Port Townsend Paper

100 Paper Mill Rd, Port Townsend, WA 98368

Plant Summary Information

Port Townsend Paper is ranked #4 out of 4 black liquor power plants in Washington in terms of total annual net electricity generation.

Port Townsend Paper is comprised of 2 generators and generated 10.5 GWh during the 3-month period between September 2023 to December 2023.

Plant NamePort Townsend Paper
Utility NamePort Townsend Paper Co
LocationJefferson County, WA
Initial Operation DateJanuary 1929
Last Update Dec 2023
Annual Generation 35.3 GWh
Annual Consumption 11.4 M MMBtu
Ranked #5,049 out of 11,832 Power Plants Nationwide
Ranked #81 out of 85 Black Liquor Power Plants Nationwide
Ranked #103 out of 134 Washington Power Plants
Ranked #4 out of 4 Washington Black Liquor Power Plants
Fuel Types Black Liquor : 81.5% Wood/Wood Waste Solids : 13.7% Natural Gas : 3.5% Waste/Other Oil : 1.3%

Map of Port Townsend Paper

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Port Townsend Paper.

Create Your Account Today

Monthly Net Generation for Port Townsend Paper

Port Townsend Paper Details

Summary Information
Plant NamePort Townsend Paper (50544)
Plant Address100 Paper Mill Rd Port Townsend, WA 98368
UtilityPort Townsend Paper Co (26840)
Latitude, Longitude48.0931, -122.7958
Generation Dates on FileJan 2001 to Dec 2023
Initial Operation DateJanuary 1929
Annual Generation 35.3 GWh
Fuel Types Black Liquor : 81.5% Wood/Wood Waste Solids : 13.7% Natural Gas : 3.5% Waste/Other Oil : 1.3%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityBonneville Power Administration (BPAT)
NAICS CodePaper Manufacturing (322)
Sector Industrial CHP (7)
Water SourceBigquilcene Riv &Prttowns Bay
Ash Impoundment No
Transmission / Distribution OwnerPUD No 1 of Jefferson County (59013) WA
Grid Voltage 114.00 kV
Energy StorageNo

Generator HDRO Details Operating August 1982

TechnologyConventional Hydroelectric
Prime MoverHydroelectric Turbine
OwnershipSingle Owner
Nameplate Capacity0.4 MW
Nameplate Power Factor0.8
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateAugust 1982
Combined Heat & Power No
Sector NameIndustrial CHP (7)
Energy SourceWater
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full LoadOVER

Generator GEN6 Details Operating January 1986

TechnologyWood/Wood Waste Biomass
Prime MoverSteam Turbine
OwnershipSingle Owner
Nameplate Capacity7.5 MW
Nameplate Power Factor0.8
Summer Capacity7.5 MW
Winter Capacity7.5 MW
Minimum Load0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJanuary 1986
Combined Heat & Power Yes
Sector NameIndustrial CHP (7)
Topping Or BottomingT
Energy SourceBlack Liquor / Wood/Wood Waste Solids / Natural Gas / Residual Fuel Oil / Sludge Waste / Other Biomass Solids
Startup SourceResidual Fuel Oil / Gaseous Propane / Natural Gas
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load12H
Multiple FuelsYes
Cofire FuelsYes
Switch Between Oil And Natural GasYes
Multifuel Details
Cofire Energy SourceBLQ / WDS / NG / RFO / OBS / PG
Switch When OperatingYes
Net Summer Capacity With Natural Gas7.5 MW
Net Winter Capacity With Natural Gas7.5 MW
Net Summer Capacity With Oil7.5 MW
Net Winter Capacity With Oil7.5 MW
Time To Switch From Gas To Oil1H
Time To Switch From Oil To Gas1H
Factors That Limit SwitchingYes
Storage LimitsYes

Port Townsend Paper Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Black Liquor.

RankPlant NamePlant LocationAnnual Generation
#65KapStone Kraft Paper CorpRoanoke Rapids, NC209.0 GWh
#66Johnsonburg MillJohnsonburg, PA218.5 GWh
#67Interstate Paper LLC RiceboroRiceboro, GA217.0 GWh
#68Brunswick CelluloseBrunswick, GA406.9 GWh
#69International Paper Vicksburg MillVicksburg, MS223.9 GWh
#70Georgia-Pacific Wauna MillClatskanie, OR198.0 GWh
#71U S Alliance Coosa PinesCoosa Pines, AL151.8 GWh
#72Pixelle Specialty Solutions LLC - Chillicothe FacilityChillicothe, OH231.9 GWh
#73Georgia-Pacific Corp - Nekoosa MillNekoosa, WI189.3 GWh
#74Kaukauna Paper MillKaukauna, WI134.1 GWh
#75Clearwater Paper APP CBArkansas City, AR118.5 GWh
#76IP Springfield OregonSpringfield, OR100.1 GWh
#77Georgia-Pacific Toledo MillToledo, OR122.3 GWh
#78Ticonderoga MillTiconderoga, NY202.9 GWh
#79Mosinee MillMosinee, WI127.4 GWh
#80Androscoggin MillJay, ME78.8 GWh
#82Packaging of America Tomahawk MillTomahawk, WI122.3 GWh
#83Red Shield Envir Old Town FacilityOld Town, ME70.4 GWh
#84KapstoneCharleston, SC407.5 GWh
#85Georgia-Pacific Big IslandBig Island, VA58.5 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Port Townsend Paper.

Plant NamePlant LocationAnnual GenerationDistance
Arlington MicrogridArlington, WA716.6 MWh30.1 mi
Cedar HillsMaple Valley, WA908.0 MWh56.2 mi
Cushman 1Shelton, WA123.5 GWh50.7 mi
Cushman 2Shelton, WA180.1 GWh52.8 mi
DarringtonDarrington, WA33.5 GWh56.4 mi
EncogenBellingham, WA1.0 TWh47.3 mi
Ferndale Generating StationFerndale, WA1.9 TWh51.1 mi
FredoniaMt Vernon, WA1.1 TWh30 mi
H M JacksonSultan, WA328.0 GWh47.1 mi
HF Sinclair Puget Sound RefiningAnacortes, WA1.1 TWh28.3 mi
Lilliwaup Falls GeneratingLilliwaup, WA12.5 GWh45.5 mi
Lower BakerConcrete, WA549.0 GWh57.8 mi
McKinley Paper Co. - Washington MillPort Angeles, WA73.9 GWh31 mi
Rocky Brook HydroelectricBrinnon, WA438.0 MWh26.7 mi
Sierra Pacific Burlington FacilityMt Vernon, WA174.5 GWh29.7 mi
South Fork ToltNorth Bend, WA64.5 GWh54.2 mi
University of Washington Power PlantSeattle, WA6.0 GWh38 mi
West Point Treatment PlantSeattle, WA15.3 GWh34 mi
WhitehornBlaine, WA900.2 GWh54.8 mi
Youngs Creek Hydroelectric ProjectMonroe, WA30.8 GWh50.6 mi