Prairie Rose Wind Farm
2015 80th Ave, Hardwick, MN 56134Plant Summary Information
Prairie Rose Wind Farm is ranked #25 out of 736 power plants in Minnesota in terms of total annual net electricity generation.
Prairie Rose Wind Farm generated 79.7 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Prairie Rose Wind Farm |
---|---|
Utility Name | Enel Green Power NA, Inc. |
Location | Rock County, MN |
Initial Operation Date | December 2012 |
Last Update | Aug 2024 |
Annual Generation | 417.3 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,457 out of 11,835 Power Plants Nationwide | |
Ranked #418 out of 1,343 Wind Power Plants Nationwide | |
Ranked #25 out of 736 Minnesota Power Plants | |
Ranked #12 out of 125 Minnesota Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Enel North America, Inc. (2013 to 2013) Enel Green Power NA, Inc. (2014 to 2023) |
Map of Prairie Rose Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Prairie Rose Wind Farm.
Monthly Net Generation for Prairie Rose Wind Farm
Prairie Rose Wind Farm Details
Summary Information | |
---|---|
Plant Name | Prairie Rose Wind Farm (57644) |
Plant Address | 2015 80th Ave, Hardwick, MN 56134 |
Utility | Enel Green Power NA, Inc. (59380) |
Latitude, Longitude | 43.82822, -96.32157 |
Generation Dates on File | Jan 2013 to Aug 2024 |
Initial Operation Date | December 2012 |
Annual Generation | 417.3 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Northern States Power Co - Minnesota (13781) MN |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator PR1 Details Operating December 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 119 |
Turbine Details | |
Number Of Turbines | 119 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.68-82.5 |
Design Wind Speed | 24 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 328 |
Prairie Rose Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#408 | Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh |
#409 | Minco Wind III, LLC | Minco, OK | 421.7 GWh |
#410 | Papalote Creek I LLC | Taft, TX | 421.0 GWh |
#411 | Skookumchuck Wind Facility | Rainier, WA | 419.7 GWh |
#412 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 419.7 GWh |
#413 | Polaris Wind Park | North Star Township, MI | 419.4 GWh |
#414 | Oliver Wind III, LLC | Mandan, ND | 418.6 GWh |
#415 | Judith Gap Wind Energy Center | Harlowton, MT | 418.4 GWh |
#416 | Shiloh I Wind Project | Rio Vista, CA | 418.3 GWh |
#417 | Ranchland Wind Project I | Cisco, TX | 418.0 GWh |
#419 | Day County Wind LLC | Conde, SD | 416.7 GWh |
#420 | Mesquite Wind Power LLC | Abilene, TX | 414.7 GWh |
#421 | Briscoe Wind Farm | Silverton, TX | 414.6 GWh |
#422 | Mesteno | Rio Grande City, TX | 414.0 GWh |
#423 | Keechi Wind | Jacksboro, TX | 411.9 GWh |
#424 | Cottonwood Wind Energy Center | Blue Hill, NE | 410.7 GWh |
#425 | Crossing Trails Wind Power Project LLC. | Seibert, CO | 408.1 GWh |
#426 | Midway Wind, LLC | Taft, TX | 407.6 GWh |
#427 | Roscoe Wind Farm LLC | Roscoe, TX | 404.7 GWh |
#428 | Vienna Wind Farm | Marshalltown, IA | 403.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Prairie Rose Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antlia Community Solar | Edgerton, MN | 3.6 GWh | 10.6 mi |
Bisson Windfarm LLC | Pipestone, MN | 4.8 GWh | 11.9 mi |
Carstensen Wind | Pipestone, MN | 4.2 GWh | 14.7 mi |
CG Windfarm LLC | Woodstock, MN | 2.4 GWh | 12.5 mi |
Fenton Wind Farm | Chandler, MN | 294.7 GWh | 15.2 mi |
Greenback Energy | Pipestone, MN | 4.4 GWh | 14.4 mi |
Hilltop Power | Edgerton, MN | 4.0 GWh | 8.7 mi |
Johnson Solar CSG | Edgerton, MN | 9.1 GWh | 8.9 mi |
Lucky Wind | Pipestone, MN | 576.0 MWh | 14.6 mi |
Luverne | Luverne, MN | 68.0 MWh | 13.4 mi |
Northern Lights Wind LLC | Pipestone, MN | 157.0 MWh | 14.1 mi |
Pipestone City Solar LLC CSG | Pipestone, MN | 2.2 GWh | 13 mi |
Rock County Wind Fuel, LLC | Luverne, MN | 18.3 GWh | 13.2 mi |
Stahl Wind Energy | Pipestone, MN | 4.2 GWh | 14.7 mi |
TG Windfarm LLC | Pipestone, MN | 4.8 GWh | 12.2 mi |
Tofteland Windfarm LLC | Pipestone, MN | 9.0 GWh | 11.6 mi |
Uilk Wind LLC | Pipestone, MN | 12.3 GWh | 11.8 mi |
Valley View Transmission LLC | Chandler, MN | 20.3 GWh | 15.8 mi |
Walleye Wind | Beaver Creek, MN | 464.0 GWh | 13.6 mi |
Westridge Windfarm LLC | Woodstock, MN | 4.5 GWh | 12.3 mi |