Pueblo Airport Generating Station
4000 North 27th Lane, Pueblo, CO 81001Plant Summary Information
Pueblo Airport Generating Station is ranked #11 out of 250 power plants in Colorado in terms of total annual net electricity generation.
Pueblo Airport Generating Station is comprised of 9 generators and generated 504.2 GWh during the 3-month period between December 2023 to March 2024.
Plant Name | Pueblo Airport Generating Station |
---|---|
Utility Name | Black Hills Service Company LLC |
Location | Pueblo County, CO |
Initial Operation Date | January 2012 |
Last Update | Mar 2024 |
Annual Generation | 1.6 TWh |
Annual Consumption | 15.4 M MMBtu |
Ranked #579 out of 11,249 Power Plants Nationwide | |
Ranked #357 out of 2,188 Natural Gas Power Plants Nationwide | |
Ranked #11 out of 250 Colorado Power Plants | |
Ranked #5 out of 33 Colorado Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Pueblo Airport Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pueblo Airport Generating Station.
Monthly Net Generation for Pueblo Airport Generating Station
Pueblo Airport Generating Station Details
Summary Information | |
---|---|
Plant Name | Pueblo Airport Generating Station (56998) |
Plant Address | 4000 North 27th Lane Pueblo, CO 81001 |
Utility | Black Hills Service Company LLC (56771) |
Latitude, Longitude | 38.32083, -104.52639 |
Generation Dates on File | Jan 2012 to Mar 2024 |
Initial Operation Date | January 2012 |
Annual Generation | 1.6 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | City of Pueblo |
Ash Impoundment | No |
Transmission / Distribution Owner | Black Hills/Colorado Elec.Util (56146) CO |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Other - Please explain in pipeline notes below. |
Pipeline Notes | Twin 12" pipelines supply natural gas to these generators, owned by those listed in Sch. 4. Called: Pueblo Airport Generating Station or PAGS Pipeline North or PAGS South. |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 4 Details Operating January 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB4 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 37 MW |
Winter Capacity | 37 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 43 Details Operating January 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB4 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | No |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating January 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB4 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 37 MW |
Winter Capacity | 37 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 53 Details Operating January 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB5 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | No |
Nameplate Capacity | 20 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 20 MW |
Winter Capacity | 20 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating January 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB5 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 37 MW |
Winter Capacity | 37 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating January 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB5 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 37 MW |
Winter Capacity | 37 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT1 Details Operating January 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 100 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GT2 Details Operating January 2012
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 100 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 90 MW |
Winter Capacity | 90 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 2012 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT08 Details Operating December 2016
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 40 MW |
Winter Capacity | 40 MW |
Minimum Load | 18 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | December 2016 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Pueblo Airport Generating Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Black Hills Colorado IPP, LLC | PO Box 1400, Rapid City, SD 57709 | Generator 4 | 100.00% |
Black Hills Colorado IPP, LLC | PO Box 1400, Rapid City, SD 57709 | Generator 43 | 100.00% |
Black Hills Colorado IPP, LLC | PO Box 1400, Rapid City, SD 57709 | Generator 5 | 100.00% |
Black Hills Colorado IPP, LLC | PO Box 1400, Rapid City, SD 57709 | Generator 53 | 100.00% |
Black Hills Colorado IPP, LLC | PO Box 1400, Rapid City, SD 57709 | Generator 6 | 100.00% |
Black Hills Colorado IPP, LLC | PO Box 1400, Rapid City, SD 57709 | Generator 7 | 100.00% |
Black Hills Colorado Electric, LLC | 7001 Mt. Rushmore Road, Rapid City, SD 57702 | Generator CT08 | 100.00% |
Black Hills Colorado Electric, LLC | 7001 Mt. Rushmore Road, Rapid City, SD 57702 | Generator GT1 | 100.00% |
Black Hills Colorado Electric, LLC | 7001 Mt. Rushmore Road, Rapid City, SD 57702 | Generator GT2 | 100.00% |
Black Hills Colorado Electric, LLC | 7001 Mt. Rushmore Road, Rapid City, SD 57702 | Generator GT3 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#347 | Noblesville | Noblesville, IN | 1.7 TWh |
#348 | Walnut Energy Center | Turlock, CA | 1.7 TWh |
#349 | Shell Chemical Appalachia LLC | Monaca, PA | 1.7 TWh |
#350 | PPG Powerhouse C | Lake Charles, LA | 1.7 TWh |
#351 | LaO Energy Systems | Plaquemine, LA | 1.9 TWh |
#352 | Theodore Cogen Facility | Theodore, AL | 1.7 TWh |
#353 | Russell City Energy Center | Hayward, CA | 1.7 TWh |
#354 | Shawville | Shawville, PA | 1.7 TWh |
#355 | Hot Spring Generating Facility | Malvern, AR | 1.6 TWh |
#356 | Renaissance Power Plant | Carson City, MI | 1.6 TWh |
#358 | Greater Des Moines | Pleasant Hill, IA | 1.6 TWh |
#359 | Crockett Cogen Project | Crockett, CA | 1.6 TWh |
#360 | Magnolia Power Project | Burbank, CA | 1.6 TWh |
#361 | Westlake Plaquemine | Plaquemine, LA | 1.6 TWh |
#362 | Brame Energy Center | Lena, LA | 4.5 TWh |
#363 | Handley | Fort Worth, TX | 1.6 TWh |
#364 | Motiva Enterprises Port Arthur Refinery | Port Arthur, TX | 1.7 TWh |
#365 | Barney M Davis | Corpus Christi, TX | 1.5 TWh |
#366 | Yates | Newnan, GA | 1.5 TWh |
#367 | Rolling Hills Generating | Wilkesville, OH | 1.5 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pueblo Airport Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bighorn Solar 1 | Pueblo, CO | 594.3 GWh | 8.7 mi |
Busch Ranch Wind Energy Farm | Walsenburg, CO | 96.8 GWh | 36 mi |
Carson Solar I | Colorado Springs, CO | 3.1 GWh | 31 mi |
CEC Solar #1117, LLC | Pueblo, CO | 4.1 GWh | 2.5 mi |
Clear Spring Ranch PV Project | Fountain, CO | 23.7 GWh | 21.5 mi |
Comanche (CO) | Pueblo, CO | 7.2 TWh | 8.2 mi |
Comanche Solar | Pueblo, CO | 282.2 GWh | 8.3 mi |
CSU Pueblo | Pueblo, CO | 1.6 GWh | 3.1 mi |
Fountain Valley Power Facility | Fountain, CO | 67.7 GWh | 18.5 mi |
Fremont CO 1, LLC | Canon City, CO | 4.1 GWh | 38.5 mi |
Front Range Power Plant | Fountain, CO | 2.4 TWh | 23.4 mi |
James W. Broderick Hydropower Plant | Pueblo, CO | 16.5 GWh | 11.1 mi |
Neptune Energy Center Hybrid | Boone, CO | 537.4 GWh | 6.1 mi |
Palmer Solar | Fountain, CO | 158.7 GWh | 22.4 mi |
Pike Solar Hybrid | Fountain, CO | 97.0 GWh | 21 mi |
Pikes Peak Solar Garden 1 LLC CSG | Colorado Springs, CO | 5.5 GWh | 33.5 mi |
Ray D Nixon | Fountain, CO | 997.8 GWh | 23.7 mi |
Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 507.3 GWh | 9.7 mi |
Thunder Wolf Energy Center Hybrid | Avondale, CO | 443.5 GWh | 11.4 mi |
Vestas Towers America, Inc. | Pueblo, CO | 2.4 GWh | 11.4 mi |