Priest Rapids
29086 Highway 243 South, Mattawa, WA 99349Plant Summary Information
Priest Rapids is ranked #9 out of 1,371 hydroelectric power plants nationwide in terms of total annual net electricity generation.
Priest Rapids is comprised of 10 generators and generated 970.6 GWh during the 3-month period between June 2024 to September 2024.
Plant Name | Priest Rapids |
---|---|
Utility Name | PUD No 2 of Grant County |
Location | Grant County, WA |
Initial Operation Date | October 1959 |
Last Update | Sep 2024 |
Annual Generation | 3.8 TWh |
Annual Consumption | 13.6 M MMBtu |
Ranked #298 out of 11,852 Power Plants Nationwide | |
Ranked #9 out of 1,371 Water Power Plants Nationwide | |
Ranked #6 out of 134 Washington Power Plants | |
Ranked #5 out of 70 Washington Water Power Plants | |
Fuel Types | Water |
Map of Priest Rapids
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Priest Rapids.
Monthly Net Generation for Priest Rapids
Priest Rapids Details
Summary Information | |
---|---|
Plant Name | Priest Rapids (3887) |
Plant Address | 29086 Highway 243 South, Mattawa, WA 99349 |
Utility | PUD No 2 of Grant County (14624) |
Latitude, Longitude | 46.6451, -119.908 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | October 1959 |
Annual Generation | 3.8 TWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Columbia River |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 9 Details Operating October 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 10 Details Operating November 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 8 Details Operating December 1959
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 1959 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 7 Details Operating January 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Planned Net Summer Capacity Uprate | 5 MW |
Planned Net Winter Capacity Uprate | 5 MW |
Planned Uprate | January 2024 |
Generator 6 Details Operating February 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | February 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating April 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 3 Details Operating September 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 4 Details Operating September 1960
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 1960 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating May 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 1961 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Generator 1 Details Operating July 1961
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 95 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 95 MW |
Winter Capacity | 95 MW |
Minimum Load | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 1961 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Time From Cold Shutdown To Full Load | 10M |
Priest Rapids Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1 | Robert Moses Niagara | Lewiston, NY | 15.8 TWh |
#2 | Grand Coulee | Grand Coulee, WA | 15.0 TWh |
#3 | Chief Joseph | Bridgeport, WA | 9.0 TWh |
#4 | Robert Moses Power Dam | Massena, NY | 7.5 TWh |
#5 | John Day | Rufus, OR | 6.9 TWh |
#6 | The Dalles | The Dalles, OR | 5.4 TWh |
#7 | Rocky Reach | Wenatchee, WA | 4.8 TWh |
#8 | Wanapum | Beverly, WA | 4.0 TWh |
#10 | McNary | Umatilla, OR | 3.6 TWh |
#11 | Bonneville | Cascade Locks, OR | 3.5 TWh |
#12 | Wells | Pateros, WA | 3.4 TWh |
#13 | Boundary | Metaline, WA | 3.1 TWh |
#14 | Glen Canyon Dam | Page, AZ | 2.8 TWh |
#15 | Edward C Hyatt | Oroville, CA | 2.4 TWh |
#16 | Shasta | Redding, CA | 2.4 TWh |
#17 | Wilson Dam | Muscle Shoals, AL | 2.2 TWh |
#18 | Garrison | Riverside, ND | 2.1 TWh |
#19 | Brownlee | Cambridge, ID | 2.1 TWh |
#20 | Oahe | Pierre, SD | 2.1 TWh |
#21 | Conowingo | Darlington, MD | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Priest Rapids.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Camas Solar Project | Ellensburg, WA | 10.3 GWh | 35.8 mi |
Chandler | Benton City, WA | 50.7 GWh | 30.2 mi |
Columbia Generating Station | Richland, WA | 9.9 TWh | 29.8 mi |
Cowiche | Tieton, WA | 3.4 GWh | 39.5 mi |
Eltopia Branch Canal 4.6 | Pasco, WA | 9.9 GWh | 36.1 mi |
Horn Rapids Solar, Storage and Training | Richland, WA | 6.6 GWh | 34.4 mi |
Juniper Canyon I Wind Project | Bickleton, WA | 255.0 GWh | 52.4 mi |
Orchard Avenue 1 | Yakima, WA | 2.6 GWh | 36.7 mi |
PEC Headworks | Moses Lake, WA | 18.7 GWh | 35.5 mi |
Penstemon Solar Project | Ellensburg, WA | 10.4 GWh | 35.8 mi |
Potholes East Canal 66.0 | Pasco, WA | 7.3 GWh | 36.1 mi |
Quincy Chute | Quincy, WA | 33.8 GWh | 38.6 mi |
Rock Island | Wenatchee, WA | 2.0 TWh | 49.2 mi |
Roza | Yakima, WA | 54.5 GWh | 27.1 mi |
Russell D Smith | Othello, WA | 17.0 GWh | 38.3 mi |
Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh | 50 mi |
Urtica Solar Project | Ellensburg, WA | 11.4 GWh | 48.8 mi |
Vantage Wind Energy LLC | Ellensburg, WA | 231.6 GWh | 25 mi |
Wanapum | Beverly, WA | 4.0 TWh | 16 mi |
Wild Horse | Ellensburg, WA | 589.0 GWh | 30.5 mi |