Port Washington Generating Station
146 South Wisconsin Street, Port Washington, WI 53074Plant Summary Information
Port Washington Generating Station is ranked #32 out of 2,254 natural gas power plants nationwide in terms of total annual net electricity generation.
Port Washington Generating Station is comprised of 6 generators and generated 2.1 TWh during the 3-month period between July 2024 to October 2024.
Plant Name | Port Washington Generating Station |
---|---|
Utility Name | Wisconsin Electric Power Co |
Location | Ozaukee County, WI |
Initial Operation Date | July 2005 |
Last Update | Oct 2024 |
Annual Generation | 7.7 TWh |
Annual Consumption | 58.4 M MMBtu |
Ranked #102 out of 11,866 Power Plants Nationwide | |
Ranked #32 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #2 out of 216 Wisconsin Power Plants | |
Ranked #1 out of 50 Wisconsin Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Port Washington Generating Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Port Washington Generating Station.
Monthly Net Generation for Port Washington Generating Station
Port Washington Generating Station Details
Summary Information | |
---|---|
Plant Name | Port Washington Generating Station (4040) |
Plant Address | 146 South Wisconsin Street, Port Washington, WI 53074 |
Utility | Wisconsin Electric Power Co (20847) |
Latitude, Longitude | 43.3842, -87.8689 |
Generation Dates on File | Jan 2001 to Oct 2024 |
Initial Operation Date | July 2005 |
Annual Generation | 7.7 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake Michigan |
Ash Impoundment | No |
Transmission / Distribution Owner | American Transmission Co (659) WI |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 2CT1 Details Operating July 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PWG2 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | WEC.PORTWCT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PORTWCT1 |
Nameplate Capacity | 173.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 174.8 MW |
Winter Capacity | 204.2 MW |
Minimum Load | 101 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2CT2 Details Operating July 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PWG2 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | WEC.PORTWCT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PORTWCT2 |
Nameplate Capacity | 173.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 174.9 MW |
Winter Capacity | 204.5 MW |
Minimum Load | 101 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating July 2005
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PWG2 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
RTO ISO LMP Node Designation | WEC.PORTWST1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PORTWST1 |
Nameplate Capacity | 268.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 264.7 MW |
Winter Capacity | 264.3 MW |
Minimum Load | 131 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2005 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1CT1 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PWG1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | WEC.PORTWA1CT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PORTWA1CT1 |
Nameplate Capacity | 173.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 178.2 MW |
Winter Capacity | 207 MW |
Minimum Load | 101 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1CT2 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PWG1 |
Ownership | Wholly Owned by Other Entity |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | WEC.PORTWA1CT2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PORTWA1CT2 |
Nameplate Capacity | 173.1 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 178.8 MW |
Winter Capacity | 207 MW |
Minimum Load | 101 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating May 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PWG1 |
Ownership | Wholly Owned by Other Entity |
Duct Burners | Yes |
RTO ISO LMP Node Designation | WEC.PORTWA1ST0 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | WEC.PORTWA1ST0 |
Nameplate Capacity | 268.6 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 265.1 MW |
Winter Capacity | 265.2 MW |
Minimum Load | 131 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2008 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Subcritical Technology | Yes |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Port Washington Generating Station Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We Power | 231 W. Michigan Ave., Milwaukee, WI 53203 | Generator 1CT1 | 100.00% |
We Power | 231 W. Michigan Ave., Milwaukee, WI 53203 | Generator 1CT2 | 100.00% |
We Power | 231 W. Michigan Ave., Milwaukee, WI 53203 | Generator 2CT1 | 100.00% |
We Power | 231 W. Michigan Ave., Milwaukee, WI 53203 | Generator 2CT2 | 100.00% |
We Power | 231 W. Michigan Ave., Milwaukee, WI 53203 | Generator ST1 | 100.00% |
We Power | 231 W. Michigan Ave., Milwaukee, WI 53203 | Generator ST2 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#22 | Lawrenceburg Power, LLC | Lawrenceburg, IN | 8.6 TWh |
#23 | Thomas A Smith Energy Facility | Dalton, GA | 8.5 TWh |
#24 | Seminole (FL) | Palatka, FL | 11.0 TWh |
#25 | Hummel Station LLC | Shamokin Dam, PA | 8.3 TWh |
#26 | Brunswick County Power Station | Freeman, VA | 8.2 TWh |
#27 | Wansley Combined Cycle | Franklin, GA | 8.2 TWh |
#28 | Deer Park Energy Center | Deer Park, TX | 7.9 TWh |
#29 | McIntosh Combined Cycle Facility | Rincon, GA | 7.8 TWh |
#30 | Moxie Freedom Generation Plant | Salem Township, PA | 7.8 TWh |
#31 | Fairless Energy Center | Fairless Hills, PA | 7.8 TWh |
#33 | Indeck Niles Energy Center | Niles, MI | 7.7 TWh |
#34 | Paradise | Drakesboro, KY | 7.6 TWh |
#35 | Riviera | Riviera Beach, FL | 7.5 TWh |
#36 | Odessa-Ector Power Plant | Odessa, TX | 7.5 TWh |
#37 | Martin | Indiantown, FL | 7.4 TWh |
#38 | Jackson Generation, LLC | Elwood, IL | 7.4 TWh |
#39 | New Covert Generating Facility | Covert, MI | 7.3 TWh |
#40 | Freestone Energy Center | Fairfield, TX | 7.2 TWh |
#41 | Wolf Hollow II | Granbury, TX | 7.2 TWh |
#42 | CPV Fairview Energy Center | Johnstown, PA | 7.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Port Washington Generating Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ATI | Cudahy, WI | 3.6 GWh | 30.4 mi |
Butler Ridge | Mayville, WI | 139.3 GWh | 30.8 mi |
Cedar Ridge | Eden, WI | 161.3 GWh | 31.4 mi |
City of Milwaukee Landfill | Milwaukee, WI | 3.7 GWh | 31.1 mi |
Edgewater | Sheboygan, WI | 2.0 TWh | 24.3 mi |
Forward Wind Energy Center | Brownsville, WI | 145.1 GWh | 35.3 mi |
Germantown | Germantown, WI | 13.2 GWh | 19.2 mi |
Harley-Davison Powertrain Operations | Menomonee Falls, WI | 2.8 GWh | 18 mi |
IKEA Oak Creek Rooftop PV System | Oak Creek, WI | 1.4 GWh | 33.4 mi |
Kohler Solar | Kohler, WI | 3.0 GWh | 25.6 mi |
Lannon Stone | Pewaukee, WI | 3.4 GWh | 26.3 mi |
MMSD Jones Island Wastewater | Milwaukee, WI | 58.5 GWh | 25.1 mi |
MMSD South Shore Wastewater | Oak Creek, WI | 30.2 GWh | 34.4 mi |
Omega Hills Gas Recovery | Germantown, WI | 86.2 GWh | 19.7 mi |
Onion River | Sheboygan Cedar Grove, WI | 187.8 GWh | 15 mi |
Regal Ware | West Bend, WI | 2.7 GWh | 15.8 mi |
Sheboygan Falls | Sheboygan, WI | 546.5 GWh | 25.4 mi |
Springfield Solar (WI) | Lomira, WI | 175.6 GWh | 32.5 mi |
Valley (WI) | Milwaukee, WI | 421.0 GWh | 24.6 mi |
Washington County | West Bend, WI | 3.8 GWh | 15 mi |