Rancho Cordova Medical Offices
10725 International Dr, Rancho Cordova, CA 95670Plant Summary Information
Rancho Cordova Medical Offices is ranked #581 out of 747 solar farms in California in terms of total annual net electricity generation.
Rancho Cordova Medical Offices generated 609.9 MWh during the 3-month period between September 2022 to December 2022.
Plant Name | Rancho Cordova Medical Offices |
---|---|
Utility Name | KP Rancho Cordova Medical Offices Solar, LLC |
Location | Sacramento County, CA |
Initial Operation Date | April 2021 |
Last Update | Dec 2022 |
Annual Generation | 2.4 GWh |
Annual Consumption | 8.5 k MMBtu |
Ranked #9,192 out of 11,249 Power Plants Nationwide | |
Ranked #4,021 out of 5,158 Solar Power Plants Nationwide | |
Ranked #1,281 out of 1,501 California Power Plants | |
Ranked #581 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Map of Rancho Cordova Medical Offices
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rancho Cordova Medical Offices.
Monthly Net Generation for Rancho Cordova Medical Offices
Rancho Cordova Medical Offices Details
Summary Information | |
---|---|
Plant Name | Rancho Cordova Medical Offices (65384) |
Plant Address | 10725 International Dr Rancho Cordova, CA 95670 |
Utility | KP Rancho Cordova Medical Offices Solar, LLC (64747) |
Latitude, Longitude | 38.57657, -121.29104 |
Generation Dates on File | Apr 2021 to Dec 2022 |
Initial Operation Date | April 2021 |
Annual Generation | 2.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Balancing Authority of Northern California (BANC) |
NAICS Code | Ambulatory Health Care Services (621) |
Sector | Commercial Non-CHP (4) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sacramento Municipal Util Dist (16534) CA |
Grid Voltage | 0.48 kV |
Energy Storage | No |
Generator 7101 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 1.1 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1 MW |
Winter Capacity | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.3 MW |
Virtual Net Metering Agreement | No |
Rancho Cordova Medical Offices Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Citicorp North America Inc. | 388 Greenwich St, New York, NY 10012 | 99.99% |
Forsyth Street Renewables I, LLC | 588 Broadway, Suite 1208, New York, NY 10012 | 0.01% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4011 | SR Kersey II | Kersey, CO | 2.4 GWh |
#4012 | Grossmont HS Solar Project | El Cajon, CA | 2.4 GWh |
#4013 | Bethlehem - East | Selkirk, NY | 2.4 GWh |
#4014 | Bethlehem - West | Selkirk, NY | 2.4 GWh |
#4015 | Arba Solar, LLC | Snow Hill, NC | 2.4 GWh |
#4016 | Francisco St. Solar | Torrance, CA | 2.4 GWh |
#4017 | WED Kingstown Solar I, LLC - West | Richmond, RI | 2.4 GWh |
#4018 | Kearsarge Wilmington | Wilmington, MA | 2.4 GWh |
#4019 | AC Power | Delanco Township, NJ | 2.4 GWh |
#4020 | 435A Bergen Avenue | Kearney, NJ | 2.4 GWh |
#4022 | EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh |
#4023 | Sullivan Solar | New Bedford, MA | 2.4 GWh |
#4024 | Airport 009239 SCS Lexington, LLC | Lexington, NE | 2.4 GWh |
#4025 | Broadalbin-Perth Solar | Amsterdam, NY | 2.4 GWh |
#4026 | FELPS 6- Floresville West | Floresville, TX | 2.4 GWh |
#4027 | 12 Applegate Solar LLC | Robbinsville, NJ | 2.4 GWh |
#4028 | Rio Rancho High School | Rio Rancho, NM | 2.3 GWh |
#4029 | Madelyn Solar, LLC | Silver Lake, CA | 2.3 GWh |
#4030 | Main Street Solar Project | Rutland, VT | 2.3 GWh |
#4031 | Onondaga County - Oak Orchard WWTP | Clay, NY | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rancho Cordova Medical Offices.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aerojet I | Rancho Cordova, CA | 6.2 GWh | 7.4 mi |
Aerojet II | Rancho Cordova, CA | 4.0 GWh | 6.9 mi |
Department of Justice | Sacramento, CA | 4.4 GWh | 8.7 mi |
Depot Park Solar System | Sacramento, CA | 2.3 GWh | 7.2 mi |
Dept of General Services -FTB | Sacramento, CA | 5.6 GWh | 2.9 mi |
FAA NorCal TRACON | Mather AFB, CA | 1.7 GWh | 2.2 mi |
FRV SI Transport Solar LP | Sacramento, CA | 1.6 GWh | 8.2 mi |
Intel Folsom | Folsom, CA | 1.6 GWh | 7.9 mi |
Intel Folsom Phase 2 | Folsom, CA | 1.6 GWh | 8.3 mi |
Intel Folsom Phase 3 | Folsom, CA | 9.4 GWh | 8.4 mi |
Kiefer Landfill | Sloughhouse, CA | 69.7 GWh | 6.8 mi |
McClellan (CA) | Sacramento, CA | 4.0 GWh | 7.6 mi |
Nimbus | Folsom, CA | 47.4 GWh | 5.7 mi |
RE Dillard 1 LLC | Sloughhouse, CA | 6.8 GWh | 9.5 mi |
RE Dillard 2 LLC | Sloughhouse, CA | 7.0 GWh | 9.8 mi |
Sacramento (SMUD) | Sacramento, CA | 2.2 GWh | 9 mi |
Sacramento Fairbain Water Treatment Plant | Sacramento, CA | 1.4 GWh | 7 mi |
Sacramento Point West Medical Offices | Sacramento, CA | 2.5 GWh | 7.5 mi |
SCA Cogen 2 | Sacramento, CA | 659.2 GWh | 6.7 mi |
US GSA - Sacramento | Sacramento, CA | 2.4 GWh | 6 mi |