751 Cliff Road, Sewaren, NJ 7077Plant Summary Information
PSEG Sewaren Generating Station is ranked #7 out of 378 power plants in New Jersey in terms of total annual net electricity generation.
PSEG Sewaren Generating Station is comprised of 2 generators and generated 783.3 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | PSEG Sewaren Generating Station |
---|---|
Utility Name | Sewaren Generating Station |
Location | Middlesex County, NJ |
Initial Operation Date | November 1948 |
Last Update | Aug 2024 |
Annual Generation | 2.8 TWh |
Annual Consumption | 21.3 M MMBtu |
Ranked #416 out of 11,835 Power Plants Nationwide | |
Ranked #249 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #7 out of 378 New Jersey Power Plants | |
Ranked #5 out of 55 New Jersey Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Previous Operator |
PSEG Fossil LLC (2013 to 2021) Sewaren Generating Station (2022 to 2023) |
Map of PSEG Sewaren Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PSEG Sewaren Generating Station.
Monthly Net Generation for PSEG Sewaren Generating Station
PSEG Sewaren Generating Station Details
Summary Information | |
---|---|
Plant Name | PSEG Sewaren Generating Station (2411) |
Plant Address | 751 Cliff Road, Sewaren, NJ 7077 |
Utility | Sewaren Generating Station (65391) |
Latitude, Longitude | 40.5558, -74.2469 |
Generation Dates on File | Jan 2001 to Aug 2024 |
Initial Operation Date | November 1948 |
Annual Generation | 2.8 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 00-003-000, 02-125-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Arthur Kill River |
Ash Impoundment | No |
Transmission / Distribution Owner | Public Service Elec & Gas Co (15477) NJ |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
TRANSCONTINENTAL GAS PIPELINE TEXAS EASTERN TRANSMISSION LP |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator 701 Details Operating June 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC7 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 1379266905 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SEWAREN7 25KV |
Nameplate Capacity | 365.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 338 MW |
Winter Capacity | 338 MW |
Minimum Load | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 338 MW |
Net Winter Capacity With Natural Gas | 338 MW |
Net Summer Capacity With Oil | 320 MW |
Net Winter Capacity With Oil | 320 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 702 Details Operating June 2018
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC7 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | 1379266906 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | SEWAREN7 18KV |
Nameplate Capacity | 244 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 85 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
PSEG Sewaren Generating Station Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#239 | Sugar Creek Power | West Terre Haute, IN | 2.9 TWh |
#240 | Gila River Power Block 1 | Gila Bend, AZ | 2.8 TWh |
#241 | Currant Creek | Mona, UT | 2.8 TWh |
#242 | Bastrop Energy Center | Cedar Creek, TX | 2.8 TWh |
#243 | Quantum Choctaw Power LLC | Ackerman, MS | 2.8 TWh |
#244 | South Point Energy Center | Mohave Valley, AZ | 2.8 TWh |
#245 | Fore River Generating Station | North Weymouth, MA | 2.8 TWh |
#246 | GREC | Chouteau, OK | 3.4 TWh |
#247 | Seminole | Konowa, OK | 2.8 TWh |
#248 | Silverhawk | North Las Vegas, NV | 2.8 TWh |
#250 | Columbia Energy Center (SC) | Gaston, SC | 2.8 TWh |
#251 | Harquahala Generating Project | Tonopah, AZ | 2.7 TWh |
#252 | Rocky Mountain Energy Center | Keenesburg, CO | 2.7 TWh |
#253 | Port Westward | Clatskanie, OR | 2.7 TWh |
#254 | Emery Station | Clear Lake, IA | 2.7 TWh |
#255 | Holland Energy Facility | Beecher City, IL | 2.7 TWh |
#256 | James E. Rogers Energy Complex | Cliffside, NC | 6.4 TWh |
#257 | Kleen Energy Systems Project | Middletown, CT | 2.7 TWh |
#258 | Gulf Clean Energy Center | Pensacola, FL | 2.7 TWh |
#259 | Northeastern | Oologah, OK | 4.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PSEG Sewaren Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Amazon | Carteret, NJ | 3.3 GWh | 1.5 mi |
Apple Staten Island - Industrial Loop | Staten Island, NY | 40.1 GWh | 0.8 mi |
Apple Staten Island - Winant Place | Staten Island, NY | 39.5 GWh | 1.4 mi |
Arthur Kill Generating Station | Staten Island, NY | 1.1 TWh | 3.5 mi |
Bed Bath & Beyond DC Port Reading NJ | Port Reading, NJ | 2.2 GWh | 0.9 mi |
Certain Solar - Staten Island | Staten Island, NY | 55.0 GWh | 3.8 mi |
Fuel Cell 18A Sneden Avenue | Staten Island, NY | 26.7 GWh | 3.8 mi |
Fuel Cell 18B Sneden Avenue | Staten Island, NY | 28.3 GWh | 3.8 mi |
IGS Solar I - EWR5 | Avenel, NJ | 903.0 MWh | 1.9 mi |
IGS Solar I - EWR6 | Avenel, NJ | 801.0 MWh | 2 mi |
IOS - ERW9 | Carteret, NJ | 5.1 GWh | 2.9 mi |
Kinder Morgan Fordham | Staten Island, NY | 3.8 GWh | 1.1 mi |
Linden Hawk Rise Solar CSG | Linden, NJ | 6.2 GWh | 3.3 mi |
Matrix Buildings A&B (Perth Amboy) Solar | Perth Amboy, NJ | 2.7 GWh | 1.9 mi |
Merck Rahway Power Plant | Rahway, NJ | 42.8 GWh | 4.2 mi |
Port Reading 8 Solar | Carteret, NJ | 1.4 GWh | 1.6 mi |
THD Quicksilver - MDC Perth Amboy | Perth Amboy, NJ | 1.8 GWh | 0.4 mi |
Union County Resource Recovery | Rahway, NJ | 303.8 GWh | 3.3 mi |
US Foods Solar | Perth Amboy, NJ | 6.5 GWh | 2.1 mi |
Woodbridge Energy Center | Keasbey, NJ | 4.2 TWh | 4.7 mi |