Quinto Solar PV Project
30560 W. McCabe Road, Gustine, CA 95322Plant Summary Information
Quinto Solar PV Project is ranked #53 out of 747 solar farms in California in terms of total annual net electricity generation.
Quinto Solar PV Project generated 75.4 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Quinto Solar PV Project |
---|---|
Utility Name | Arevon Energy, Inc. |
Location | Merced County, CA |
Initial Operation Date | November 2015 |
Last Update | Dec 2022 |
Annual Generation | 293.1 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,913 out of 11,249 Power Plants Nationwide | |
Ranked #152 out of 5,158 Solar Power Plants Nationwide | |
Ranked #171 out of 1,501 California Power Plants | |
Ranked #53 out of 747 California Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
SunPower Corporation, Systems (2013 to 2017) CD Arevon USA, Inc. (2018 to 2021) Arevon Energy, Inc. (2022 to 2022) |
Map of Quinto Solar PV Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Quinto Solar PV Project.
Monthly Net Generation for Quinto Solar PV Project
Quinto Solar PV Project Details
Summary Information | |
---|---|
Plant Name | Quinto Solar PV Project (59339) |
Plant Address | 30560 W. McCabe Road Gustine, CA 95322 |
Utility | Arevon Energy, Inc. (61230) |
Latitude, Longitude | 37.13028, -121.05222 |
Generation Dates on File | Nov 2015 to Dec 2022 |
Initial Operation Date | November 2015 |
Annual Generation | 293.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG14-104-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SSC13 Details Operating November 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 108 MW |
Summer Capacity | 105.1 MW |
Winter Capacity | 76.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | November 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 135.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Quinto Solar PV Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#142 | Blythe Solar 110, LLC | Blythe, CA | 287.2 GWh |
#143 | Arlington Energy Center III | Blythe, CA | 290.3 GWh |
#144 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 293.3 GWh |
#145 | Hardin Solar Energy LLC | Alger, OH | 306.8 GWh |
#146 | Imperial Solar Energy Center South | Calexico, CA | 302.7 GWh |
#147 | American Kings Solar, LLC | Lemoore, CA | 300.2 GWh |
#148 | Nebula Solar | La Feria, TX | 299.3 GWh |
#149 | Wistaria Ranch Solar | Calexico, CA | 297.0 GWh |
#150 | West Line Solar, LLC | City of Eloy, AZ | 294.8 GWh |
#151 | Dougherty County Solar, LLC | Albany, GA | 293.6 GWh |
#153 | Colonial Trail West | Spring Grove, VA | 292.2 GWh |
#154 | Maverick Solar 6, LLC | Desert Center, CA | 286.9 GWh |
#155 | East Pecos Solar | McCamey, TX | 288.8 GWh |
#156 | Hunter Solar LLC (UT) | Clawson, UT | 287.9 GWh |
#157 | Jackpot Solar, LLC | Twin Falls, ID | 285.2 GWh |
#158 | RE Astoria | Rosamond, CA | 285.2 GWh |
#159 | Saint Solar | Coolidge, AZ | 285.0 GWh |
#160 | Rabbitbrush Solar, LLC | Rosamond, CA | 281.4 GWh |
#161 | Mesquite Solar 2, LLC | Tonopah, AZ | 283.5 GWh |
#162 | Briar Creek Solar 1 | Corsicana, TX | 283.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Quinto Solar PV Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Almond Power Plant | Modesto, CA | 207.5 GWh | 30.9 mi |
Central 40 | Newman, CA | 77.6 GWh | 8.5 mi |
Covanta Stanislaus Energy | Crows Landing, CA | 92.5 GWh | 18.3 mi |
Dinosaur Point | Los Banos, CA | 11.8 GWh | 8.7 mi |
Dos Palos | Dos Palos, CA | 1.7 GWh | 25.7 mi |
El Nido Facility | El Nido, CA | 47.8 GWh | 31.2 mi |
Enerparc CA1 LLC | Hollister, CA | 3.2 GWh | 28.3 mi |
Frontier Solar LLC | Newman, CA | 48.7 GWh | 17.8 mi |
Gilroy Peaking Energy Center | Gilroy, CA | 29.3 GWh | 28.2 mi |
Gilroy Power Plant | Gilroy, CA | 87.8 GWh | 28.2 mi |
Henry Miller RD | Dos Palos, CA | 593.0 MWh | 23.6 mi |
Hollister Solar LLC | Hollister, CA | 4.4 GWh | 27.8 mi |
Merced 1 PV | Los Banos, CA | 7.6 GWh | 13.7 mi |
Merced Solar LLC | Merced, CA | 4.5 GWh | 32.7 mi |
Mission Solar LLC | Merced, CA | 4.5 GWh | 32.8 mi |
Oro Loma | Oro Loma, CA | 55.0 GWh | 27.5 mi |
Sun Harvest Solar NDP1 | Dos Palos, CA | 4.0 GWh | 22.5 mi |
Vega Solar | Los Banos, CA | 49.1 GWh | 19.1 mi |
Walnut Energy Center | Turlock, CA | 1.7 TWh | 26.2 mi |
Wright Solar Park | Los Banos, CA | 482.3 GWh | 9.9 mi |