Potter Station 2
150 Potter Road, Braintree, MA 2184Plant Summary Information
Potter Station 2 is ranked #42 out of 598 power plants in Massachusetts in terms of total annual net electricity generation.
Potter Station 2 is comprised of 4 generators and generated 14.4 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Potter Station 2 |
---|---|
Utility Name | Town of Braintree - (MA) |
Location | Norfolk County, MA |
Initial Operation Date | July 1963 |
Last Update | Dec 2023 |
Annual Generation | 32.3 GWh |
Annual Consumption | 390.6 k MMBtu |
Ranked #4,448 out of 11,835 Power Plants Nationwide | |
Ranked #1,289 out of 2,253 Natural Gas Power Plants Nationwide | |
Ranked #42 out of 598 Massachusetts Power Plants | |
Ranked #25 out of 44 Massachusetts Natural Gas Power Plants | |
Fuel Types | Natural Gas : 88.2% Distillate Fuel Oil : 11.8% |
Map of Potter Station 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Potter Station 2.
Monthly Net Generation for Potter Station 2
Potter Station 2 Details
Summary Information | |
---|---|
Plant Name | Potter Station 2 (1660) |
Plant Address | 150 Potter Road, Braintree, MA 2184 |
Utility | Town of Braintree - (MA) (2144) |
Latitude, Longitude | 42.235, -70.9672 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | July 1963 |
Annual Generation | 32.3 GWh |
Fuel Types | Natural Gas : 88.2% Distillate Fuel Oil : 11.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Town of Braintree - (MA) (2144) MA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | Other - See pipeline notes. |
Pipeline Name | Algonquin Gas Transmission Company |
Pipeline Notes | Combined cycle - Potter Station supplied by National Grid. Jet Engines - aka. Watson Station - supplied via Algonquin Gas Transmission Company |
Natural Gas Storage | No |
Liquefied Natural Gas Storage | No |
Generator CC2 Details Out of Service April 1977
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | POT2 |
Ownership | Jointly Owned |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 540 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 540 |
Nameplate Capacity | 76 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 62.6 MW |
Winter Capacity | 77.6 MW |
Minimum Load | 37 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | April 1977 |
Planned Retirement | January 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 62.6 MW |
Net Winter Capacity With Natural Gas | 77.6 MW |
Net Summer Capacity With Oil | 62.6 MW |
Net Winter Capacity With Oil | 77.6 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator CC3 Details Out of Service April 1977
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | POT2 |
Ownership | Jointly Owned |
Duct Burners | No |
RTO ISO LMP Node Designation | 540 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 540 |
Nameplate Capacity | 25 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 15.5 MW |
Winter Capacity | 18.5 MW |
Minimum Load | 8 MW |
Uprate/Derate Completed | No |
Status | Out of Service |
---|---|
First Operation Date | April 1977 |
Planned Retirement | January 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator WAT1 Details Operating July 2009
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 15484 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 15484 |
Nameplate Capacity | 58 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 52.6 MW |
Winter Capacity | 57.4 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Subcritical Technology | No |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 52.6 MW |
Net Winter Capacity With Natural Gas | 57.4 MW |
Net Summer Capacity With Oil | 52.6 MW |
Net Winter Capacity With Oil | 57.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator WAT2 Details Operating July 2009
