Polk
9995 State Road 37 South, Mulberry, FL 33860Plant Summary Information
Polk is ranked #17 out of 279 power plants in Florida in terms of total annual net electricity generation.
Polk is comprised of 7 generators and generated 1.6 TWh during the 3-month period between June 2024 to September 2024.
Plant Name | Polk |
---|---|
Utility Name | Tampa Electric Co |
Location | Polk County, FL |
Initial Operation Date | September 1996 |
Last Update | Sep 2024 |
Annual Generation | 5.8 TWh |
Annual Consumption | 44.6 M MMBtu |
Ranked #169 out of 11,852 Power Plants Nationwide | |
Ranked #76 out of 2,254 Natural Gas Power Plants Nationwide | |
Ranked #17 out of 279 Florida Power Plants | |
Ranked #16 out of 85 Florida Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Map of Polk
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Polk.
Monthly Net Generation for Polk
Polk Details
Summary Information | |
---|---|
Plant Name | Polk (7242) |
Plant Address | 9995 State Road 37 South, Mulberry, FL 33860 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.7286, -81.9897 |
Generation Dates on File | Jan 2001 to Sep 2024 |
Initial Operation Date | September 1996 |
Annual Generation | 5.8 TWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Lake |
Ash Impoundment | No |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
FLORIDA GAS TRANSMISSION COMPANY GULFSTREAM NATURAL GAS SYSTEM LLC |
Natural Gas Storage | No |
Generator 1CA Details Operating September 1996
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
Nameplate Capacity | 133.4 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 59 MW |
Winter Capacity | 59 MW |
Minimum Load | 33 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Synthesis Gas from Petroleum Coke / Coal-Derived Synthesis Gas |
Solid Fuel Gasification | Yes |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Supercritical Technology | No |
Other Planned Modifications | Yes |
Other Modifications | May 2025 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 1CT Details Operating September 1996
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 192.9 MW |
Nameplate Power Factor | 0.86 |
Summer Capacity | 161 MW |
Winter Capacity | 161 MW |
Minimum Load | 89 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 1996 |
Combined Heat & Power | No |
---|---|
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Synthesis Gas from Petroleum Coke |
Solid Fuel Gasification | Yes |
Time From Cold Shutdown To Full Load | OVER |
Fluidized Bed Technology | No |
Pulverized Coal Technology | No |
Planned Net Summer Capacity Uprate | 29 MW |
Planned Net Winter Capacity Uprate | 42 MW |
Planned Uprate | May 2025 |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 2000
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 175.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 150 MW |
Winter Capacity | 180 MW |
Minimum Load | 89 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2000 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 150 MW |
Net Winter Capacity With Natural Gas | 180 MW |
Net Summer Capacity With Oil | 150 MW |
Net Winter Capacity With Oil | 180 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 3 Details Operating April 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 175.8 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 150 MW |
Winter Capacity | 180 MW |
Minimum Load | 89 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 150 MW |
Net Winter Capacity With Natural Gas | 180 MW |
Net Summer Capacity With Oil | 150 MW |
Net Winter Capacity With Oil | 180 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Air Permit Limits | Yes |
Generator 4 Details Operating March 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 175.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 180 MW |
Minimum Load | 89 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 5 Details Operating April 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | Yes |
Nameplate Capacity | 175.8 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 150 MW |
Winter Capacity | 180 MW |
Minimum Load | 89 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2007 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Generator 2CC Details Operating January 2017
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC2 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 463 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 461 MW |
Winter Capacity | 480 MW |
Minimum Load | 90 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 2017 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Polk Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#66 | P L Bartow | St. Petersburg, FL | 6.2 TWh |
#67 | Bethlehem Power Plant | Bethlehem, PA | 6.1 TWh |
#68 | Montgomery County | Willis, TX | 6.1 TWh |
#69 | Belews Creek | Belews Creek, NC | 8.9 TWh |
#70 | Midlothian Energy Facility | Midlothian, TX | 6.0 TWh |
#71 | Santan | Gilbert, AZ | 6.0 TWh |
#72 | Hamilton Liberty | Towanda, PA | 6.0 TWh |
#73 | Taft Cogeneration Facility | Hahnville, LA | 6.0 TWh |
#74 | Lake Charles Power | West Lake, LA | 5.9 TWh |
#75 | Lake Side Power Plant | Vineyard, UT | 5.9 TWh |
#77 | Linden Cogen Plant | Linden, NJ | 5.8 TWh |
#78 | Doswell Energy Center | Ashland, VA | 5.8 TWh |
#79 | W S Lee | Williamston, SC | 5.7 TWh |
#80 | Lamar Power Project | Paris, TX | 5.7 TWh |
#81 | Lake Road Generating Plant | Dayville, CT | 5.7 TWh |
#82 | Hickory Run Energy Station | New Castle, PA | 5.7 TWh |
#83 | E B Harris Electric Generating Plant | Autaugaville, AL | 5.7 TWh |
#84 | Oneta Energy Center | Broken Arrow, OK | 5.7 TWh |
#85 | Cottonwood Energy Project | Deweyville, TX | 5.6 TWh |
#86 | St Joseph Energy Center | New Carlisle, IN | 5.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Polk.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 105.4 GWh | 2.2 mi |
Bonnie Mine Solar | Bartow, FL | 56.6 GWh | 11.2 mi |
Duette Solar Power Plant | Parrish, FL | 152.8 GWh | 10.8 mi |
Durrance | Mulberry, FL | 108.3 GWh | 3.6 mi |
Fort Green Solar Power Plant | Bowling Green, FL | 158.8 GWh | 6.7 mi |
Grange Hall Solar | Wimauma, FL | 103.3 GWh | 11.2 mi |
Hardee Power Station | Bowling Green, FL | 929.5 GWh | 6.6 mi |
Hines Energy Complex | Bartow, FL | 11.6 TWh | 8.4 mi |
Jamison Solar (FL) | Mulberry, FL | 140.9 GWh | 5.8 mi |
Lake Hancock Solar | Bartow, FL | 90.8 GWh | 2.8 mi |
Lithia Solar | Lithia, FL | 125.7 GWh | 10.8 mi |
Magnolia Solar | Mulberry, FL | 137.0 GWh | 13.6 mi |
Midulla Generating Station | Bowling Green, FL | 2.1 TWh | 6.2 mi |
Mosaic Co Bartow Facility | Bartow, FL | 126.4 GWh | 13.1 mi |
Mosaic New Wales Operations | Mulberry, FL | 420.4 GWh | 8.2 mi |
Mosaic South Pierce Operations | Mulberry, FL | 140.2 GWh | 4 mi |
Mulberry Cogeneration Facility | Bartow, FL | 399.7 GWh | 10.8 mi |
Orange Cogeneration Facility | Bartow, FL | 391.0 GWh | 14.1 mi |
Payne Creek Solar | Bowling Green, FL | 121.5 GWh | 4.7 mi |
Tiger Bay | Ft. Meade, FL | 1.1 TWh | 8.7 mi |