Princeton (MN)
907 First Street, Princeton, MN 55371Plant Summary Information
Princeton (MN) is ranked #18 out of 76 distillate fuel oil power plants in Minnesota in terms of total annual net electricity generation.
Princeton (MN) is comprised of 5 generators and generated 37.8 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | Princeton (MN) |
---|---|
Utility Name | Princeton Public Utils Comm |
Location | Mille Lacs County, MN |
Initial Operation Date | September 1953 |
Last Update | Dec 2023 |
Annual Generation | 179.0 MWh |
Annual Consumption | 4.5 k MMBtu |
Ranked #11,312 out of 11,835 Power Plants Nationwide | |
Ranked #669 out of 1,262 Distillate Fuel Oil Power Plants Nationwide | |
Ranked #687 out of 736 Minnesota Power Plants | |
Ranked #18 out of 76 Minnesota Distillate Fuel Oil Power Plants | |
Fuel Types | Distillate Fuel Oil |
Map of Princeton (MN)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Princeton (MN).
Monthly Net Generation for Princeton (MN)
Princeton (MN) Details
Summary Information | |
---|---|
Plant Name | Princeton (MN) (2005) |
Plant Address | 907 First Street, Princeton, MN 55371 |
Utility | Princeton Public Utils Comm (15387) |
Latitude, Longitude | 45.56947, -93.58724 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | September 1953 |
Annual Generation | 179.0 MWh |
Fuel Types | Distillate Fuel Oil |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Municipality |
Ash Impoundment | No |
Transmission / Distribution Owner | Princeton Public Utils Comm (15387) MN |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 5 Details Operating September 1953
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRE.PRINC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.PRINC1 |
Nameplate Capacity | 1 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1 MW |
Winter Capacity | 1 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating September 1963
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRE.PRINC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.PRINC1 |
Nameplate Capacity | 2.7 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.9 MW |
Winter Capacity | 2.9 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1963 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 4 Details Operating September 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRE.PRINC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.PRINC1 |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 1967 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating December 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GRE.PRINC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.PRINC1 |
Nameplate Capacity | 2.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.6 MW |
Winter Capacity | 2.6 MW |
Minimum Load | 2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 1978 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 7 Details Operating July 2003
Technology | Petroleum Liquids |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | GEE.PRINC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | GRE.PRINC2 |
Nameplate Capacity | 5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2003 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Princeton (MN) Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#659 | Tower | Tower, MI | 195.0 MWh |
#660 | Yellowstone Energy LP | Billings, MT | 447.9 GWh |
#661 | South Generation | Redwood Falls, MN | 194.0 MWh |
#662 | Indeck Olean Energy Center | Olean, NY | 36.2 GWh |
#663 | Mankato Energy Center | Mankato, MN | 2.6 TWh |
#664 | Carlyle | Carlyle, IL | 189.0 MWh |
#665 | Tolna | New Freedom, PA | 188.0 MWh |
#666 | Cleveland Peaking | Cleveland, OH | 187.0 MWh |
#667 | Water Street Station | Bay City, MI | 204.0 MWh |
#668 | Higginsville | Higginsville, MO | 2.7 GWh |
#670 | Chesapeake | Chesapeake, VA | 178.0 MWh |
#671 | Eagle Point Power Generation | Westville, NJ | 238.5 GWh |
#672 | Casey City of | Casey, IL | 174.0 MWh |
#673 | SEMASS Resource Recovery | West Wareham, MA | 567.6 GWh |
#674 | NYC-HH-New Bellevue Hospital | New York, NY | 171.0 MWh |
#675 | Avenue A Generator Sets | Rock Falls, IL | 171.0 MWh |
#676 | Blooming Prairie | Blooming Prairie, MN | 167.0 MWh |
#677 | Galion | Galion, OH | 167.0 MWh |
#678 | Hardee Power Station | Bowling Green, FL | 895.2 GWh |
#679 | Greenland Energy Center | Jacksonville, FL | 550.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Princeton (MN).
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Athens MN CONX | Athens, MN | 9.9 GWh | 17.3 mi |
Big Lake Holdco Solar CSG | Big Lake, MN | 7.0 GWh | 18.6 mi |
Big Lake Project CSG | Big Lake, MN | 7.0 GWh | 19.1 mi |
Caelum Community Solar | Foley, MN | 2.9 GWh | 18.1 mi |
Cambridge CT Hybrid | Cambridge, MN | 49.4 GWh | 18.5 mi |
Connexus Solar Stanford 1STF | St. Francis, MN | 13.0 GWh | 14.3 mi |
Elk River | Elk River, MN | 47.3 GWh | 18.9 mi |
Elk River City of | Elk River, MN | 32.0 MWh | 17.5 mi |
Monticello Nuclear Facility | Monticello, MN | 5.3 TWh | 20.7 mi |
Novel Novak Solar LLC CSG | Foley, MN | 1.5 GWh | 17.8 mi |
Santee Solar Partners, LLC | Stanford Township, MN | 13.4 GWh | 14.3 mi |
Sherburne County | Becker, MN | 7.5 TWh | 19.7 mi |
SMMPA Methane Energy Facility | Mora, MN | 1.3 GWh | 22.3 mi |
Stevens Community Solar LLC | Foley, MN | 2.2 GWh | 18.3 mi |
Svihel Community Solar LLC CSG | Foley, MN | 2.0 GWh | 17.7 mi |
USS Big Lake 1 Solar CSG | Big Lake, MN | 2.1 GWh | 19.5 mi |
USS Foley Solar LLC | Foley, MN | 2.2 GWh | 18 mi |
USS Golly Gee Solar LLC | Clear Lake, MN | 713.0 MWh | 22.6 mi |
USS Mayhew Solar LLC CSG | Sauk Rapids, MN | 2.0 GWh | 22.7 mi |
USS Reindeer Solar LLC CSG | Sauk Rapids, MN | 2.1 GWh | 22.6 mi |