Port Everglades
8100 Eisenhower Blvd, Ft. Lauderdale, FL 33316Plant Summary Information
Port Everglades is ranked #18 out of 279 power plants in Florida in terms of total annual net electricity generation.
Port Everglades is comprised of 4 generators and generated 1.9 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Port Everglades |
---|---|
Utility Name | Florida Power & Light Co |
Location | Broward County, FL |
Initial Operation Date | August 1971 |
Last Update | Sep 2024 |
Annual Generation | 5.2 TWh |
Annual Consumption | 39.8 M MMBtu |
Ranked #204 out of 11,852 Power Plants Nationwide | |
Ranked #99 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #18 out of 279 Florida Power Plants | |
Ranked #17 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.8% |
Map of Port Everglades
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Port Everglades.
Monthly Net Generation for Port Everglades
Port Everglades Details
Summary Information | |
---|---|
Plant Name | Port Everglades (617) |
Plant Address | 8100 Eisenhower Blvd, Ft. Lauderdale, FL 33316 |
Utility | Florida Power & Light Co (6452) |
Latitude, Longitude | 26.0856, -80.1253 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | August 1971 |
Annual Generation | 5.2 TWh |
Fuel Types | Natural Gas : 99.8% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Florida Power & Light Company (FPL) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Intracoastal Waterway |
Ash Impoundment | |
Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | FLORIDA GAS TRANSMISSION COMPANY |
Natural Gas Storage | No |
Generator 5A Details Operating April 2016
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 296 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 271.9 MW |
Winter Capacity | 297.1 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 271.9 MW |
Net Winter Capacity With Natural Gas | 297.1 MW |
Net Summer Capacity With Oil | 271.9 MW |
Net Winter Capacity With Oil | 297.1 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 5B Details Operating April 2016
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 296 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 271.9 MW |
Winter Capacity | 297.1 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 271.9 MW |
Net Winter Capacity With Natural Gas | 297.1 MW |
Net Summer Capacity With Oil | 271.9 MW |
Net Winter Capacity With Oil | 297.1 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 5C Details Operating April 2016
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 296 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 271.9 MW |
Winter Capacity | 297.1 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 271.9 MW |
Net Winter Capacity With Natural Gas | 297.1 MW |
Net Summer Capacity With Oil | 271.9 MW |
Net Winter Capacity With Oil | 297.1 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 5ST Details Operating April 2016
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 464 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 421.3 MW |
Winter Capacity | 446.7 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2016 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 421 MW |
Net Winter Capacity With Natural Gas | 446.7 MW |
Net Summer Capacity With Oil | 357 MW |
Net Winter Capacity With Oil | 374 MW |
Time To Switch From Gas To Oil | 6H |
Time To Switch From Oil To Gas | 6H |
Factors That Limit Switching | No |
Port Everglades Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#89 | Sithe Independence Station | Oswego, NY | 5.6 TWh |
#90 | Zeeland Generating Station | Zeeland, MI | 5.6 TWh |
#91 | Acadia Energy Center | Eunice, LA | 5.5 TWh |
#92 | Fayette Energy Facility | Masontown, PA | 5.4 TWh |
#93 | CPV Towantic Energy Center | Oxford, CT | 5.3 TWh |
#94 | Eagle Valley (IN) | Martinsville, IN | 5.3 TWh |
#95 | Carroll County Energy | Carrollton, OH | 5.3 TWh |
#96 | Hays Energy Project | San Marcos, TX | 5.3 TWh |
#97 | Baytown Energy Center | Baytown, TX | 5.2 TWh |
#98 | PSEG Linden Generating Station | Linden, NJ | 5.2 TWh |
#100 | St. Charles Power Station (LA) | La Place, LA | 5.1 TWh |
#101 | Washington Energy Facility | Beverly, OH | 5.1 TWh |
#102 | Brandy Branch | Baldwin, FL | 5.1 TWh |
#103 | Rio Nogales Power Project | Seguin, TX | 5.0 TWh |
#104 | Pasadena Cogeneration | Pasadena, TX | 5.0 TWh |
#105 | Ouachita | Sterlington, LA | 5.0 TWh |
#106 | TVA Southaven Combined Cycle | Southaven, MS | 5.0 TWh |
#107 | Plaquemine Cogeneration Plant | Plaquemine, LA | 5.0 TWh |
#108 | CPV Valley Energy Center | Wawayanda, NY | 5.0 TWh |
#109 | Redbud Power Plant | Luther, OK | 4.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Port Everglades.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CSL Gas Recovery | Pompano Beach, FL | 40.0 GWh | 14.2 mi |
Dania Beach 7 | Ft. Lauderdale, FL | 6.6 TWh | 4.7 mi |
Everglades Solar Energy Center | Homestead, FL | 141.7 GWh | 46 mi |
FIU Solar | Miami, FL | 1.5 GWh | 26.5 mi |
Hibiscus Solar Energy Center | Westlake, FL | 145.9 GWh | 47.9 mi |
IKEA Miami 327 | Miami, FL | 1.4 GWh | 25.9 mi |
Lauderdale | Ft. Lauderdale, FL | 262.3 GWh | 4.7 mi |
Miami Dade County Resource Recovery Fac | Miami, FL | 233.7 GWh | 22.5 mi |
Miami Dade Solar Energy Center | Miami, FL | 129.7 GWh | 38.2 mi |
Palm Beach Renewable Energy Facility 1 | West Palm Beach, FL | 319.5 GWh | 47.4 mi |
Palm Beach Renewable Energy Facility 2 | West Palm Beach, FL | 530.6 GWh | 47.5 mi |
Pembroke Lakes Mall | Pembroke Pines, FL | 596.0 MWh | 12.3 mi |
Riviera | Riviera Beach, FL | 7.6 TWh | 47.2 mi |
Sabal Palm Solar Center | Loxahatchee, FL | 153.1 GWh | 50.2 mi |
Silver Palm | TBD, FL | 126.0 GWh | 50.5 mi |
South District Wastewater Treatment Plt | Miami, FL | 22.6 GWh | 39.3 mi |
Tom G Smith | Lake Worth, FL | 444.0 MWh | 36.6 mi |
Turkey Point | Homestead, FL | 21.4 TWh | 46.7 mi |
West County Energy Center | Loxahatchee, FL | 21.0 TWh | 45.1 mi |
Wheelabrator South Broward | Ft. Lauderdale, FL | 414.3 GWh | 4.7 mi |