Pratt & Whitney
400 Main, East Hartford, CT 6108Plant Summary Information
Pratt & Whitney is ranked #21 out of 156 power plants in Connecticut in terms of total annual net electricity generation.
Pratt & Whitney is comprised of 1 generator and generated 23.8 GWh during the 3-month period between October 2024 to January 2025.
Plant Name | Pratt & Whitney |
---|---|
Utility Name | United Technologies |
Location | Capitol Planning Region, CT |
Initial Operation Date | January 1992 |
Last Update | Jan 2025 |
Annual Generation | 103.3 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #3,208 out of 11,979 Power Plants Nationwide | |
Ranked #904 out of 2,255 Natural Gas Power Plants Nationwide | |
Ranked #21 out of 156 Connecticut Power Plants | |
Ranked #14 out of 55 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Pratt & Whitney
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pratt & Whitney.
Monthly Net Generation for Pratt & Whitney
Pratt & Whitney Details
Summary Information | |
---|---|
Plant Name | Pratt & Whitney (54605) |
Plant Address | 400 Main, East Hartford, CT 6108 |
Utility | United Technologies (21621) |
Latitude, Longitude | 41.74833, -72.63669 |
Generation Dates on File | Jan 2001 to Jan 2025 |
Initial Operation Date | January 1992 |
Annual Generation | 103.3 GWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 91-44-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Transportation Equipment Manufacturing (336) |
Sector | Industrial CHP (7) |
Water Source | Closed Loop Tower Cooling |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 22.30 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | Algonquin Gas Transmission Company |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator FT-8 Details Operating January 1992
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 4004 Z Connecticut |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 4004 Z Connecticut |
Nameplate Capacity | 25.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 28 MW |
Winter Capacity | 31 MW |
Minimum Load | 12 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1992 |
---|---|
Combined Heat & Power | Yes |
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 28 MW |
Net Winter Capacity With Natural Gas | 31 MW |
Net Summer Capacity With Oil | 27 MW |
Net Winter Capacity With Oil | 27 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Pratt & Whitney Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#894 | Lincoln Combustion | Stanley, NC | 107.6 GWh |
#895 | TECO CHP-1 | Houston, TX | 106.3 GWh |
#896 | International Paper Texarkana Mill | Queen City, TX | 378.2 GWh |
#897 | Brunot Island | Pittsburg, PA | 105.2 GWh |
#898 | Bridgeport Fuel Cell, LLC | Bridgeport, CT | 105.1 GWh |
#899 | HP Hood CT | Winchester, VA | 104.5 GWh |
#900 | Carson Ice-Gen Project | Sacramento, CA | 104.4 GWh |
#901 | Calcasieu | Sulphur, LA | 104.4 GWh |
#902 | University of Illinois Cogen Facility | Chicago, IL | 104.1 GWh |
#903 | Pleasant Valley (MN) | Dexter, MN | 104.1 GWh |
#905 | Fort Dodge | Dodge City, KS | 100.7 GWh |
#906 | Pio Pico Energy Center | San Diego, CA | 100.1 GWh |
#907 | Graphic Packaging International Augusta Mill | Augusta, GA | 382.7 GWh |
#908 | Hell Gate | Bronx, NY | 99.8 GWh |
#909 | C R Wing Cogen Plant | Big Spring, TX | 99.6 GWh |
#910 | PCA, Filer City Mill | Filer City, MI | 98.9 GWh |
#911 | Edgewood Energy LLC | Brentwood, NY | 97.3 GWh |
#912 | Bacliff | Bacliff, TX | 96.8 GWh |
#913 | Bob Glanzer Generating Station | Huron, SD | 96.4 GWh |
#914 | Mont Belvieu Cogeneration Unit | Mont Belvieu, TX | 96.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pratt & Whitney.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ALDI DC 2 | South Windsor, CT | 1.7 GWh | 8.7 mi |
CCSU Co-Gen-STBY Gen | New Britain, CT | 88.2 MWh | 7.9 mi |
CCSU Fuel Cell Project | New Britain, CT | 10.2 GWh | 7.5 mi |
Cellu Tissue | East Hartford, CT | 11.8 GWh | 2.5 mi |
Corbin Russwin Phase 3 Berlin | Berlin, CT | 1.7 GWh | 9.1 mi |
Hartford Hospital Cogeneration | Hartford, CT | 43.8 GWh | 2.1 mi |
Hartford Landfill Solar EGF | Hartford, CT | 1.4 GWh | 3.1 mi |
HSCo CHP | Hartford, CT | 26.6 GWh | 1.9 mi |
Manchester Community College East | Manchester, CT | 1.4 GWh | 4.2 mi |
Manchester Community College North | Great Path, CT | 1.5 GWh | 3.9 mi |
Niagara Bottling - Bloomfield | Bloomfield, CT | 4.4 GWh | 8.9 mi |
Norcap North | East Windsor, CT | 3.4 GWh | 10.4 mi |
Norcap South | East Windsor, CT | 3.4 GWh | 10.4 mi |
Pepperidge Farm Bloomfield | Bloomfield, CT | 16.5 GWh | 9.4 mi |
South Meadow | Hartford, CT | 1.5 GWh | 0.8 mi |
South Windsor Fuel Cell | South Windsor, CT | 39.2 GWh | 4.8 mi |
Ticket Network South Windsor | South Windsor, CT | 1.6 GWh | 8.4 mi |
Town of Rocky Hill PV CSG | Rocky Hill, CT | 4.6 GWh | 7.3 mi |
Trinity College Fuel Cell | Hartford, CT | 8.9 GWh | 2.7 mi |
UDR Glastonbury Fuel Cell | Glastonbury, CT | 21.1 GWh | 5.6 mi |