Post Rock Wind Power Project, LLC
307 11th Road, Ellsworth, KS 67439Plant Summary Information
Post Rock Wind Power Project, LLC is ranked #43 out of 152 power plants in Kansas in terms of total annual net electricity generation.
Post Rock Wind Power Project, LLC generated 113.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Post Rock Wind Power Project, LLC |
---|---|
Utility Name | Pattern Operators LP |
Location | Ellsworth County, KS |
Initial Operation Date | September 2012 |
Last Update | Aug 2024 |
Annual Generation | 419.7 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,451 out of 11,835 Power Plants Nationwide | |
Ranked #412 out of 1,343 Wind Power Plants Nationwide | |
Ranked #43 out of 152 Kansas Power Plants | |
Ranked #34 out of 49 Kansas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Post Rock Wind Power Project, LLC (2013 to 2014) Pattern Operators LP (2015 to 2023) |
Map of Post Rock Wind Power Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Post Rock Wind Power Project, LLC.
Monthly Net Generation for Post Rock Wind Power Project, LLC
Post Rock Wind Power Project, LLC Details
Summary Information | |
---|---|
Plant Name | Post Rock Wind Power Project, LLC (57678) |
Plant Address | 307 11th Road, Ellsworth, KS 67439 |
Utility | Pattern Operators LP (56545) |
Latitude, Longitude | 38.84167, -98.29944 |
Generation Dates on File | Sep 2012 to Aug 2024 |
Initial Operation Date | September 2012 |
Annual Generation | 419.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Southwest Power Pool (SWPP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Midwest Energy Inc (12524) KS |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2012
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 201 MW |
Summer Capacity | 201 MW |
Winter Capacity | 201 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2012 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 134 |
Turbine Details | |
Number Of Turbines | 134 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5-82.5 |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Post Rock Wind Power Project, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#402 | Buffalo Gap 2 Wind Farm | Merkel, TX | 427.9 GWh |
#403 | Minco Wind IV, LLC | Hinton, OK | 427.3 GWh |
#404 | Bingham Wind | Bingham, ME | 426.6 GWh |
#405 | Heartland Divide Wind Project, LLC | Melville, IA | 426.6 GWh |
#406 | Sunflower Wind Project | Mandan, ND | 426.4 GWh |
#407 | Grand Ridge Wind Energy Center | Marseilles, IL | 426.0 GWh |
#408 | Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh |
#409 | Minco Wind III, LLC | Minco, OK | 421.7 GWh |
#410 | Papalote Creek I LLC | Taft, TX | 421.0 GWh |
#411 | Skookumchuck Wind Facility | Rainier, WA | 419.7 GWh |
#413 | Polaris Wind Park | North Star Township, MI | 419.4 GWh |
#414 | Oliver Wind III, LLC | Mandan, ND | 418.6 GWh |
#415 | Judith Gap Wind Energy Center | Harlowton, MT | 418.4 GWh |
#416 | Shiloh I Wind Project | Rio Vista, CA | 418.3 GWh |
#417 | Ranchland Wind Project I | Cisco, TX | 418.0 GWh |
#418 | Prairie Rose Wind Farm | Hardwick, MN | 417.3 GWh |
#419 | Day County Wind LLC | Conde, SD | 416.7 GWh |
#420 | Mesquite Wind Power LLC | Abilene, TX | 414.7 GWh |
#421 | Briscoe Wind Farm | Silverton, TX | 414.6 GWh |
#422 | Mesteno | Rio Grande City, TX | 414.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Post Rock Wind Power Project, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beloit | Beloit, KS | 114.0 MWh | 43.7 mi |
Beloit Solar LLC | Beloit, KS | 4.7 GWh | 43.3 mi |
Cloud County Wind Farm | Concordia, KS | 334.4 GWh | 53.4 mi |
Ellinwood | Ellinwood, KS | 48.0 MWh | 37 mi |
Goodman Energy Center | Hays, KS | 112.1 GWh | 57.5 mi |
Great Bend - Sunflower | Great Bend, KS | 32.0 GWh | 42.8 mi |
Hoisington | Hoisington, KS | 62.0 MWh | 34.2 mi |
Hutchinson Energy Center | Hutchinson, KS | 24.9 GWh | 56.8 mi |
Kansas Ethanol, LLC | Lyons, KS | 113.4 GWh | 38.8 mi |
La Crosse | La Crosse, KS | 24.0 MWh | 58.5 mi |
Lincoln | Lincoln, KS | 16.0 MWh | 15.6 mi |
McPherson 2 | McPherson, KS | 37.8 GWh | 46.9 mi |
McPherson 3 | McPherson, KS | 15.5 GWh | 48.6 mi |
Minneapolis City of | Minneapolis, KS | 84.0 MWh | 37.1 mi |
Osborne | Osborne, KS | 7.8 MWh | 46.5 mi |
Russell Downtown | Russell, KS | 78.0 MWh | 30.2 mi |
Russell Energy Center | Russell, KS | 2.4 GWh | 29.3 mi |
Smoky Hills Wind Project Phase I | Lincoln, KS | 272.0 GWh | 7.9 mi |
Smoky Hills Wind Project Phase II | Lincoln, KS | 437.7 GWh | 7.9 mi |
Sterling | Sterling, KS | 157.0 MWh | 43.6 mi |