Quail Run Energy Center
2950 East Interstate 20, Odessa, TX 79766Plant Summary Information
Quail Run Energy Center is ranked #46 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Quail Run Energy Center is comprised of 6 generators and generated 651.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Quail Run Energy Center |
---|---|
Utility Name | CER Quail Run Energy Partners LP |
Location | Ector County, TX |
Initial Operation Date | May 2002 |
Last Update | Dec 2023 |
Annual Generation | 2.3 TWh |
Annual Consumption | 20.9 M MMBtu |
Ranked #482 out of 11,835 Power Plants Nationwide | |
Ranked #296 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #63 out of 749 Texas Power Plants | |
Ranked #46 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Quail Run Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Quail Run Energy Center.
Monthly Net Generation for Quail Run Energy Center
Quail Run Energy Center Details
Summary Information | |
---|---|
Plant Name | Quail Run Energy Center (56349) |
Plant Address | 2950 East Interstate 20, Odessa, TX 79766 |
Utility | CER Quail Run Energy Partners LP (56766) |
Latitude, Longitude | 31.8414, -102.315 |
Generation Dates on File | Jun 2007 to Dec 2023 |
Initial Operation Date | May 2002 |
Annual Generation | 2.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 07-41-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | City of Odessa |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ONEOK FIELD SERVICES |
Natural Gas Storage | No |
Generator CT2A Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 831 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 86.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 68 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CT2B Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 831 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 86.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 68 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CT1A Details Operating May 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 830 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 90.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 70 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator CT1B Details Operating May 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | 830 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 90.6 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 70 MW |
Winter Capacity | 84 MW |
Minimum Load | 55 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator ST1 Details Operating May 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 830 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 98.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 98.1 MW |
Winter Capacity | 98.1 MW |
Minimum Load | 58 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator ST2 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | 831 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 98.1 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 98.1 MW |
Winter Capacity | 98.1 MW |
Minimum Load | 58 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Quail Run Energy Center Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#286 | Harry Allen | Las Vegas, NV | 2.4 TWh |
#287 | RS Cogen | Lake Charles, LA | 2.4 TWh |
#288 | Apex Generating Station | Las Vegas, NV | 2.4 TWh |
#289 | Coyote Springs II | Boardman, OR | 2.4 TWh |
#290 | Pleasants Energy LLC | St Mary's, WV | 2.3 TWh |
#291 | Tenaska Gateway Generating Station | Mt. Enterprise, TX | 2.3 TWh |
#292 | Dogwood Energy Facility | Pleasant Hill, MO | 2.3 TWh |
#293 | Chesterfield | Chester, VA | 2.3 TWh |
#294 | Elk Hills Power LLC | Tupman, CA | 2.3 TWh |
#295 | La Paloma Generating Plant | McKittrick, CA | 2.3 TWh |
#297 | Rolling Hills Generating | Wilkesville, OH | 2.3 TWh |
#298 | Higgins Generating Station | Primm, NV | 2.3 TWh |
#299 | Lewis Creek | Willis, TX | 2.3 TWh |
#300 | Ingleside Cogeneration | Houston, TX | 2.3 TWh |
#301 | W A Parish | Thompsons, TX | 11.6 TWh |
#302 | Yates | Newnan, GA | 2.2 TWh |
#303 | Front Range Power Plant | Fountain, CO | 2.2 TWh |
#304 | Muskogee | Fort Gibson, OK | 2.6 TWh |
#305 | Goldendale Generating Station | Goldendale, WA | 2.2 TWh |
#306 | ANP Blackstone Energy Project | Blackstone, MA | 2.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Quail Run Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 902.8 GWh | 22.7 mi |
Bakke | Andrews, TX | 877.0 MWh | 34.1 mi |
Castle Gap Solar Hybrid | McCarney, TX | 385.9 GWh | 40.6 mi |
CED Crane Solar | Crane, TX | 405.5 GWh | 40.6 mi |
Ector County Energy Center | Goldsmith, TX | 425.6 GWh | 22.3 mi |
Goldsmith | Goldsmith, TX | 670.0 MWh | 20.9 mi |
N. Mary Francis | Odessa, TX | 782.0 MWh | 8.8 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 227.1 GWh | 31.9 mi |
Oberon IA | Odessa, TX | 276.9 GWh | 24.6 mi |
Oberon IB | Odessa, TX | 56.3 GWh | 24.7 mi |
Odessa-Ector Power Plant | Odessa, TX | 7.3 TWh | 0.7 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 42.7 GWh | 21.7 mi |
Permian Basin | Monahans, TX | 344.7 GWh | 42.1 mi |
Phoebe Solar | Kermit, TX | 518.7 GWh | 32.5 mi |
Pioneer Hutt Wind Energy | Midland, TX | 371.4 GWh | 24.3 mi |
Prospero Solar II | Andrews, TX | 675.9 GWh | 43.2 mi |
Stanton Wind Energy LLC | Lenorah, TX | 263.7 GWh | 39.1 mi |
Tumbleweed | Andrews, TX | 903.0 MWh | 38 mi |
Upton County Solar | McCamey, TX | 287.4 GWh | 41.5 mi |
Westover | Odessa, TX | 709.0 MWh | 7.7 mi |