Pyramid
53 Ramos Farms Road, Lordsburg, NM 88045Plant Summary Information
Pyramid is ranked #50 out of 135 power plants in New Mexico in terms of total annual net electricity generation.
Pyramid is comprised of 4 generators and generated 31.7 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Pyramid |
---|---|
Utility Name | Tri-State G & T Assn, Inc |
Location | Hidalgo County, NM |
Initial Operation Date | March 2003 |
Last Update | Dec 2022 |
Annual Generation | 74.3 GWh |
Annual Consumption | 768.5 k MMBtu |
Ranked #3,405 out of 11,249 Power Plants Nationwide | |
Ranked #1,002 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #50 out of 135 New Mexico Power Plants | |
Ranked #16 out of 19 New Mexico Natural Gas Power Plants | |
Fuel Types | Natural Gas : 94.5% Distillate Fuel Oil : 5.5% |
Map of Pyramid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pyramid.
Monthly Net Generation for Pyramid
Pyramid Details
Summary Information | |
---|---|
Plant Name | Pyramid (7975) |
Plant Address | 53 Ramos Farms Road Lordsburg, NM 88045 |
Utility | Tri-State G & T Assn, Inc (30151) |
Latitude, Longitude | 32.2363, -108.5494 |
Generation Dates on File | Jan 2004 to Dec 2022 |
Initial Operation Date | March 2003 |
Annual Generation | 74.3 GWh |
Fuel Types | Natural Gas : 94.5% Distillate Fuel Oil : 5.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Public Service Company of New Mexico (PNM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Co of NM (15473) NM |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | EL PASO NATURAL GAS COMPANY LLC |
Natural Gas Storage | No |
Generator 1 Details Operating March 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 46.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 39.5 MW |
Winter Capacity | 45.6 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 39.5 MW |
Net Winter Capacity With Natural Gas | 45.6 MW |
Net Summer Capacity With Oil | 40 MW |
Net Winter Capacity With Oil | 45.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2 Details Operating March 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 46.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 39.5 MW |
Winter Capacity | 45.6 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 39.5 MW |
Net Winter Capacity With Natural Gas | 45.6 MW |
Net Summer Capacity With Oil | 40 MW |
Net Winter Capacity With Oil | 45.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 4 Details Operating April 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 46.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 39.5 MW |
Winter Capacity | 45.6 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | April 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 39.5 MW |
Net Winter Capacity With Natural Gas | 45.6 MW |
Net Summer Capacity With Oil | 40 MW |
Net Winter Capacity With Oil | 45.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 3 Details Operating May 2003
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 46.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 39.5 MW |
Winter Capacity | 45.6 MW |
Minimum Load | 25 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2003 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 39.5 MW |
Net Winter Capacity With Natural Gas | 45.6 MW |
Net Summer Capacity With Oil | 40 MW |
Net Winter Capacity With Oil | 45.6 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Pyramid Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#992 | Chino Mines | Hurley, NM | 72.7 GWh |
#993 | Gallatin (TN) | Gallatin, TN | 4.1 TWh |
#994 | Essex | Essex, MO | 72.4 GWh |
#995 | Feather River Energy Center | Yuba City, CA | 72.2 GWh |
#996 | General Chemical | Green River, WY | 245.0 GWh |
#997 | International Paper Franklin Mill | Franklin, VA | 254.8 GWh |
#998 | Equus Freeport Power | Village of Freeport, NY | 72.5 GWh |
#999 | Fulton (AR) | Fulton, AR | 71.7 GWh |
#1000 | Brentwood | Long Island, NY | 70.9 GWh |
#1001 | Hopewell Mill | Hopewell, VA | 318.6 GWh |
#1003 | Elk River | Elk River, MN | 70.2 GWh |
#1004 | Rokeby | Lincoln, NE | 72.5 GWh |
#1005 | Terry Bundy Generating Station | Lincoln, NE | 95.8 GWh |
#1006 | International Paper Red River Mill | Campti, LA | 385.3 GWh |
#1007 | CityCenter Central Plant Cogen Units | Las Vegas, NV | 69.8 GWh |
#1008 | Sylvamo Corporation Eastover Facility | Eastover, SC | 573.4 GWh |
#1009 | Univ of Massachusetts Medical Center | Worcester, MA | 71.2 GWh |
#1010 | Packaging Corp of America | Counce, TN | 434.7 GWh |
#1011 | Jamaica Bay Peaking | Far Rockaway, NY | 70.5 GWh |
#1012 | Nippon Dynawave Packaging Longview WA | Longview, WA | 310.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pyramid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alta Luna | Deming, NM | 59.1 GWh | 66.2 mi |
Apache Solar 1 | Cochise, AZ | 57.6 GWh | 79.3 mi |
Apache Station | Cochise, AZ | 2.1 TWh | 79.5 mi |
Chino Mines | Hurley, NM | 72.7 GWh | 40.3 mi |
City of Truth or Consequences PV | Truth or Consequences, NM | 3.7 GWh | 95.5 mi |
Columbus Solar Project | Columbus, NM | 5.3 GWh | 61.8 mi |
Deming Solar Energy Center | Deming, NM | 19.7 GWh | 47 mi |
Douglas | Douglas, AZ | 53.3 MWh | 84.3 mi |
Hatch Solar Energy Center I, LLC | Hatch, NM | 11.0 GWh | 80 mi |
Lightning Dock Geothermal HI-01, LLC | Animas, NM | 38.5 GWh | 18 mi |
Lordsburg Generating | Lordsburg, NM | 81.1 GWh | 11.7 mi |
Luna Energy Facility | Deming, NM | 3.9 TWh | 45 mi |
Macho Springs | Deming, NM | 140.4 GWh | 66.5 mi |
Macho Springs Power I | Deming, NM | 144.0 GWh | 64.5 mi |
Red Horse 2 | Willcox, AZ | 217.7 GWh | 90 mi |
Red Horse III | Wilcox, AZ | 76.0 GWh | 88.1 mi |
Silver City WWTP PV Project | Silver City, NM | 2.1 GWh | 37.4 mi |
SR McNeal | McNeal, AZ | 11.8 GWh | 82.3 mi |
Sulphur Springs | Cochise, AZ | 55.7 GWh | 81 mi |
SunE EPE2 LLC | Las Cruces, NM | 30.9 GWh | 95.6 mi |