4201 Powerlane, Greenville, TX 75401Plant Summary Information
Powerlane Plant is ranked #157 out of 304 natural gas power plants in Texas in terms of total annual net electricity generation.
Powerlane Plant is comprised of 6 generators and generated 6.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Powerlane Plant |
---|---|
Utility Name | City of Greenville - (TX) |
Location | Hunt County, TX |
Initial Operation Date | January 1966 |
Last Update | Dec 2023 |
Annual Generation | 62.4 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #3,680 out of 11,949 Power Plants Nationwide | |
Ranked #1,033 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #491 out of 769 Texas Power Plants | |
Ranked #157 out of 304 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas : 96.8% Distillate Fuel Oil : 3.2% |
Map of Powerlane Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Powerlane Plant.
Monthly Net Generation for Powerlane Plant
Powerlane Plant Details
Summary Information | |
---|---|
Plant Name | Powerlane Plant (4195) |
Plant Address | 4201 Powerlane, Greenville, TX 75401 |
Utility | City of Greenville - (TX) (7634) |
Latitude, Longitude | 33.1707, -96.1264 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | January 1966 |
Annual Generation | 62.4 GWh |
Fuel Types | Natural Gas : 96.8% Distillate Fuel Oil : 3.2% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | No 4 Reservoir |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Greenville - (TX) (7634) TX |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
Natural Gas Storage | No |
Generator ST1 Details Operating January 1966
Technology | Natural Gas Steam Turbine |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | STEA_STEAM_1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | STEA_STEAM_1 |
Nameplate Capacity | 18.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 18 MW |
Winter Capacity | 18 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1966 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating August 1967
Technology | Petroleum Liquids |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | STEA_STEAM_2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | STEA_STEAM_2 |
Nameplate Capacity | 25 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 23 MW |
Winter Capacity | 23 MW |
Minimum Load | 10 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1967 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 23 MW |
Net Winter Capacity With Natural Gas | 23 MW |
Net Summer Capacity With Oil | 20 MW |
Net Winter Capacity With Oil | 20 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator ST3 Details Operating August 1978
Technology | Petroleum Liquids |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | STEA_STEAM_3 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | STEA_STEAM_3 |
Nameplate Capacity | 43.2 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 41 MW |
Winter Capacity | 41 MW |
Minimum Load | 13 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 1978 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Distillate Fuel Oil / Natural Gas |
Startup Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 41 MW |
Net Winter Capacity With Natural Gas | 41 MW |
Net Summer Capacity With Oil | 38 MW |
Net Winter Capacity With Oil | 38 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator EP Details Operating June 2010
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | STEAM_ENG123 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | STEAM_ENG123 |
Nameplate Capacity | 8.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 8.2 MW |
Winter Capacity | 8.2 MW |
Minimum Load | 4.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator EP2 Details Operating June 2010
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | STEAM_ENG123 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | STEAM_ENG123 |
Nameplate Capacity | 8.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 8.2 MW |
Winter Capacity | 8.2 MW |
Minimum Load | 4.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator EP3 Details Operating June 2010
Technology | Natural Gas Internal Combustion Engine |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | STEAM_ENG123 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | STEAM_ENG123 |
Nameplate Capacity | 8.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 8.2 MW |
Winter Capacity | 8.2 MW |
Minimum Load | 4.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2010 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Powerlane Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1023 | Boulder Park | Spokane, WA | 63.9 GWh |
#1024 | California Institute of Technology | Pasadena, CA | 63.5 GWh |
#1025 | Blue Lake | Shakopee, MN | 63.1 GWh |
#1026 | Bayswater Peaking Facility LLC | Far Rockaway, NY | 62.9 GWh |
#1027 | Tilton | Tilton, IL | 62.7 GWh |
#1028 | Phelps Dodge Refining | El Paso, TX | 62.5 GWh |
#1029 | Oxbow Creek | Factoryville, PA | 62.4 GWh |
#1030 | CityCenter Central Plant Cogen Units | Las Vegas, NV | 62.2 GWh |
#1031 | F B Culley | Newburgh, IN | 1.8 TWh |
#1032 | Four Corners | Fruitland, NM | 8.5 TWh |
#1034 | Gillette SBMC | Boston, MA | 60.4 GWh |
#1035 | Roundtop | Meshoppen, PA | 60.3 GWh |
#1036 | Doyle Energy Facility | Monroe, GA | 60.1 GWh |
#1037 | Southeast Kern River Cogen | Bakersfield, CA | 59.0 GWh |
#1038 | Worthington Generation LLC | Worthington, IN | 58.9 GWh |
#1039 | Loma Linda University Cogen | Loma Linda, CA | 58.8 GWh |
#1040 | McKittrick Cogen | McKittrick, CA | 58.5 GWh |
#1041 | Benndale | Benndale, MS | 58.0 GWh |
#1042 | Johnsonburg Mill | Johnsonburg, PA | 137.2 GWh |
#1043 | Pine Bluff Mill | Pine Bluff, AR | 289.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Powerlane Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BT Signal Ranch | Quinlan, TX | 4.2 GWh | 13 mi |
Coniglio Solar | Wolfe City, TX | 197.1 GWh | 16.4 mi |
Forney Energy Center | Forney, TX | 9.7 TWh | 35.6 mi |
G.S.E. One LLC | Bonham, TX | 166.5 GWh | 22.8 mi |
HEB00789 | Frisco, TX | 177.0 MWh | 41.7 mi |
HEB00794 | McKinney, TX | 33.0 MWh | 34.8 mi |
Hopkins Energy LLC | Dike, TX | 346.2 GWh | 38.5 mi |
Lake Hubbard | Sunnyvale, TX | 899.7 GWh | 33.6 mi |
Leon Solar | Greenville, TX | 20.8 GWh | 6.6 mi |
Ray Olinger | Navada, TX | 117.4 GWh | 20.2 mi |
Rayburn Energy Station LLC | Sherman, TX | 3.8 TWh | 40.2 mi |
Sterling Solar (TX) | Greenville, TX | 16.7 GWh | 2.7 mi |
Toyota HQ Plan | Plano, TX | 8.5 GWh | 41.8 mi |
WAL202 | Frisco, TX | 76.0 MWh | 39.3 mi |
WAL2667 | Dallas, TX | 62.0 MWh | 41.8 mi |
WAL2883 | Plano, TX | 179.0 MWh | 39.2 mi |
WAL3224 | Garland, TX | 268.0 MWh | 35.5 mi |
WAL5211 | McKinney, TX | 7.0 MWh | 32.2 mi |
WAL5311 | Mckinney, TX | 3.0 MWh | 35.4 mi |
Whitewright Solar | Whitewright, TX | 20.2 GWh | 26.9 mi |