Port Townsend Paper
100 Paper Mill Rd, Port Townsend, WA 98368Plant Summary Information
Port Townsend Paper is ranked #4 out of 4 black liquor power plants in Washington in terms of total annual net electricity generation.
Port Townsend Paper is comprised of 2 generators and generated 8.2 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Port Townsend Paper |
---|---|
Utility Name | Port Townsend Paper Co |
Location | Jefferson County, WA |
Initial Operation Date | January 1929 |
Last Update | Dec 2023 |
Annual Generation | 35.3 GWh |
Annual Consumption | 11.4 M MMBtu |
Ranked #4,321 out of 11,835 Power Plants Nationwide | |
Ranked #80 out of 85 Black Liquor Power Plants Nationwide | |
Ranked #95 out of 134 Washington Power Plants | |
Ranked #4 out of 4 Washington Black Liquor Power Plants | |
Fuel Types | Black Liquor : 81.5% Wood/Wood Waste Solids : 13.7% Natural Gas : 3.5% Waste/Other Oil : 1.3% |
Map of Port Townsend Paper
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Port Townsend Paper.
Monthly Net Generation for Port Townsend Paper
Port Townsend Paper Details
Summary Information | |
---|---|
Plant Name | Port Townsend Paper (50544) |
Plant Address | 100 Paper Mill Rd, Port Townsend, WA 98368 |
Utility | Port Townsend Paper Co (26840) |
Latitude, Longitude | 48.0931, -122.7958 |
Generation Dates on File | Jan 2001 to Dec 2023 |
Initial Operation Date | January 1929 |
Annual Generation | 35.3 GWh |
Fuel Types | Black Liquor : 81.5% Wood/Wood Waste Solids : 13.7% Natural Gas : 3.5% Waste/Other Oil : 1.3% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Bonneville Power Administration (BPAT) |
NAICS Code | Paper Manufacturing (322) |
Sector | Industrial CHP (7) |
Water Source | Bigquilcene Riv &Prttowns Bay |
Ash Impoundment | No |
Transmission / Distribution Owner | PUD No 1 of Jefferson County (59013) WA |
Grid Voltage | 114.00 kV |
Energy Storage | No |
Generator HDRO Details Operating August 1982
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.3 MW |
Winter Capacity | 0.3 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 1982 |
Combined Heat & Power | No |
Sector Name | Industrial CHP (7) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | OVER |
Generator GEN6 Details Operating January 1986
Technology | Wood/Wood Waste Biomass |
---|---|
Prime Mover | Steam Turbine |
Ownership | Single Owner |
Nameplate Capacity | 7.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 7.5 MW |
Winter Capacity | 7.5 MW |
Minimum Load | 0.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | January 1986 |
Combined Heat & Power | Yes |
---|---|
Sector Name | Industrial CHP (7) |
Topping Or Bottoming | T |
Energy Source | Black Liquor / Wood/Wood Waste Solids / Natural Gas / Residual Fuel Oil / Sludge Waste / Other Biomass Solids |
Startup Source | Residual Fuel Oil / Gaseous Propane / Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | BLQ / WDS / NG / RFO / OBS / PG |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 7.5 MW |
Net Winter Capacity With Natural Gas | 7.5 MW |
Net Summer Capacity With Oil | 7.5 MW |
Net Winter Capacity With Oil | 7.5 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Port Townsend Paper Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Black Liquor.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#65 | Georgia-Pacific Wauna Mill | Clatskanie, OR | 181.3 GWh |
#66 | Packaging Corp. of America Jackson Mill | Jackson, AL | 158.4 GWh |
#67 | International Paper Riverdale Mill | Selma, AL | 462.7 GWh |
#68 | Brunswick Cellulose | Brunswick, GA | 377.9 GWh |
#69 | Pixelle Specialty Solutions LLC - Chillicothe Facility | Chillicothe, OH | 205.6 GWh |
#70 | Johnsonburg Mill | Johnsonburg, PA | 137.2 GWh |
#71 | Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 173.0 GWh |
#72 | Kaukauna Paper Mill | Kaukauna, WI | 122.8 GWh |
#73 | Clearwater Paper APP CB | Arkansas City, AR | 110.7 GWh |
#74 | IP Springfield Oregon | Springfield, OR | 91.2 GWh |
#75 | St Francisville Mill | St. Francisville, LA | 116.0 GWh |
#76 | Ticonderoga Mill | Ticonderoga, NY | 187.1 GWh |
#77 | Interstate Paper LLC Riceboro | Riceboro, GA | 103.9 GWh |
#78 | Mosinee Mill | Mosinee, WI | 118.3 GWh |
#79 | Georgia-Pacific Toledo Mill | Toledo, OR | 59.6 GWh |
#81 | Androscoggin Mill | Jay, ME | 69.3 GWh |
#82 | Packaging of America Tomahawk Mill | Tomahawk, WI | 112.9 GWh |
#83 | Red Shield Envir Old Town Facility | Old Town, ME | 66.3 GWh |
#84 | Kapstone | Charleston, SC | 372.9 GWh |
#85 | Georgia-Pacific Big Island | Big Island, VA | 53.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Port Townsend Paper.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Microgrid | Arlington, WA | 697.0 MWh | 30.1 mi |
Cedar Hills | Maple Valley, WA | 454.0 MWh | 56.2 mi |
Cushman 1 | Shelton, WA | 115.5 GWh | 50.7 mi |
Cushman 2 | Shelton, WA | 168.5 GWh | 52.8 mi |
Darrington | Darrington, WA | 16.0 GWh | 56.4 mi |
Encogen | Bellingham, WA | 856.2 GWh | 47.3 mi |
Ferndale Generating Station | Ferndale, WA | 1.7 TWh | 51.1 mi |
Fredonia | Mt Vernon, WA | 846.6 GWh | 30 mi |
H M Jackson | Sultan, WA | 298.0 GWh | 47.1 mi |
HF Sinclair Puget Sound Refining | Anacortes, WA | 990.3 GWh | 28.3 mi |
Lilliwaup Falls Generating | Lilliwaup, WA | 6.0 GWh | 45.5 mi |
Lower Baker | Concrete, WA | 262.8 GWh | 57.8 mi |
McKinley Paper Co. - Washington Mill | Port Angeles, WA | 36.2 GWh | 31 mi |
Rocky Brook Hydroelectric | Brinnon, WA | 219.0 MWh | 26.7 mi |
Sierra Pacific Burlington Facility | Mt Vernon, WA | 160.1 GWh | 29.7 mi |
South Fork Tolt | North Bend, WA | 30.1 GWh | 54.2 mi |
University of Washington Power Plant | Seattle, WA | 6.0 GWh | 38 mi |
West Point Treatment Plant | Seattle, WA | 7.2 GWh | 34 mi |
Whitehorn | Blaine, WA | 449.0 GWh | 54.8 mi |
Youngs Creek Hydroelectric Project | Monroe, WA | 14.9 GWh | 50.6 mi |