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 15485 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 15485 |
Nameplate Capacity | 58 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 52.6 MW |
Winter Capacity | 57.4 MW |
Minimum Load | 28 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2009 |
---|---|
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 52.6 MW |
Net Winter Capacity With Natural Gas | 57.4 MW |
Net Summer Capacity With Oil | 52.6 MW |
Net Winter Capacity With Oil | 57.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Potter Station 2 Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Town of Braintree - (MA) | 150 Potter Road, East Braintree, MA 2184 | Generator CC2 | 92.49% |
City of Hingham - (MA) | 31 Bare Cove Park Drive, Hingham, MA 2043 | Generator CC2 | 2.30% |
Town of North Attleborough - (MA) | 275 Landry Avenue, North Attleborough, MA 2760 | Generator CC2 | 5.21% |
Town of Braintree - (MA) | 150 Potter Road, East Braintree, MA 2184 | Generator CC3 | 92.49% |
City of Hingham - (MA) | 31 Bare Cove Park Drive, Hingham, MA 2043 | Generator CC3 | 2.30% |
Town of North Attleborough - (MA) | 275 Landry Avenue, North Attleborough, MA 2760 | Generator CC3 | 5.21% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1279 | Narrows Gas Turbines Generating | Brooklyn, NY | 31.4 GWh |
#1280 | Somerset Plant | Skowhegan, ME | 485.5 GWh |
#1281 | Rutgers Biomedical and Health Cogen | Newark, NJ | 30.0 GWh |
#1282 | New Mexico State University | Las Cruces, NM | 30.0 GWh |
#1283 | CoreSite - Somerville | Somerville, MA | 29.8 GWh |
#1284 | McPherson 2 | McPherson, KS | 37.8 GWh |
#1285 | POET Biorefining - Marion, LLC | Marion, OH | 29.7 GWh |
#1286 | EQX015 Great Oaks Fuel Cell | San Jose, CA | 29.2 GWh |
#1287 | Astoria Gas Turbines | Astoria, NY | 33.5 GWh |
#1288 | Norton Powerhouse 2 | Worcester, MA | 28.9 GWh |
#1290 | Fuel Cell 18B Sneden Avenue | Staten Island, NY | 28.3 GWh |
#1291 | Mill Creek (KY) | Louisville, KY | 7.3 TWh |
#1292 | Equinix Great Oaks Blvd. Fuel Cell | San Jose, CA | 28.2 GWh |
#1293 | TES Filer City Station | Filer City, MI | 226.6 GWh |
#1294 | Gaylord Container Bogalusa | Bogalusa, LA | 406.1 GWh |
#1295 | Pleasants Power Station | Willow Island, WV | 2.2 TWh |
#1296 | Riverview Energy Center | Antioch, CA | 27.9 GWh |
#1297 | Equinix Lundy Ave. Fuel Cell | San Jose, CA | 27.8 GWh |
#1298 | CSUF Trigeneration | Fullerton, CA | 33.9 GWh |
#1299 | University of Iowa Main Power Plant | Iowa City, IA | 49.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Potter Station 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boston Medical Center CHP Plant | Boston, MA | 12.1 GWh | 8.8 mi |
Boston Scientific Solar | Quincy, MA | 1.3 GWh | 5.3 mi |
Braintree Landfill Solar | Braintree, MA | 1.2 GWh | 2.5 mi |
Canton | Canton, MA | 6.4 GWh | 10.4 mi |
CoreSite - Somerville | Somerville, MA | 29.8 GWh | 11.4 mi |
Deer Island Treatment Plant | Winthrop, MA | 37.5 GWh | 8.2 mi |
Dorchester Solar Site | Dorchester, MA | 181.0 MWh | 6.1 mi |
Fore River Generating Station | North Weymouth, MA | 2.8 TWh | 0.5 mi |
Gillette SBMC | Boston, MA | 61.0 GWh | 8.8 mi |
Hull Wind II | Hull, MA | 2.5 GWh | 5.9 mi |
Kendall Square Station | Cambridge, MA | 1.6 TWh | 10.6 mi |
M Street Jet | Boston, MA | 275.0 MWh | 7.9 mi |
Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 204.5 GWh | 10.8 mi |
Meadow Solar | Boston, MA | 4.3 GWh | 8.5 mi |
Medical Area Total Energy Plant | Boston, MA | 338.6 GWh | 10.1 mi |
Onyx - Brockton Thatcher Landfill Solar CSG | Brockton, MA | 4.3 GWh | 11.7 mi |
Randolph | Randolph, MA | 5.9 GWh | 6.9 mi |
Rockland Solar CSG | Rockland, MA | 2.9 GWh | 10.7 mi |
Shuman Solar | Stoughton, MA | 2.2 GWh | 9.7 mi |
UMass Boston | Dorchester, MA | 659.0 MWh | 6.4 mi |