Rainbow (CT)
347 Rainbow Road, Windsor, CT 6095Plant Summary Information
Rainbow (CT) is ranked #34 out of 147 power plants in Connecticut in terms of total annual net electricity generation.
Rainbow (CT) is comprised of 2 generators and generated 13.6 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Rainbow (CT) |
---|---|
Utility Name | Farmington River Power Company |
Location | Capitol Planning Region, CT |
Initial Operation Date | December 1925 |
Last Update | Mar 2024 |
Annual Generation | 40.9 GWh |
Annual Consumption | 139.5 k MMBtu |
Ranked #4,059 out of 11,249 Power Plants Nationwide | |
Ranked #555 out of 1,354 Water Power Plants Nationwide | |
Ranked #34 out of 147 Connecticut Power Plants | |
Ranked #4 out of 13 Connecticut Water Power Plants | |
Fuel Types | Water |
Map of Rainbow (CT)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rainbow (CT).
Monthly Net Generation for Rainbow (CT)
Rainbow (CT) Details
Summary Information | |
---|---|
Plant Name | Rainbow (CT) (559) |
Plant Address | 347 Rainbow Road Windsor, CT 6095 |
Utility | Farmington River Power Company (6207) |
Latitude, Longitude | 41.91531, -72.69362 |
Generation Dates on File | Jan 2001 to Mar 2024 |
Initial Operation Date | December 1925 |
Annual Generation | 40.9 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Farmington River |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 27.60 kV |
Energy Storage | No |
Generator 1 Details Operating December 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator 2 Details Operating December 1925
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1925 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Rainbow (CT) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#545 | Du Bay | Eau Pleine, WI | 42.5 GWh |
#546 | Solomon Gulch | Valdez, AK | 42.0 GWh |
#547 | McClure Dam | Marquette, MI | 41.9 GWh |
#548 | Horseshoe Bend Hydroelectric Co | Horseshoe Bend, ID | 41.9 GWh |
#549 | Mystic | Fishtail, MT | 41.6 GWh |
#550 | Falls Village | Falls Village, CT | 41.5 GWh |
#551 | Hiram | Hiram, ME | 41.5 GWh |
#552 | Falls River Hydro | Ashton, ID | 41.1 GWh |
#553 | Allegheny No. 5 Hydro Station | Schenley, PA | 41.0 GWh |
#554 | El Dorado | Pollock Pines, CA | 40.9 GWh |
#556 | City Power Plant | Idaho Falls, ID | 40.8 GWh |
#557 | Broadwater Power Project | Toston, MT | 40.8 GWh |
#558 | Flint River | Albany, GA | 40.7 GWh |
#559 | Higley | Colton, NY | 40.5 GWh |
#560 | Soft Maple | Croghan, NY | 40.5 GWh |
#561 | Carters | Chatsworth, GA | 40.3 GWh |
#562 | Buzzard Roost | Chappells, SC | 40.1 GWh |
#563 | PHP 2 | Sandy, OR | 39.9 GWh |
#564 | Gay Robinson | Kaumakani, HI | 39.8 GWh |
#565 | Morgan Falls | Dunwoody, GA | 39.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rainbow (CT).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Algonquin Windsor Locks | Windsor Locks, CT | 126.2 GWh | 3.5 mi |
Bradley Energy Center | Windsor Locks, CT | 15.0 GWh | 1 mi |
Canis Major Solar Farm | Suffield, CT | 3.9 GWh | 6.8 mi |
Cellu Tissue | East Hartford, CT | 13.7 GWh | 10.6 mi |
CES Agawam Tuckahoe Solar Hybrid | Agawam, MA | 6.7 GWh | 9.9 mi |
East Windsor Solar One | East Windsor, CT | 6.7 GWh | 9.2 mi |
ENGIE 2019 ProjectCo-MA1, LLC | Agawam, MA | 6.8 GWh | 9 mi |
Goose Pond Solar | Southwick, MA | 7.4 GWh | 7.8 mi |
Hartford Hospital Cogeneration | Hartford, CT | 53.0 GWh | 10.6 mi |
Hartford Landfill Solar EGF | Hartford, CT | 1.6 GWh | 8.8 mi |
HSCo CHP | Hartford, CT | 28.8 GWh | 10.7 mi |
Kearsarge Southwick LLC | Southwick, MA | 6.4 GWh | 8.1 mi |
Niagara Bottling - Bloomfield | Bloomfield, CT | 50.0 MWh | 4.1 mi |
Nutmeg Solar | Enfield, CT | 39.7 GWh | 10.3 mi |
Pepperidge Farm Bloomfield | Bloomfield, CT | 14.4 GWh | 3.4 mi |
Route 57 Solar | Agawam, MA | 2.6 GWh | 10 mi |
South Windsor Fuel Cell | South Windsor, CT | 40.7 GWh | 8 mi |
Southington Solar One | Southington, CT | 7.9 GWh | 9.2 mi |
Southwick Solar PV | Southwick, MA | 9.0 GWh | 9.7 mi |
Ticket Network South Windsor | South Windsor, CT | 1.7 GWh | 11.6 mi |