POM Plant 2 is ranked #791 out of 799 solar farms in California in terms of total annual net electricity generation.
POM Plant 2 generated 292.0 MWh during the 3-month period between September 2023 to December 2023.
Plant Name | POM Plant 2 |
---|---|
Utility Name | Wonderful Renewable Energy, LLC. |
Location | Fresno County, CA |
Initial Operation Date | December 2021 |
Last Update | Dec 2023 |
Annual Generation | 292.0 MWh |
Annual Consumption | 996 MMBtu |
Ranked #11,185 out of 11,835 Power Plants Nationwide | |
Ranked #5,558 out of 5,643 Solar Power Plants Nationwide | |
Ranked #1,553 out of 1,569 California Power Plants | |
Ranked #791 out of 799 California Solar Power Plants | |
Fuel Types | Solar |
Map of POM Plant 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for POM Plant 2.
Monthly Net Generation for POM Plant 2
POM Plant 2 Details
Summary Information | |
---|---|
Plant Name | POM Plant 2 (66189) |
Plant Address | 5286 S Del Rey Ave, Del Rey, CA 93616 |
Utility | Wonderful Renewable Energy, LLC. (63689) |
Latitude, Longitude | 36.65666, -119.59222 |
Generation Dates on File | Nov 2023 to Dec 2023 |
Initial Operation Date | December 2021 |
Annual Generation | 292.0 MWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Crop Production (111) |
Sector | Industrial Non-CHP (6) |
Water Source | NA |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.00 kV |
Energy Storage | No |
Generator POMP2 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.99 |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 26 |
Tilt Angle | 26 |
DC Net Capacity | 1.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.8 MW |
Virtual Net Metering Agreement | No |
POM Plant 2 Plant Owners
Owner Name | Address | Ownership |
---|---|---|
POM Wonderful LLC | 5286 S Del Rey Ave, Del Rey, CA 93616 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5548 | Amazon MDW7 Solar Project | Monee, IL | 361.0 MWh |
#5549 | Double J Dairy Array | Visalia, CA | 354.0 MWh |
#5550 | Old Bridge Global Landfill CSG | Old Bridge, NJ | 353.0 MWh |
#5551 | POM Juice Solar | Fresno, CA | 352.0 MWh |
#5552 | Corkwood Solar (CSG) | Howland, ME | 344.0 MWh |
#5553 | Redwood Coast Airport Microgrid | McKinleyville, CA | 27.0 MWh |
#5554 | Solar Photovoltaic Project #22 | Redlands, CA | 329.9 MWh |
#5555 | SolarClub 03 | Starbuck, MN | 327.0 MWh |
#5556 | Solops 371 Hoes LLC | Piscataway, NJ | 322.0 MWh |
#5557 | Bibb Williams | Macob, GA | 321.0 MWh |
#5559 | North Ninth Street | Rochelle, IL | 1.9 GWh |
#5560 | Blue Elk IV Solar, LLC | Adrian, MI | 284.0 MWh |
#5561 | Hamlet Solar Energy Storage | Hamlet, NC | 252.0 MWh |
#5562 | Winona Garden | Altura, MN | 257.0 MWh |
#5563 | Wake RJ3 Solar Energy Storage | Wake Forest, NC | 234.9 MWh |
#5564 | Ruler Solar Partners (CSG) | Oswegatchie, NY | 245.0 MWh |
#5565 | Tift Fletcher | Tifton, GA | 245.0 MWh |
#5566 | Royal Solar Partners (CSG) | Oswegatchie, NY | 244.0 MWh |
#5567 | WMATA - Anacostia CSG | Washington, DC | 242.0 MWh |
#5568 | South River H4 Solar Energy Storage | Autryville, NC | 224.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding POM Plant 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2081 Terzian Solar Project | Reedley, CA | 2.0 GWh | 9.8 mi |
Agriculture Capital - Legacy Packing | Dinuba, CA | 1.5 GWh | 13.2 mi |
Algonquin Power Sanger LLC | Sanger, CA | 5.5 GWh | 2.9 mi |
CA - Fresno County - Juvenile Hall | Fresno, CA | 5.4 GWh | 7.4 mi |
Clovis East High School | Clovis, CA | 1.4 GWh | 10.2 mi |
Clovis High School | Clovis, CA | 1.3 GWh | 12.1 mi |
Dinuba Wastewater Treatment Plant | Dinuba, CA | 1.6 GWh | 12.3 mi |
Fresno Sunnyside High School Hybrid | Fresno, CA | 2.5 GWh | 8.8 mi |
FTF-PackingShed | Reedley, CA | 1.1 GWh | 11.8 mi |
Kings River Syphon | Sanger, CA | 1.3 GWh | 11.2 mi |
Kingsburg Cogen | Kingsburg, CA | 4.6 GWh | 8.1 mi |
Kingsburg Solar | Kingsburg, CA | 2.8 GWh | 10.8 mi |
La Joya Del Sol | Fresno, CA | 89.3 MWh | 11.5 mi |
Malaga Power LLC | Fresno, CA | 10.5 GWh | 8.5 mi |
Moonlight Packing - Phase 2 | Reedley, CA | 2.7 GWh | 8.4 mi |
National Raisin | Fowler, CA | 4.8 GWh | 5 mi |
OK Produce Fresno Carport | Fresno, CA | 3.1 GWh | 11.1 mi |
POM Plant 1 | Del Rey, CA | 2.1 GWh | 0.4 mi |
Reedley Community College Solar | Reedley, CA | 4.0 GWh | 8.2 mi |
Rio Bravo Fresno | Fresno, CA | 145.1 GWh | 7.6 mi |