Pleinmont Solar 2
TBD, Spotsylvania, VA 22551Plant Summary Information
Pleinmont Solar 2 is ranked #20 out of 211 power plants in Virginia in terms of total annual net electricity generation.
Pleinmont Solar 2 generated 158.0 GWh during the 3-month period between May 2024 to August 2024.
Plant Name | Pleinmont Solar 2 |
---|---|
Utility Name | AES Distributed Energy |
Location | Spotsylvania County, VA |
Initial Operation Date | August 2021 |
Last Update | Aug 2024 |
Annual Generation | 458.9 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,369 out of 11,835 Power Plants Nationwide | |
Ranked #75 out of 5,643 Solar Power Plants Nationwide | |
Ranked #20 out of 211 Virginia Power Plants | |
Ranked #1 out of 94 Virginia Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Pleinmont Solar 2 LLC (2018 to 2019) AES Distributed Energy (2020 to 2023) |
Map of Pleinmont Solar 2
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pleinmont Solar 2.
Monthly Net Generation for Pleinmont Solar 2
Pleinmont Solar 2 Details
Summary Information | |
---|---|
Plant Name | Pleinmont Solar 2 (62013) |
Plant Address | TBD, Spotsylvania, VA 22551 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 38.24712, -77.78622 |
Generation Dates on File | Sep 2021 to Aug 2024 |
Initial Operation Date | August 2021 |
Annual Generation | 458.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Virginia Electric & Power Co (19876) VA |
Grid Voltage | 500.00 kV |
Energy Storage | No |
Generator PLNM2 Details Operating August 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 240 MW |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 294 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pleinmont Solar 2 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#65 | Lumina II Solar Project | Snyder, TX | 489.6 GWh |
#66 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 475.5 GWh |
#67 | Taygete Energy Project LLC | Coyanosa, TX | 475.0 GWh |
#68 | Pisgah Ridge Solar, LLC | Richland, TX | 474.9 GWh |
#69 | Eiffel Solar Project | Paris, TX | 474.7 GWh |
#70 | SE Athos II, LLC | Desert Center, CA | 473.9 GWh |
#71 | Misae Solar | Childress, TX | 472.4 GWh |
#72 | Mesquite Solar 3, LLC | Tonopah, AZ | 462.5 GWh |
#73 | Townsite Solar Project Hybrid | Boulder City, NV | 444.2 GWh |
#74 | RE Tranquillity | Cantua Creek, CA | 450.4 GWh |
#76 | Rambler | San Angelo, TX | 441.1 GWh |
#77 | Blue Jay Solar I, LLC | Iola, TX | 435.4 GWh |
#78 | Muscle Shoals | Cherokee, AL | 437.0 GWh |
#79 | Hickory Park Solar Hybrid | Camilla, GA | 432.5 GWh |
#80 | Chaparral Springs | Rosamond, CA | 427.4 GWh |
#81 | Hecate Energy Frye Solar LLC | Kress, TX | 426.9 GWh |
#82 | Twiggs Solar | Dry Branch, GA | 424.8 GWh |
#83 | Sun Streams, LLC | Arlington, AZ | 413.4 GWh |
#84 | Shakes Solar | Carrizo Springs, TX | 411.5 GWh |
#85 | Fort Bend Solar LLC | East Bernard, TX | 410.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pleinmont Solar 2.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Stafford | Stafford, VA | 1.2 GWh | 22.3 mi |
Apple Grove Solar, LLC | Mineral, VA | 166.0 MWh | 23 mi |
Desper Solar | Louisa, VA | 106.3 GWh | 21.2 mi |
Electric Avenue Facility | Culpeper, VA | 480.0 MWh | 10.9 mi |
Energix Aditya, LLC | Mineral, VA | 6.3 GWh | 18.3 mi |
Energix Nokesville, LLC | Nokesville, VA | 37.3 GWh | 31.2 mi |
Gordonsville Energy LP | Gordonsville, VA | 1.1 TWh | 24.2 mi |
Highlander Solar Energy Station 1 | Spotsylvania, VA | 304.1 GWh | 0 mi |
Ladysmith | Woodford, VA | 660.1 GWh | 19.1 mi |
Louisa Generation Facility | Gordonsville, VA | 236.9 GWh | 24.9 mi |
Marsh Run Generation Facility | Remington, VA | 215.4 GWh | 19.5 mi |
Martin Solar Center | Kents Store, VA | 9.1 GWh | 29.1 mi |
North Anna | Mineral, VA | 14.9 TWh | 12.9 mi |
Palmer Solar Center | Troy, VA | 9.8 GWh | 31 mi |
Pleinmont Solar 1 | Spotsylvania, VA | 146.1 GWh | 0 mi |
Remington | Remington, VA | 365.5 GWh | 20.5 mi |
Remington Solar Facility | Remington, VA | 31.9 GWh | 20.8 mi |
Richmond Spider Solar | Spotsylvania, VA | 38.2 GWh | 0 mi |
Waste Management King George LFGTE | King George, VA | 80.9 GWh | 26 mi |
Whitehouse Solar Farm | Louisa, VA | 49.0 GWh | 18.5 mi |