Prairie Star Wind Farm is ranked #37 out of 739 power plants in Minnesota in terms of total annual net electricity generation.
Prairie Star Wind Farm generated 86.8 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Prairie Star Wind Farm |
---|---|
Utility Name | High Prairie Wind Farm II LLC |
Location | Mower County, MN |
Initial Operation Date | December 2007 |
Last Update | Dec 2023 |
Annual Generation | 259.1 GWh |
Annual Consumption | 996.9 k MMBtu |
Ranked #2,060 out of 12,016 Power Plants Nationwide | |
Ranked #626 out of 1,362 Wind Power Plants Nationwide | |
Ranked #37 out of 739 Minnesota Power Plants | |
Ranked #23 out of 125 Minnesota Wind Power Plants | |
Fuel Types | Wind |
Map of Prairie Star Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Prairie Star Wind Farm.
Monthly Net Generation for Prairie Star Wind Farm
Prairie Star Wind Farm Details
Summary Information | |
---|---|
Plant Name | Prairie Star Wind Farm (56494) |
Plant Address | 308 4th Ave NE, Grand Meadow, MN 55936 |
Utility | High Prairie Wind Farm II LLC (54904) |
Latitude, Longitude | 43.6861, -92.6272 |
Generation Dates on File | Dec 2007 to Dec 2023 |
Initial Operation Date | December 2007 |
Annual Generation | 259.1 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 07-19-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | ITC Transmission (56068) |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator HP2 Details Operating December 2007
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 100.7 MW |
Summer Capacity | 100.7 MW |
Winter Capacity | 100.7 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 61 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 61 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V82-1.65 |
Design Wind Speed | 16.4 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 265 |
Prairie Star Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#616 | Apple Blossom Wind Farm | Pigeon, MI | 266.2 GWh |
#617 | Meadow Creek Project Company | Idaho Falls, ID | 266.2 GWh |
#618 | South Trent Wind Farm | Sweetwater, TX | 264.8 GWh |
#619 | TransAlta Wyoming Wind | Evanston, WY | 264.6 GWh |
#620 | Pacific Wind LLC | Rosamond, CA | 264.0 GWh |
#621 | Stanton Wind Energy LLC | Lenorah, TX | 263.7 GWh |
#622 | Rising Tree Wind Farm III | Mojave, CA | 261.7 GWh |
#623 | Lost Lakes Wind Farm LLC | Lake Park, IA | 260.8 GWh |
#624 | Pheasant Run Wind LLC | Pigeon, MI | 260.1 GWh |
#625 | Laurel Mountain Hybrid | Belington, WV | 255.7 GWh |
#627 | South Peak Wind | Geyser, MT | 258.8 GWh |
#628 | Criterion | Oakland, MD | 258.5 GWh |
#629 | Charles City Wind Farm | Charles City, IA | 258.3 GWh |
#630 | Borderlands Wind, LLC | Quemado, NM | 257.8 GWh |
#631 | Sigel Wind Park | Harbor Beach, MI | 257.4 GWh |
#632 | Juniper Canyon I Wind Project | Bickleton, WA | 256.8 GWh |
#633 | Copenhagen Wind Farm | Copenhagen, NY | 256.7 GWh |
#634 | Foote Creek Rim | WY | 256.3 GWh |
#635 | Rail Splitter Wind Farm | Hopedale, IL | 255.9 GWh |
#636 | Sagebrush Power Partners | Ellensburg, WA | 255.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Prairie Star Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Adams Wind Farm | Adams, MN | 29.3 GWh | 10.3 mi |
Buffalo Center Wind LLC | Little Cedar, IA | 5.0 GWh | 21.8 mi |
Crane Creek Wind Energy Center | Riceville, IA | 282.2 GWh | 21.4 mi |
Fillmore County Solar Project | Spring Valley, MN | 18.9 GWh | 16.4 mi |
G McNeilus Wind Farm Dodge Center | Dodge Center, MN | 83.1 GWh | 23.1 mi |
Grand Meadow | Dexter, MN | 325.9 GWh | 4.5 mi |
Hayfield Solar I LLC CSG | Hayfield, MN | 1.8 GWh | 18.7 mi |
Hayfield Solar III LLC CSG | Hayfield, MN | 2.1 GWh | 19.9 mi |
Hwy 14 Holdco Solar CSG | Byron, MN | 7.1 GWh | 23.3 mi |
Louise Solar | Taopi, MN | 20.1 GWh | 9 mi |
Mower County Wind Energy Center | Grand Meadow, MN | 316.0 GWh | 5.2 mi |
Novel Byron Solar CSG | Byron, MN | 1.8 GWh | 22.4 mi |
Novel DeCook Solar CSG | Byron, MN | 1.9 GWh | 22.6 mi |
Novel Schmoll Farms Solar CSG | Dodge Center, MN | 2.1 GWh | 22.8 mi |
Pioneer Prairie Wind Farm | McIntire, IA | 911.8 GWh | 14 mi |
Pleasant Valley (MN) | Dexter, MN | 104.1 GWh | 8.3 mi |
Pleasant Valley Wind Farm | Dexter, MN | 746.8 GWh | 10.9 mi |
Spring Valley | Spring Valley, MN | 149.0 MWh | 11.9 mi |
Turtle Creek Wind Farm LLC | St. Ansgar, IA | 770.3 GWh | 20.7 mi |
Wapsipinicon Wind Project | Dexter, MN | 217.0 GWh | 8.4 mi |