamond, CA | 262.7 GWh |
#200 | Jackpot Solar, LLC | Twin Falls, ID | 262.1 GWh |
#201 | Sunshine Valley Solar | Armagosa, NV | 260.9 GWh |
#202 | Saint Solar | Coolidge, AZ | 260.6 GWh |
#203 | Hecate Energy Highland LLC | Buford, OH | 260.6 GWh |
#204 | Ivanpah 2 | Nipton, CA | 270.0 GWh |
#205 | Rabbitbrush Solar, LLC | Rosamond, CA | 256.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rancho Seco Solar II, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bear Creek Solar | Lodi, CA | 3.9 GWh | 14.6 mi |
Camanche | Clements & Wallace, CA | 58.1 GWh | 9.8 mi |
Cosumnes | Herald, CA | 3.8 TWh | 0.6 mi |
Kiefer Landfill | Sloughhouse, CA | 66.6 GWh | 12.2 mi |
Rancho Seco Solar, LLC | Herald, CA | 13.3 GWh | 0.6 mi |
RE Dillard 1 LLC | Sloughhouse, CA | 6.2 GWh | 9.1 mi |
RE Dillard 2 LLC | Sloughhouse, CA | 6.2 GWh | 8.8 mi |
RE Dillard 3 LLC | Sloughhouse, CA | 6.2 GWh | 8.6 mi |
RE Kammerer 1 LLC | Elk Grove, CA | 11.3 GWh | 14.2 mi |
RE Kammerer 2 LLC | Elk Grove, CA | 11.3 GWh | 14.2 mi |
RE Kammerer 3 LLC | Elk Grove, CA | 11.3 GWh | 14.2 mi |
RE McKenzie 1 LLC | Galt, CA | 11.6 GWh | 10 mi |
RE McKenzie 2 LLC | Galt, CA | 11.5 GWh | 10 mi |
RE McKenzie 3 LLC | Galt, CA | 11.6 GWh | 10 mi |
RE McKenzie 4 LLC | Galt, CA | 11.5 GWh | 10 mi |
RE McKenzie 5 LLC | Galt, CA | 11.4 GWh | 10 mi |
RE McKenzie 6 LLC | Galt, CA | 11.4 GWh | 10 mi |
Renew Solar ABC Sacramento LLC | Sacramento, CA | 2.9 GWh | 10.1 mi |
SMUD at Fleshman | Galt, CA | 4.1 GWh | 14 mi |
SMUD at Van Conett | Galt, CA | 1.3 GWh | 10.8 mi |